Minutes:
R Marber introduced the item to members and said it had been referred to the committee due to the contrary views of Markyate Parish Council.
It was proposed by Councillor Whitman and seconded by Councillor Birnie to grant the application in line with the officer’s recommendation.
Vote
For: 8 Against: 0 Abstained: 1
Resolved:
That planning permission be GRANTED subject to the following conditions:
1 |
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.
|
2 |
The development hereby permitted shall be carried out in accordance with the following approved plans/documents:
Planning Statement DLA Ref: 17/227 May 2018 473-100-D Reason: For the avoidance of doubt and in the interests of proper planning.
|
3 |
No development shall take place above damp proof course level until details of both hard and soft landscape works shall have been submitted to and approved in writing by the local planning authority. These details shall include:
hard surfacing materials; soft landscape works which shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities; proposed finished levels or contours;
The approved landscape works shall be carried out prior to the first occupation of the development hereby permitted.
Reason: To ensure a satisfactory appearance to the development and to safeguard the visual character of the immediate area; in accordance with Policy CS12 of the Core Strategy (2013).
|
4 |
All planting, seeding or turfing and soil preparation comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following first occupation of the building; and any trees or plants which within a period of five years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written approval to any variation. All landscape works shall be carried out in accordance with the guidance contained in British Standards unless otherwise agreed in writing by the Local Planning Authority.
Reason: To ensure proper implementation of the agreed landscape details in the interest of the amenity value of the development; in accordance with Saved Policies 99 and 100 of the Local Plan (2004).
|
5 |
The existing dwelling shown on Drawing No. P0659/13/G dated 13.08.14 shall be demolished and the materials removed prior to the first occupation of the dwellings hereby permitted.
Reason: This represents inappropriate development in the Green Belt and was allowed subject to a business tie. As the business will no longer exist this dwelling will need to be removed in order to safeguard and maintain the openness of the Green belt in accordance with the Core Strategy Policy CS5 (2013) and the NPPF (2018).
|
6 |
The bath and en-suite windows at ground floor level in the front and side elevations of the dwellings hereby permitted shall be permanently fitted with obscured glass unless otherwise agreed in writing by the local planning authority.
Reason: In the interests of the residential amenities of the occupants of the adjacent dwellings and future occupiers of the application site; in accordance with Policy CS12 of the Core Strategy (2013).
|
7 |
All existing structures shown for demolition in plan ref: 473-100-B shall be demolished and the materials removed piror to the first occupation of the development hereby permitted.
Reason: To safeguard and maintain the openness of the Green Belt in accordance with Policy CS5 of the Core Strategy (2013) and the NPPF (2018).
|
8 |
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the local planning authority:
Schedule 2 Part 1 Classes A, C and E
Reason: To safeguard and maintain the openness of the Green Belt in accordance with Policy CS5 of the Core Strategy (2013) and the NPPF (2018).
|
9 |
Prior to the commencement of the development hereby permitted a Phase I Report to assess the actual or potential contamination at the site shall be submitted to and approved in writing by the local planning authority. If actual or potential contamination and/or ground gas risks are identified further investigation shall be carried out and a Phase II report shall be submitted to and approved in writing by the local planning authority prior to the commencement of the development. If the Phase II report establishes that remediation or protection measures are necessary a Remediation Statement shall be submitted to and approved in writing by the Local Planning Authority. For the purposes of this condition:
A Phase I Report consists of a desk study, site walkover, conceptual model and a preliminary risk assessment. The desk study comprises a search of available information and historical maps which can be used to identify the likelihood of contamination. A simple walkover survey of the site is conducted to identify pollution linkages not obvious from desk studies. Using the information gathered, a 'conceptual model' of the site is constructed and a preliminary risk assessment is carried out.
A Phase II Report consists of an intrusive site investigation and risk assessment. The report should make recommendations for further investigation and assessment where required.
A Remediation Statement details actions to be carried out and timescales so that contamination no longer presents a risk to site users, property, the environment or ecological systems.
Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development in accordance with Policy CS32 of the Core Strategy (2013).
|
10 |
All remediation or protection measures identified in the Remediation Statement referred to in Condition 9 shall be fully implemented within the timescales and by the deadlines as set out in the Remediation Statement and a Site Completion Report shall be submitted to and approved in writing by the local planning authority prior to the first occupation of any part of the development hereby permitted.
For the purposes of this condition a Site Completion Report shall record all the investigation and remedial or protection actions carried out. It shall detail all conclusions and actions taken at each stage of the works including validation work. It shall contain quality assurance and validation results providing evidence that the site has been remediated to a standard suitable for the approved use.
Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development in accordance with Policy CS32 of the Core Strategy (2013).
Contamination Informative: Paragraph 121 of the NPPF states that all site investigation information must be prepared by a competent person. This is defined in the framework as 'A person with a recognised relevant qualification, sufficient experience in dealing with the type(s) of pollution or land instability, and membership of a relevant professional organisation.'
Contaminated Land Planning Guidance can be obtained from Regulatory Services or via the Council's website www.dacorum.gov.uk
Un-expected Contaminated Land Informative In the event that contamination is found at any time when carrying out the approved development that was not previously identified, it must be reported in writing immediately to the Local Planning Authority with all works temporarily suspended because, the safe development and secure occupancy of the site lies with the developer.
|
11 |
No development shall take place above damp proof course level until information on the number and position of fire hydrants has been submitted to and approved in writing with the Local Planning Authority. The relevant details shall include information on how the hydrants will be incorporated into the mains water services whether by means of existing water services or new mains or extension to or diversion of existing services or apparatus. The fire hydrants shall be implemented prior to occupation of the new units.
Reason: In the interests of health and safety; in accordance with Policy CS12 of the Core Strategy (2013).
|
12 |
No development shall take place until a Construction Management Plan has been submitted to and approved in writing by the local planning authority. The plan should consider all phases of the development.
a) Construction vehicle numbers, type, routing b) Traffic management requirements c) Construction and storage compounds (including areas designated for car parking) d) Siting and details of wheel washing facilities e) Cleaning of site entrances, site tracks and the adjacent public highway f) Timing of construction activities to avoid school pick up/drop off times g) Provision of sufficient on-site parking prior to commencement of construction activities h) Post construction restoration/reinstatement of the working areas and temporary access to the public highway i) Construction or Demolition Hours of Operation j) Dust and Noise control measure k) Asbestos control measure where applicable
The construction of the development shall only be carried out in accordance with these approved details.
Reason: In order to protect highway safety and the amenity of other users of the public highway and rights of way, in accordance with Core Strategy (2013) Policies CS8 and CS12.
|
13 |
The proposed access, driveway and turning area hereby approved and detailed in plan ref: 473-100-B shall have capacity to carry 9 tonnes vehicles.
Reason: To ensure safe and satisfactory means of access in accordance with Policies CS8 and CS12 of the Core Strategy (2013). Highways Informative
1. The Highway Authority requires the alterations to or the construction of the vehicle crossovers to be undertaken such that the works are carried out to their specification and by a contractor who is authorised to work in the public highway. If any of the works associated with the construction of the access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.), the applicant will be required to bear the cost of such removal or alteration. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission and requirements. The applicant may need to apply to Highways (Telephone 0300 1234047) to arrange this, or use link:- https://www.hertfordshire.gov.uk/droppedkerbs/ 2. Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website: http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047. 3. Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047.
Article 35 Statement
Planning permission has been granted for this proposal. The Council acted pro-actively through early engagement with the applicant at the pre-application stage which lead to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 41) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015. |