4/00536/18/FUL - CONSTRUCTION OF 2 BED DWELLING (AMENDED SCHEME) - 2 COWPER ROAD, MARKYATE, ST ALBANS, AL3 8PR

Minutes:

J Gardner introduced the item to members and said it had been referred to the committee due to the contrary views of Markyate Parish Council.

It was proposed by Councillor Birnie and seconded by Councillor Bateman to grant the application in line with the officer’s recommendation.

Vote

For: 6               Against: 1                    Abstained: 0

Resolved

That planning permission be GRANTED subject to the following conditions:

1

The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

2

The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

 

A100     Rev. C

A101     Rev. C

A102     Rev. D

 

Reason: For the avoidance of doubt and in the interests of proper planning.

 

3

No development shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the local planning authority.  Development shall be carried out in accordance with the approved details.  Please do not send materials to the council offices.  Materials should be kept on site and arrangements made with the planning officer for inspection.

 

Reason:  To ensure a satisfactory appearance to the development, in accordance with Policy CS12 of the Dacorum Core Strategy.

 

4

No development (other than demolition) shall commence until a Phase I Report to assess the actual or potential contamination at the site has been submitted to and approved in writing by the local planning authority. If actual or potential contamination and/or ground gas risks are identified further investigation shall be carried out and a Phase II report shall be submitted to and approved in writing by the local planningauthority prior to the commencement of development (other than demolition). If the Phase II report establishes that remediation or protection measures are necessary, a Remediation Statement shall be submitted to and approved in writing by the Local Planning Authority.

For the purposes of this condition:

 

A Phase I Report consists of a desk study, site walkover, conceptual model and a preliminary risk assessment. The desk study comprises a search of available information and historical maps which can be used to identify the likelihood of contamination. A simple walkover survey of the site is conducted to identify pollution linkages not obvious from desk studies. Using the information gathered, a 'conceptual model' of the site is constructed and a preliminary risk assessment is carried out.

 

A Phase II Report consists of an intrusive site investigation and risk assessment. The report shouldmake recommendations for further investigation and assessment where required.

 

A Remediation Statement details actions to be carried out and timescales so that contamination no longer presents a risk to site users, property, the environment or ecological systems.

 

Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development, in accordance with Policy CS32 of the Dacorum Core Strategy.   

 

5

All remediation or protection measures identified in the Remediation Statement referred to in Condition 4 shall be fully implemented within the timescales and by the deadlines as set out in the Remediation Statement and a Site Completion Report shall be submitted to and approved in writing by the local planning authority prior to the first occupation of any part of the development hereby permitted.

For the purposes of this condition a Site Completion Report shall record all the investigation and remedial or protection actions carried out. It shall detail all conclusions and actions taken at each stage of the works including validation work. It shall contain quality assurance and validation results providing evidence that the site has been remediated to a standard suitable for the approved use.

 

Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development, in accordance with Policy CS32 of the Dacorum Core Strategy.

 

6

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the local planning authority:

 

Schedule 2 Part 1 Classes A, B and D

 

Reason:  To enable the local planning authority to retain control over the development in the interests of safeguarding the residential and visual amenity of the locality and in the interests of highway safety, in accordance with Policies CS8, CS11 and CS12 of the Dacorum Core Strategy.

7

Pedestrian visibility splays of 2m x 2m shall be provided, and thereafter maintained, on each side of both accesses, within which there shall be no obstruction to visibility between 0.6m and 2m above the footway.

Reason: In the interest of highway safety.

 

Article 35 Statement

 

Planning permission has been granted for this proposal. The Council acted pro-actively through early engagement with the applicant prior to the submission of the application  which lead to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraphs 186 and 187) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015. 

 

INFORMATIVES

 

1. The Highway Authority requires the alterations to or the construction of the vehicle crossovers to be undertaken such that the works are carried out to their specification and by a contractor who is authorised to work in the public highway. If any of the works associated with the construction of the access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.), the applicant will be required to bear the cost of such removal or alteration. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission and requirements. The applicant may need to apply to Highways (Telephone 0300 1234047) to arrange this, or use link:- https://www.hertfordshire.gov.uk/droppedkerbs/

2. Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website: http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047.

3. Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047

 

 

 