Agenda item

4/00784/18/FUL - PARTIAL DEMOLITION OF EXISTING SINGLE STOREY SIDE EXTENSION AND CONSTRUCTION OF THREE BEDROOM END OF TARRACE DWELLING - 22 WICK ROAD, WIGGINTON, TRING, HP23 6EL

Minutes:

E Palmer introduced the item to members and said it had been referred to committee due to a councillor call-in. E Palmer advised members that a condition was missing in relation to hard and soft landscaping which would be included if the application was granted.

Graham Quinn spoke in objection to the application.

Christian Pinchin spoke in support of the application.

It was proposed by Councillor C Wyatt-Lowe and seconded by Councillor Birnie to grant the application in line with the officer’s recommendation.

Vote

For: 7               Against: 0                    Abstained: 1

Resolved

That planning permission be GRANTED subject to the following conditions:

1.    The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

2.   No development shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the local planning authority.  Development shall be carried out in accordance with the approved details.  Please do not send materials to the council offices.  Materials should be kept on site and arrangements made with the planning officer for inspection.

 

Reason:  To ensure a satisfactory appearance to the development.

 

3.   No development, shall take place until a Phase I Report to assess the actual or potential contamination at the site has been submitted to and approved in writing by the local planning authority. If actual or potential contamination and/or ground gas risks are identified, further investigation shall be carried out and a Phase II report shall be submitted to and approved in writing by the local planning authority prior to the commencement of the development. If the Phase II report establishes that remediation or protection measures are necessary, a Remediation Statement shall be submitted to and approved in writing by the Local Planning Authority.

 

For the purposes of this condition:

 

A Phase I Report consists of a desk study, site walkover, conceptual model and a preliminary risk assessment. The desk study comprises a search of available information and historical maps which can be used to identify the likelihood of contamination. A simple walkover survey of the site is conducted to identify pollution linkages not obvious from desk studies. Using the information gathered, a 'conceptual model' of the site is constructed and a preliminary risk assessment is carried out.

 

A Phase II Report consists of an intrusive site investigation and risk assessment. The report should make recommendations for further investigation and assessment where required.

 

A Remediation Statement details actions to be carried out and timescales so that contamination no longer presents a risk to site users, property, the environment or ecological systems.

 

Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development, in accordance with Core Strategy (2013) Policy CS32.

 

4.   All remediation or protection measures identified in the Remediation Statement referred to in Condition 3 above shall be fully implemented within the timescales and by the deadlines as set out in the Remediation Statement and a Site Completion Report shall be submitted to and approved in writing by the local planning authority prior to the first occupation of any part of the development hereby permitted.

 

For the purposes of this condition: a Site Completion Report shall record all the investigation and remedial or protection actions carried out. It shall detail all conclusions and actions taken at each stage of the works including validation work. It shall contain quality assurance and validation results providing evidence that the site has been remediated to a standard suitable for the approved use.

 

Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development, in accordance with Core Strategy (2013) Policy CS32 and the NPPF (2012).

 

5.No part of the development shall begin until a means of access has been constructed in accordance with Roads in Hertfordshire: Highway Design Guide 3rd Edition.

 

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and of the access and to comply with CS12.

 

6. The development shall not be brought into use until a new vehicle crossover has been constructed to the current specification of the Highway Authority and to the Local Planning Authority's satisfaction.

 

Reason: In the interest of highway safety and amenity and to ensure the development makes adequate provision for on-site parking and manoeuvring of vehicles likely to be associated with its use and to comply with CS12.

 

7.Prior to the commencement of the use hereby permitted the proposed onsite car parking areas shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan drawing no 0186_107 P01 and retained thereafter available for that specific use.

 

Reason: To ensure the permanent availability of the parking area, in the interests of highway safety and to comply with CS12.

 

8.The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

 

PLANS 1,2,3,4,5

101 P06,

102 P06,

103 P06,

104 P06,

105 P06

DESIGN AND ACCESS

Proposed Vehicle Crossover details 107 P01

CIL

 

Reason: For the avoidance of doubt and in the interests of proper planning.

 

Informatives:

 

Planning permission has been granted for this proposal. The Council acted pro-actively through early engagement with the applicant at the pre-application stage which lead to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraphs 186 and 187) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015. 

 

Environmental Health

 

Paragraph 121 of the NPPF states that all site investigation information must be prepared by a competent person. This is defined in the framework as 'A person with a recognised relevant qualification, sufficient experience in dealing with the type(s) of pollution or land instability, and membership of a relevant professional organisation.' Contaminated Land Planning Guidance can be obtained from Regulatory Services or via the Council's website www.dacorum.gov.uk

 

2). Construction Hours of Working – (Plant & Machinery) Informative

In accordance with the councils adopted criteria, all noisy works associated with site demolition, site preparation and construction works shall be limited to the following hours: 0730hrs to 1830hrs on Monday to Saturdays, no works are permitted at any time on Sundays or bank holidays.

 

3). Un-expected Contaminated Land Informative

In the event that contamination is found at any time when carrying out the approved development that was not previously identified, it must be reported in writing immediately to the Local Planning Authority with all works temporarily suspended because, the safe development and secure occupancy of the site lies with the developer.

 

4). Construction/Demolition Dust Informative

Dust from operations on the site should be minimised by spraying with water or by carrying out of other such works that may be necessary to suppress dust. Visual monitoring of dust is to be carried out continuously and Best Practical Means (BPM) should be used at all times. The applicant is advised to consider the control of dust and emissions from construction and demolition Best Practice Guidance, produced in partnership by the Greater London Authority and London Councils.

 

In addition, the applicant must ensure any concern with an asbestos release during demolition work where this is applicable is adequately addressed.

 

5).  Noise on Construction/Demolition Sites Informative

The attention of the applicant is drawn to the Control of Pollution Act 1974 relating to the control of noise on construction and demolition sites.

 

I hope the above clarify our position on the submitted application?

 

Should you have any further query in respect of the application, please do not hesitate contact me on Ext 2719 quoting Flare reference 547872.

 

Highways

 

As you are aware the installation of a dropped kerb for vehicular crossover off unclassified road and the provision of hard surfacing to create a front driveway does not require planning permission in itself subject to the hard surfacing being made of porous materials or provision being made to direct run-off water from the hard surface to a permeable or porous area or surface within the curtilage of the dwelling house. However, the provision of a new dropped kerb would require the formal approval of the Local Highway Authority – which in this case is Hertfordshire county Council (HCC).

New or amended crossover – construction standards

AN1) Construction standards for new/amended vehicle access: Where works are required within the public highway to facilitate the new or amended vehicular access, the Highway Authority require the construction of such works to be undertaken to their satisfaction and specification, and by a contractor who is authorised to work in the public highway. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission, requirements and for the work to be carried out on the applicant's behalf. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/changes-to-your-road/dropped-kerbs/dropped-kerbs.aspx or by telephoning 0300 1234047.

Storage of materials

AN2) Storage of materials: The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspxor by telephoning 0300 1234047.

Obstruction of the highway

AN3) Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

Mud on highway

AN4) Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/highways-roads-and-pavements.aspx or by telephoning 0300 1234047.

 

Supporting documents: