Minutes:
E Palmer introduced the item and said it had been referred to committee due to the contrary views of Little Gaddesden Parish Council.
Shaun Andrews spoke in support of the application.
It was proposed by Councillor C Wyatt-Lowe and seconded by Councillor P Hearn to grant the application in line with the officer’s recommendation.
Vote
For: 10 Against: 0 Abstained: 1
Resolved
That planning permission be GRANTED subject to the following conditions:
1 |
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. |
2 |
No development shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the local planning authority. Development shall be carried out in accordance with the approved details. Please do not send materials to the council offices. Materials should be kept on site and arrangements made with the planning officer for inspection.
Reason: In the interests of the visual amenities of the Conservation Area and to comply with CS27. |
3 |
No development shall take place until full details of both hard and soft landscape works shall have been submitted to and approved in writing by the local planning authority. These details shall include:
· hard surfacing materials; · means of enclosure; · soft landscape works which shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate; · trees to be retained and measures for their protection during construction works; · proposed finished levels or contours; · car parking layouts and other vehicle and pedestrian access and circulation areas;
The approved landscape works shall be carried out prior to the first occupation of the development hereby permitted.
Reason: To ensure a satisfactory appearance to the development and to safeguard the visual character of the immediate area and to comply with CS 12 and 27. |
4 |
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the local planning authority:
Schedule 2 Part 1 Classes [A, B, C, D, E, F, G and H] Part 2 Classes [A, B and C].
Reason: To enable the local planning authority to retain control over the development by nature of the size of the site and in the interests of safeguarding the residential and visual amenity of the locality and to comply with CS 12 and 27. |
5 |
The development hereby permitted shall be carried out in accordance with the following approved plans/documents:
site location plan 2107.21 block plan 2107.27 existing elevations 2107.23 existing floor plans 2107.22 proposed floor plans 2107.25A proposed elevation 2107.26B
Reason: For the avoidance of doubt and in the interests of proper planning.
Informatives:
Article 35 Statement
Planning permission has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant during the determination process which led to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraphs 186 and 187) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.
Highways 1. All materials and equipment to be used during the construction shall be stored within the curtilage of the site unless otherwise agreed in writing by the Highways Authority prior to commencement of the development. 2. Road deposits. Best practical means shall be taken at all times to ensure that all vehicles leaving the development site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. 3. Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website: http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047. 4. Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047
|
Supporting documents: