Agenda item

4/01804/17/FUL - TWO STOREY, SINGLE STOREY EXTENSION, FRONT AND REAR DORMER TO EXISTING DWELLING. CONSTRUCTION OF NEW 4 BED DWELLING ADJACENT TO EXISTING DWELLING - 17 CHESNUT DRIVE, BERKHAMSTED, HP4 2JL

Minutes:

B Curtain introduced the item and said it had been referred to committee due to the contrary views of Berkhamsted Town Council.

It was proposed by Councillor Birnie and seconded by Councillor C Wyatt-Lowe to grant the application in line with the officer’s recommendation.

Vote

For: 10             Against: 0                    Abstained: 0

Resolved:

That planning permission be GRANTED subject to the following conditions:

 

1

The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

2

The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

 

DBC/17/6/1

DBC/17/6/2A

DBC/17/6/3A

Design and Access Statement

Application form.

 

Reason: For the avoidance of doubt and in the interests of proper planning.

 

3

The development hereby permitted shall be constructed fully in accordance with the materials specified on the approved drawings and application form.

 

Reason: To ensure a satisfactory appearance to the development in accordance with Policy CS12 of the Core Strategy.

 

 

4

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995  (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the local planning authority:

 

Schedule 2 Part 1 Classes A

 

Reason: To enable the local planning authority to retain control over the development in the interests of safeguarding the residential and visual amenity of the locality.

 

5

The additional dwelling hereby permitted shall not be occupied until the arrangements for vehicle parking, shown on Drawing No. DBC/17/6/3A shall have been provided, and they shall not be used thereafter otherwise than for the purposes approved.

 

Reason: To ensure the adequate and satisfactory provision of off-street vehicle parking facilities.

 

6

Pedestrian visibility splays of 2 m x 2 m shall be provided before the new dwelling is first brought into use, and they shall thereafter be maintained, on both sides of the entrance to the site, within which there shall be no obstruction to visibility between 600 mm and 2 m above the carriageway.

 

Reason: In the interest of highway safety; in accordance with Policies CS8 and CS12 of the Core Strategy (2013).

 

7

The gradient of the vehicular access shall not exceed 1:10 for the first 5 metres into the site as measured from the near channel edge of the adjacent carriageway.

Reason: In the interests of the safety of persons using the access and users of the highway; in accordance with Policies CS8 and CS12 of the Core Strategy (2013).

 

Article 35;

Planning permission has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant during the determination process which led to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraphs 186 and 187) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.  

 

INFORMATIVES:

1. The Highway Authority requires the alterations to or the construction of the vehicle crossovers to be undertaken such that the works are carried out to their specification and by a contractor who is authorised to work in the public highway. If any of the works associated with the construction of the access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.), the applicant will be required to bear the cost of such removal or alteration. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission and requirements. The applicant may need to apply to Highways (Telephone 0300 1234047) to arrange this, or use link:- https://www.hertfordshire.gov.uk/droppedkerbs/

2. Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website: http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047.

3. Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047

4. All materials and equipment to be used during the construction should be stored within the curtilage of the site unless otherwise agreed in writing by the Highways Authority prior to commencement of the development.

 

Informative:

 

Paragraph 121 of the NPPF states that all site investigation information must be prepared by a competent person. This is defined in the framework as 'A person with a recognised relevant qualification, sufficient experience in dealing with the type(s) of pollution or land instability, and membership of a relevant professional organisation.'

 

Contaminated Land Planning Guidance can be obtained from Regulatory Services or via the Council's website www.dacorum.gov.uk 

 

Article 35 Statement

 

Planning permission has been granted for this proposal. Discussion with the applicant to seek an acceptable solution was not necessary in this instance. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraphs 186 and 187) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.

 

 

Supporting documents: