4/00545/17/MFA - DEMOLITION OF EXISTING GARAGES AND CONSTRUCTION OF 14 FLATS WITH CAR-PARKING - GARAGE COURT ADJ 83 TURNERS HILL, HEMEL HEMPSTEAD, HP2

Minutes:

Councillor Tindall declared an interest in this application and remove himself from the chamber. He did not speak or vote on this item.

B Curtain introduced the report and said it had been referred to committee due to Councillor Tindall having called in the application.

Pamela Anderson spoke in objection to the application.

Martin Stent spoke in support of the application.

It was proposed by Councillor Ritchie and seconded by Councillor P Hearn to grant the application in line with the officer’s recommendation.

Vote

For: 5               Against: 1                    Abstained: 5

 

Resolved:

That planning permission be GRANTED subject to the following conditions:

1

The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

2

The development hereby permitted shall be constructed fully in accordance with the materials specified on the approved drawings and documents.

 

Reason:  To ensure a satisfactory appearance to the developmen in accordance with Policy CS12 of the Core Strategy.

 

 

3

Prior to construction of the development hereby approved details of both hard and soft landscape works shall have been submitted to and approved in writing by the local planning authority.  These details shall include:

 

i.      hard surfacing materials (including roads/footpaths/driveways/courtyards etc);

·        means of enclosure;

·        soft landscape works which shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate; and

·        external lighting.

·        trees to be retained and measures for their protection during construction works;

·        arrangements for bin storage

 

The approved landscape works shall be carried out prior to the first occupation of the development hereby permitted. The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season and maintained until satisfactorily established.

               

Reason:  To ensure a satisfactory appearance to the development and to safeguard the visual character of the immediate area; in accordance with Policy CS12 of the Core Strategy (2013).

 

4

Prior to the commencement of the development hereby permitted a Phase I Report to assess the actual or potential contamination at the site shall be submitted to and approved in writing by the local planning authority. If actual or potential contamination and/or ground gas risks are identified further investigation shall be carried out and a Phase II report shall be submitted to and approved in writing by the local planning authority prior to the commencement of the development. If the Phase II report establishes that remediation or protection measures are necessary a Remediation Statement shall be submitted to and approved in writing by the Local Planning Authority.

For the purposes of this condition:

 

A Phase I Report consists of a desk study, site walkover, conceptual model and a preliminary risk assessment. The desk study comprises a search of             available information and historical maps which can be used to identify the likelihood of contamination. A simple walkover survey of the site is conducted to identify pollution linkages not obvious from desk studies. Using the       information gathered, a 'conceptual model' of the site is constructed and a   preliminary risk assessment is carried out.

 

A Phase II Report consists of an intrusive site investigation and risk assessment. The report should make recommendations for further investigation and assessment where required.

           

A Remediation Statement details actions to be carried out and timescales so that contamination no longer presents a risk to site users, property, the environment or ecological systems.

 

Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development.  

 

 

5

All remediation or protection measures identified in the Remediation Statement referred to in Condition (XXX) shall be fully implemented within the timescales and by the deadlines as set out in the Remediation Statement and a Site Completion Report shall be submitted to and approved in writing by the local planning authority prior to the first occupation of any part of the development hereby permitted.

 

For the purposes of this condition a Site Completion Report shall record all the investigation and remedial or protection actions carried out. It shall detail all conclusions and actions taken at each stage of the works including validation work. It shall contain quality assurance and validation results providing evidence that the site has been remediated to a standard suitable for the approved use.

 

Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development.  

 

Informative:

Paragraph 121 of the NPPF states that all site investigation information must be prepared by a competent person. This is defined in the framework as 'A person with a recognised relevant qualification, sufficient experience in dealing with the type(s) of pollution or land instability, and membership of a relevant professional organisation.'

 

Contaminated Land Planning Guidance can be obtained from Regulatory Services or via the Council's website www.dacorum.gov.uk 

 

6

The development hereby permitted shall not be occupied until the arrangements for vehicle parking, circulation, and access shown on Drawing No. 3199 1. Rev B shall have been provided, and they shall not be used thereafter otherwise than for the purposes approved.

Upon completion of the development, unused access points not incorporated in the development hereby permitted shall be stopped up by raising the existing dropped kerb and reinstating the footway and highway boundary to the same line, level and detail as the adjoining footway verge and highway boundary.

 

Reason:  To ensure the adequate and satisfactory provision of off-street vehicle parking facilities.

 

7

Pedestrian visibility splays of 2 m x 2 m shall be provided before any part of the development is first brought into use, and they shall thereafter be maintained, on both sides of the entrance to the site, within which there shall be no obstruction to visibility between 600 mm and 2 m above the carriageway.

 

Reason:  In the interests of highway safety.

 

8

Visibility splays of not less than 2.4 m x 43 m shall be provided before any part of the development hereby permitted is first brought into use, and they shall thereafter be maintained, in both directions from the crossover, within which there shall be no obstruction to visibility between a height of 0.6 m and 2.0 m above the carriageway. 

 

Reason:  In the interests of highway safety.

 

9

The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

3199.1.Rev B
3199.2.Rev B

Reason: For the avoidance of doubt and in the interests of proper planning.

 

Article 35;

 

Planning permission has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant during the determination process which led to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraphs 186 and 187) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.

INFORMATIVES:

1. The Highway Authority requires the alterations to or the construction of the vehicle crossovers to be undertaken such that the works are carried out to their specification and by a contractor who is authorised to work in the public highway. If any of the works associated with the construction of the access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.), the applicant will be required to bear the cost of such removal or alteration. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission and requirements. The applicant may need to apply to Highways (Telephone 0300 1234047) to arrange this, or use link:- https://www.hertfordshire.gov.uk/droppedkerbs/

2. Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website: http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047.

3. Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047

 

 

Supporting documents: