Minutes:
R Marber introduced the item which is recommended for approval. The application was referred to the committee due to the contrary views of the Kings Langley Parish Council.
It was proposed by Councillor Conway and seconded by Councillor Whitman to grant the application in line with the officer’s recommendation.
Vote
For: 10 Against: 0 Abstained: 0
Resolved:
That planning permission be GRANTED subject to the following conditions:
1 |
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. |
2 |
The development hereby permitted shall be carried out in accordance with the following approved plans/documents:
16/VM- 28 dated 19/4/17 Arboricultural Impact Assessment 4 May 2017
Reason: For the avoidance of doubt and in the interests of proper planning. |
3 |
Within 6 months the date of this permission full details of the materials to be used in the construction of the external surfaces of the development shall be submitted to and approved in writing by the local planning authority. Subsequently the development shall be carried out and retained in accordance with these approved details.
Please do not send materials to the council offices. Materials should be kept on site and arrangements made with the planning officer for inspection.
Reason: To ensure a satisfactory appearance to the development, in accordance with Policy CS12 of the Core Strategy (2013). |
4 |
Prior to the commencement of the development hereby permitted a Phase I Report to assess the actual or potential contamination at the site shall be submitted to and approved in writing by the local planning authority. If actual or potential contamination and/or ground gas risks are identified further investigation shall be carried out and a Phase II report shall be submitted to and approved in writing by the local planning authority prior to the commencement of the development. If the Phase II report establishes that remediation or protection measures are necessary a Remediation Statement shall be submitted to and approved in writing by the Local Planning Authority.
For the purposes of this condition:
A Phase I Report consists of a desk study, site walkover, conceptual model and a preliminary risk assessment. The desk study comprises a search of available information and historical maps which can be used to identify the likelihood of contamination. A simple walkover survey of the site is conducted to identify pollution linkages not obvious from desk studies. Using the information gathered, a 'conceptual model' of the site is constructed and a preliminary risk assessment is carried out.
A Phase II Report consists of an intrusive site investigation and risk assessment. The report should make recommendations for further investigation and assessment where required.
A Remediation Statement details actions to be carried out and timescales so that contamination no longer presents a risk to site users, property, the environment or ecological systems.
Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development; in accordance with Policy CS12 of the Core Strategy (2013) and the NPPF (2012). |
5 |
All remediation or protection measures identified in the Remediation Statement referred to in Condition 4 shall be fully implemented within the timescales and by the deadlines as set out in the Remediation Statement and a Site Completion Report shall be submitted to and approved in writing by the local planning authority prior to the first occupation of any part of the development hereby permitted.
For the purposes of this condition a Site Completion Report shall record all the investigation and remedial or protection actions carried out. It shall detail all conclusions and actions taken at each stage of the works including validation work. It shall contain quality assurance and validation results providing evidence that the site has been remediated to a standard suitable for the approved use.
Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development; in accordance with Policy CS12 of the Core Strategy (2013) and the NPPF (2012).
Informative:
Paragraph 121 of the NPPF states that all site investigation information must be prepared by a competent person. This is defined in the framework as 'A person with a recognised relevant qualification, sufficient experience in dealing with the type(s) of pollution or land instability, and membership of a relevant professional organisation.'
Contaminated Land Planning Guidance can be obtained from Regulatory Services or via the Council's website www.dacorum.gov.uk
|
6 |
Before the access is brought into use the site frontage shall be kept free of all obstruction to visibility over a height of 0.6m for a distance of 0.65m to both sides of the driveway above the adjoining footpath level. Thereafter the frontage shall be retained free of obstruction. Reason: To provide adequate visibility between the existing highway and the proposed access and to make the access safe and convenient for the traffic that is likely to use it; in accordance with Policies CS8 and CS12 of the Core Strategy (2013).
|
7 |
The proposed car parking spaces shall have measurements of 2.4m x 4.8m min. and be located on land within the ownership of the applicant. Such spaces shall be maintained as a permanent ancillary to the development and shall be paved and used for no other purpose. Reason: The above condition is required to ensure the adequate provision of off-street parking at all times in order to minimise the impact on the safe and efficient operation of the adjoining Highway; in accordance with Policies CS8 and CS12 of the Core Strategy (2013).
|
8 |
The development shall not be brought into use until the new vehicle crossover has been constructed to the current specification of the Highway Authority. Reason: In the interest of highway safety and amenity and to ensure the development makes adequate provision for on-site parking and manoeuvring of vehicles likely to be associated with its use; in accordance with Policies CS8 and CS12 of the Core Strategy (2013).
Highway Informatives
1. The Highway Authority requires the alterations to or the construction of the vehicle crossovers to be undertaken such that the works are carried out to their specification and by a contractor who is authorised to work in the public highway. If any of the works associated with the construction of the access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.), the applicant will be required to bear the cost of such removal or alteration. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission and requirements. The applicant may need to apply to Highways (Telephone 0300 1234047) to arrange this, or use link:- https://www.hertfordshire.gov.uk/droppedkerbs/ 2. Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website: http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047. 3. Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047 4. All materials and equipment to be used during the construction shall be stored within the curtilage of the site unless otherwise agreed in writing by the Highways Authority prior to commencement of the development.
Article 35 Statement
Planning permission has been granted for this proposal. The Council acted pro-actively through early engagement with the applicant at the pre-application stage which lead to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraphs 186 and 187) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015. |
Delegated with a view to approval subject to consultation response from Hertfordshire Archaeology.
Amended/Additional Conditions
3. Within 6 months the date of this permission full details of the materials to be used in the construction of the external surfaces including brick bond and mortar of the development shall be submitted to and approved in writing by the local planning authority. Subsequently the development shall be carried out and retained in accordance with these approved details.
Please do not send materials to the council offices. Materials should be kept on site and arrangements made with the planning officer for inspection.
Reason: To ensure a satisfactory appearance to the development, in accordance with Policies CS12 and CS27 of the Core Strategy (2013).
9. Within 6 months the date of this permission full details of the headers and cills to be used in the construction of the windows shall be submitted to and approved in writing by the local planning authority.
These details shall include fenestration joinery details, finish and position within the window surround at 1:20 scale and door details and finish at 1:20 scale.
Reason: To ensure a satisfactory appearance to the development, in accordance with Policies CS12 and CS27 of the Core Strategy (2013).
10. Within 6 months the date of this permission full details of the roof tiles, hanging tiles, rainwater goods and eves details to be used in the construction of the build at a 1:20 scale shall be submitted to and approved in writing by the local planning authority.
Reason: To ensure a satisfactory appearance to the development, in accordance with Policies CS12 and CS27 of the Core Strategy (2013).