4/02580/16/FUL - CONSTRUCTION OF DETACHED TWO BEDROOM, TWO STOREY DWELLING WITH ASSOCIATED PARKING - 1 THE CART TRACK, BELSWAINS LANE, HEMEL HEMPSTEAD, HP3 9XA

Minutes:

M Heron introduced the item and said it had been referred to committee due to the contrary views of Nash Mills Parish Council and Councillor Maddern had called it in.

In her role as ward councillor, Councillor Maddern spoke in objection to the application.

It was proposed by Councillor Birnie and seconded by Councillor C Wyatt-Lowe to grant the application in line with the officer’s recommendation.

Vote

For: 6               Against: 2                    Abstained: 3

Resolved:

That planning permission be GRANTED subject to the following conditions:

1

The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

2

The development hereby permitted shall not be carried out other than in accordance with the following approved plans/documents: J1393/P03 Rev. A & J1393/P04 Rev. A & J1393/P02 Rev. A & J1393/P01.

Reason: For the avoidance of doubt and in the interests of proper planning.

 

3

Prior to the construction of the dwelling hereby approved, full specifications of the materials to be used for the external surfaces shall be submitted to and approved in writing by the Local Planning Authority. Subsequesntly, the development shall be carried out and retained in accordance with details approved in this regard.

 

Reason: In the interests of the character of the area in accordance with Policies CS11 and CS12 of the Dacorum Core Strategy 2013.

 

4

Prior to first occupation of the development hereby permitted full details on a suitably scaled plan of both hard and soft landscape works must be submitted to and approved in writing by the Local Planning Authority. Subsequently, these works shall be in addition to those shown on the approved plans and shall be carried out and retained as approved.  The landscaping details to be submitted shall include:-

a) means of enclosure;

b) existing and proposed finished levels and finished floor levels.

c) planting plans, including specifications of species, sizes, planting centres, planting method and number and percentage mix;

d) details for all external hard surface within the site, including roads, drainage detail  and car parking areas.

Reason: The landscaping of this site is required in order to protect and enhance the existing visual character of the area and to reduce the visual and environmental impacts of the development hereby permitted in accordance with Policies 99 and 100 of the Dacorum Local Plan 2004.

 

5

All planting, seeding or turfing and soil preparation comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following first occupation of the building; and any trees or plants which within a period of five years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written approval to any variation. All landscape works shall be carried out in accordance with the guidance contained in British Standards unless otherwise agreed in writing by the Local Planning Authority.

Reason: To ensure proper implementation of the agreed landscape details in the interest of the amenity value of the development in accordance with Policies 99 and 100 of the Dacorum Local Plan 2004.

 

6

Development other than that required to be carried out as part of an approved scheme of remediation must not commence until parts (a) to (d) below  have been complied with.  If unexpected contamination is found after development has begun, development must be halted on that part of the site affected by the unexpected contamination to the extent specified by the Local Planning Authority in writing until part (d) has been complied with in relation to that contamination.

(a)       Site Characterisation

An investigation and risk assessment, in addition to any assessment provided with the planning application, must be completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site.  The contents of the scheme are subject to the approval in writing of the Local Planning Authority.  The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority. The report of the findings must include:

1.            a survey of the extent, scale and nature of contamination;

 

(ii)        an assessment of the potential risks to:

·        human health,

·        property (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes,

·        adjoining land,

·        groundwaters and surface waters,

·        ecological systems,

·        archeological sites and ancient monuments;

 

(iii)         an appraisal of remedial options, and proposal of the preferred option(s).

This must be conducted in accordance with DEFRA and the Environment Agency’s ‘Model Procedures for the Management of Land Contamination, CLR 11’.

(b)       Submission of Remediation Scheme

A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared, and is subject to the approval in writing of the Local Planning Authority.  The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures.  The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.

(c)       Implementation of Approved Remediation Scheme

The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority.  The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works.

Following completion of measures identified in the approved remediation scheme, a verification report (referred to in PPS23 as a validation report) that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority.

(d)       Reporting of Unexpected Contamination

In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority.  An investigation and risk assessment must be undertaken in accordance with the requirements of part (a) above, and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of part (b), which is subject to the approval in writing of the Local Planning Authority.

Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority in accordance with part (c).

Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy CS32 Dacorum Core Strategy.

Planning permission has been granted for this proposal. Discussion with the applicant to seek an acceptable solution was necessary in this instance. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraphs 186 and 187) and in accordance with the Town and Country Planning (Development Management Procedure) (England) Order 2015.  

 

INFORMATIVES

1. Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website: http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047.

 

2. Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047

 