4/02937/16/FUL - CONVERSION OF AGRICULTURAL BARN TO FORM A PAIR OF SEMI DETACHED DWELLINGS COMPRISING A TWO-BEDROOM UNIT FOR A STABLE MANAGER WITH ASSOCIATED TACK STORAGE, LOCKABLE OFFICER AND A ONE-BEDROOM DWELLING FOR OPEN MARKET HOUSING - BARN 2, FLAUNDEN HOUSE STABLES, FLAUNDEN, HEMEL HEMPSTEAD, HP3 0PW

Minutes:

Councillor Riddick declared an interest in this application. He did not take part in the discussion or voting of this item.

E Palmer introduced the item, this item was deferred at the meeting held on 12th January 2017 to allow for experts to attend and advise members. If members are minded to grant the application then the plan numbers will need to be updated.

Abel Bunu and Sara Tucker spoke in support of the application.

Parish Councillor Pam Esom spoke in objection to the application.

Ian McAleer and John Rugg spoke in objection to the application.

Members discussed at length the viability of the site and the safety issues of having an open market house so close to the stables and the horses.

C Gaunt explained to members that there is a six stage test for imposing conditions and all these criteria must be met.

Members asked if it was possible for the Group Manager to liaise with the applicant to ensure a substantial barrier is implemented between the open market housing and the stables. The applicant agreed.

It was proposed by Councillor Guest and seconded by Councillor Matthews to grant the application in line with the officer’s recommendation.

Vote

For: 6               Against: 1                    Abstained: 3

Resolved

That planning permission be DELEGATED to the Group Manager, Development Management with a view to approval subject to the amendment and signing of the Unilateral Undertaking by relevant parties and the relevant conditions:

1

The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

2

The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in size, colour and texture those used on the existing buildings.

 

Reason:  To ensure a satisfactory appearance to the development and to comply with CS 11,12 and 27.

 

3

No development of the buildings hereby approved shall take place until full details of both hard and soft landscape works have been submitted to and approved in writing by the local planning authority. These details shall include:

• hard surfacing materials;

• means of enclosure;

• soft landscape works which shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate;

• trees to be retained and measures for their protection during construction works;

• car parking layouts and other vehicle and pedestrian access and circulation areas;

• minor artefacts and structures (e.g. furniture, play equipment, refuse or other storage units, signs, lighting etc);

• proposed and existing functional services above and below ground (e.g. drainage, power, communications cables, pipelines etc, indicating lines, manholes, supports etc);

The approved landscape works shall be carried out prior to the first occupation of the development hereby permitted.

Reason: To ensure a satisfactory appearance to the development and to Safeguard the visual character of the immediate area and to comply with CS5,11,12 and 27.

 

4

Prior to the commencement of the development hereby permitted a Phase I Report to assess the actual or potential contamination at the site shall be submitted to and approved in writing by the local planning authority. If actual or potential contamination and/or ground gas risks are identified further investigation shall be carried out and a Phase II report shall be submitted to and approved in writing by the local planning authority prior to the commencement of the development. If the Phase II report establishes that remediation or protection measures are necessary a Remediation Statement shall be submitted to and approved in writing by the Local Planning Authority.

 

For the purposes of this condition:

 

A Phase I Report consists of a desk study, site walkover, conceptual model and a preliminary risk assessment. The desk study comprises a search of available information and historical maps which can be used to identify the likelihood of contamination. A simple walkover survey of the site is conducted to identify pollution linkages not obvious from desk studies. Using the             information gathered, a 'conceptual model' of the site is constructed and a preliminary risk assessment is carried out.

 

A Phase II Report consists of an intrusive site investigation and risk assessment. The report should make recommendations for further investigation and assessment where required.

           

A Remediation Statement details actions to be carried out and timescales so that contamination no longer presents a risk to site users, property, the environment or ecological systems.

 

Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development.  

 

 

5

All remediation or protection measures identified in the Remediation Statement referred to in Condition (4) shall be fully implemented within the timescales and by the deadlines as set out in the Remediation Statement and a Site Completion Report shall be submitted to and approved in writing by the local planning authority prior to the first occupation of any part of the development hereby permitted.

 

For the purposes of this condition a Site Completion Report shall record all the investigation and remedial or protection actions carried out. It shall detail all conclusions and actions taken at each stage of the works including validation work. It shall contain quality assurance and validation results providing evidence that the site has been remediated to a standard suitable for the approved use.

 

Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development.  

 

Informative:

Paragraph 121 of the NPPF states that all site investigation information must be prepared by a competent person. This is defined in the framework as 'A person with a recognised relevant qualification, sufficient experience in dealing with the type(s) of pollution or land instability, and membership of a relevant professional organisation.'

 

Contaminated Land Planning Guidance can be obtained from Regulatory Services or via the Council's website www.dacorum.gov.uk 

 

 

6

Prior to the commencement of development the refurbishment of the stables as described in the application and listed below must be completed.

·        Replacement and renewal of worn felt roof on the stables;

·        Replacement of rotten stable doors with new stable doors;

·        Repoint loose bricks to the bottom of wall; and

·        Renew / seal leaking rainwater goods.

Reason: To ensure that the stables are refurbished and that they are available for the re-establishment of the equestrian use on the site and therefore complies with CS5 with particular reference to supporting the rural economy.

 

7

Prior to the commencement of development plans showing the layout of the equestrian use shall be submitted for approval by the local planning authority to demonstrate the stables, supporting buildings and infrastructure for the operation of the livery yard, provide for horse and pedestrian safety and will support the rural economy in terms of a sustainable equestrian facility.

 

Reason: to ensure the proposed use supports the rural economy and maintenance of the wider green belt countryside as well as highway safety in accordance with policies CS5 (Green Belt), CS9 (Management of roads) of the Core Strategy 2013, Policy 51 (Development and transport Impacts), Policy 81 (Equestrian activities) of the Dacorum Borough Local Plan 2004 and the NPPF.

 

8

Detailed proposals for the fire hydrants serving the development as incorporated into the provision of the mains water services for the development whether by means of existing water services or new mains or extension to or diversion of existing services or apparatus shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development and in accordance with the approved details thereafter implemented prior to occupation of any building forming part of the development.

The development shall thereafter be implemented in accordance with those approved details.

 

Reason: To enable appropriate development to occur, ensure a safe, sustainable form of development which provides for its own infrastructure for fire emergencies in accordance with core strategy policies CS1, CS4, CS12 & CS29.

 

9

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the local planning authority:

 

Schedule 2 Part 1 Classes [A, B, C, D, E, F and G]

Part 2 Classes [A, B and C].

Part 6 Class A

Reason: To enable the local planning authority to retain control over the development in the interests of safeguarding the residential and visual amenity of the locality.

Reason: In the interests of safeguarding the openness of the Green Belt; the rural character of the building and the site; and the visual amenity of the surrounding countryside. The proposed development comprises of the conversion of two agricultural buildings in a rural area and it is important for the local planning authority to retain control over certain future development which would normally represent permitted development, in order to safeguard the rural character of the surrounding countryside.

 

10

The occupation of the two bed conversion shall be limited to a person solely or primarily working at the stables located immediately north-east of the dwelling or a widow or widower of such a person and to any resident dependants.

 

Reason: For the avoidance of doubt and to ensure that the stables opposite will be retained and offered to local people for the stabling of their horses. The two bed conversion will help support the rural economy and maintenance of the wider countryside. To ensure compliance with CS 5.

 

11

Where the proposed materials for Barn 2 do not match the existing, no development shall take place until details of the external materials to be used in the construction of the external surfaces of the development hereby permitted shall have been submitted to and approved in writing by the local planning authority. Samples shall be made available to inspect on the site. Development shall be carried out in accordance with the approved details.

Reason: To ensure a satisfactory appearance to the development and to preserve the character and appearance of the Conservation Area and to comply with policies CS27 and CS 11 and 12.

 

12

Prior to commencement of development a Business Plan for the equestrian use must be submitted to and approved by the local planning authority.

Reason: To ensure the viability of the equestrian business and to comply with CS5 with particular reference to supporting the rural economy.

 

13

All materials and equipment to be used during the construction shall be stored within the curtilage of the site unless otherwise agreed in writing by the Highways Authority prior to commencement of the development.

Reason: In the interest of highway safety and free and safe flow of traffic.

 

14

The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

 

CIL

Site and Location Plan 16.149.P10.000 Rev C

Proposed Floor & Elevation Plan 16.149.P10.002 Rev C

Existing Floor and Elevation Plan 16.149.P10.001

Revised Planning Statement, 24th January 2017.

Amended Application Form

 

Unilateral Undertaking - tying the two bedroom dwelling and tack room within Barn B and all land not under the ownership of the one bedroom dwelling in Barn B, Barn A and The Coach House to the stables for the equestrian use.

           

Reason: For the avoidance of doubt and in the interests of proper planning.

 

Article 35 Statement:

 

Planning permission has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant during the determination process which led to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraphs 186 and 187) and in accordance with the Town and Country Planning (Development Management Procedure) (England) Order 2015.

 

Informatives:

Welfare of animals

Please refer to the DEFRA Code of practice for the Welfare of Horses, Ponies, Donkeys and Hybrids, NEWC Compendium for the Welfare of Horses, Ponies and Donkeys and the BHS Approval Criteria for Livery Yards. This guidance sets out minimum standards to ensure a level of appropriate well-being at an equestrian use which will ensure the longevity of the business and in turn supports the rural economy in accordance with CS5.

Highways

1. Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website: http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047.

2. Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047.

AN1. The applicant is advised that storage of materials associated with the development should take place within the site and not extend into within the public highway without authorisation from the highway authority, Hertfordshire County Council. If necessary further details can be obtained from the County Council Highways via either the website http://www.hertsdirect.org/services/transtreets/highways/ or telephone 0300 1234047 to arrange this.

AN2.The developer should be aware that the required standards regarding the maintenance of the public right of way and safety during the construction. The public rights of way along the carriageway and footways should remain unobstructed by vehicles, machinery, materials and other aspects of construction works.

Transport maintained and available on site should emergency veterinary treatment be required.

(Reason - the provision of a trailer and towing vehicle and or horse box is a welfare requirement for the transportation to a Veterinary hospital for sick animals requiring urgent lifesaving surgery if diagnosed by a veterinary surgeon or other competent person).

Protected Species

• “Bats and their roosts remain protected at all times under National and European law. If bats or evidence for them is discovered during the course of works, work must stop immediately and advice sought on how to proceed lawfully from Natural England (Tel: 0300 060 3900) or a licensed bat consultant.”

• "Site clearance should be undertaken outside the bird nesting season, typically March to September (inclusive), to protect breeding birds, their nests, eggs and young. If this is not possible then a search of the building/surrounding vegetation should be made by a suitably experienced ecologist and if active nests are found, then works must be delayed until the nesting period has finished."

It is possible that bats may be using areas of the existing building.

UK and European Legislation makes it illegal to:

Deliberately kill, injure or capture bats;

Recklessly disturb bats;

Damage, destroy or obstruct access to bat roosts (whether or not bats are present).

If bats or evidence of them are found to be present a licence will be required before any relevant works can be undertaken and this will involve preparation of a Method Statement to demonstrate how bats can be accommodated within the development.

If bats are discovered during the course of any works, work must stop immediately and Natural England (0300 060 3900), Bat Conservation Trust Helpline (0845 1300 228) or the Hertfordshire & Middlesex Bat Group Helpline (01992 581442) should be consulted for advice on how to proceed.

Thames Water

In respect of surface water it is recommended that the applicant should ensure that storm flows are attenuated or regulated into the receiving public network through on or off site storage. When it is proposed to connect to a combined public sewer, the site drainage should be separate and combined at the final manhole nearest the boundary. Connections are not permitted for the removal of groundwater. Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required. They can be contacted on 0800 009 3921. 

Reason - to ensure that the surface water discharge from the site shall not be detrimental to the existing sewerage system.

 

 