Minutes:
T Rennie introduced the report and said it had been referred to the committee due to the contrary views of Wigginton Parish Council.
Philip Norvill spoke in support of the application.
Stuart Fordyce spoke in objection to the application.
Parish Councillor David Wilde spoke in objection to the application.
In his role as ward councillor, Councillor Mills spoke in objection to the application.
It was proposed by Councillor Guest and seconded by Councillor Imarni to grant the application in the line with the officer’s recommendation.
Vote
For: 9 Against: 3 Abstained: 2
Resolved
That planning permission be GRANTED subject to the following conditions:
1 |
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. |
2 |
No development shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted shall have been submitted to and approved in writing by the local planning authority. Development shall be carried out in accordance with the approved details.
Reason: To safeguard the character and appearance of area and the Chilterns Area of Outstanding Natural Beauty in accordance with adopted Core Strategy Policies CS6, CS12 and CS24. |
3 |
No development shall take place until full details of both hard and soft landscape works shall have been submitted to and approved in writing by the local planning authority. These details shall include:
· hard surfacing materials; · means of enclosure; · soft landscape works which shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate; · trees to be retained and measures for their protection during construction works; · proposed finished levels or contours; · car parking layouts and other vehicle and pedestrian access and circulation areas; · minor artefacts and structures (e.g. furniture, play equipment, refuse or other storage units, signs, lighting etc);
The approved landscape works shall be carried out prior to the first occupation of the development hereby permitted.
Reason: To ensure a satisfactory appearance to the development and to safeguard the visual character of the immediate area in accordance with adopted Core Strategy Policies CS12. |
4 |
The mature Oak tree adjacent to the new vehicular access hereby approved and shown for retention on the approved plan shall be retained and shall not be cut down, uprooted or destroyed, nor topped or lopped without the written approval of the local planning authority.
If this Oak tree subsequently dies, another tree shall be planted at the same place and that tree shall be of such size and species, and shall be planted at such time, as may be specified in writing by the local planning authority.
The erection of fencing for the protection of this Oak tree shall be undertaken in accordance with submitted and approved plans before any equipment, machinery or materials are brought on to the site for the purposes of the development, and shall be maintained until all equipment, machinery and surplus materials have been removed from the site.
Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the local planning authority.
Reason: To ensure a satisfactory appearance to the development and to safeguard the visual character of the immediate area in compliance with adopted Core Strategy CS6 and CS12. |
5 |
The window at first floor level in the south elevation of the dormer of No. 1 Fox Close hereby permitted shall be permanently fitted with obscured glass unless otherwise agreed in writing by the local planning authority.
Reason: In the interests of the residential amenities of the occupants of the adjacent dwellings and to accord with adopted Core Strategy CS12. |
6 |
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any Order amending or re-enacting that Order with or without modification) no windows, dormer windows, doors or other openings other than those expressly authorised by this permission shall be constructed without the prior written approval of the local planning authority.
Reason: In the interests of the residential amenities of the occupants of the adjacent dwellings and to accord with adopted Core Strategy Policy CS12. |
7 |
Prior to the commencement of the development hereby permitted a Phase I Report to assess the actual or potential contamination at the site shall be submitted to and approved in writing by the local planning authority. If actual or potential contamination and/or ground gas risks are identified further investigation shall be carried out and a Phase II report shall be submitted to and approved in writing by the local planning authority prior to the commencement of the development. If the Phase II report establishes that remediation or protection measures are necessary a Remediation Statement shall be submitted to and approved in writing by the Local Planning Authority. For the purposes of this condition:
A Phase I Report consists of a desk study, site walkover, conceptual model and a preliminary risk assessment. The desk study comprises a search of available information and historical maps which can be used to identify the likelihood of contamination. A simple walkover survey of the site is conducted to identify pollution linkages not obvious from desk studies. Using the information gathered, a 'conceptual model' of the site is constructed and a preliminary risk assessment is carried out.
A Phase II Report consists of an intrusive site investigation and risk assessment. The report should make recommendations for further investigation and assessment where required.
A Remediation Statement details actions to be carried out and timescales so that contamination no longer presents a risk to site users, property, the environment or ecological systems.
Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development.
|
8 |
All remediation or protection measures identified in the Remediation Statement referred to in Condition 7 shall be fully implemented within the timescales and by the deadlines as set out in the Remediation Statement and a Site Completion Report shall be submitted to and approved in writing by the local planning authority prior to the first occupation of any part of the development hereby permitted.
For the purposes of this condition a Site Completion Report shall record all the investigation and remedial or protection actions carried out. It shall detail all conclusions and actions taken at each stage of the works including validation work. It shall contain quality assurance and validation results providing evidence that the site has been remediated to a standard suitable for the approved use.
Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development.
Informative: Paragraph 121 of the NPPF states that all site investigation information must be prepared by a competent person. This is defined in the framework as 'A person with a recognised relevant qualification, sufficient experience in dealing with the type(s) of pollution or land instability, and membership of a relevant professional organisation.'
Contaminated Land Planning Guidance can be obtained from Regulatory Services or via the Council's website www.dacorum.gov.uk
|
10 |
Prior to the occupation of the dwelling hereby parking shall be constructed in accordance with details shown on plan 21208/2/05/B. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
Reason: In order to minimise danger, obstruction, and inconvenience to users of the highway and of the premises.
|
11 |
Before the proposed access is brought into use, visibility splays of 2.4m x 43m in both directions from the crossover, within which there shall be no obstruction to visibility between a height of 600 mm and 2m above the carriageway shall be provided and permanently maintained.
Reason: In the interests of highway safety. |
12 |
The development hereby permitted shall be carried out in accordance with the following approved plans/documents:
Site Location Plan; 21607 01/A; 21607 03/A 21208/2 06/A 21208/2 07/B.
Reason: For the avoidance of doubt and in the interests of proper planning.
Article 35 Statement
Planning permission has been granted for this proposal. The Council acted pro-actively through early engagement with the applicant at the pre-application stage which lead to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraphs 186 and 187) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.
HIGHWAYS INFORMATIVES:
1. Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website: http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047. 2. Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047
THAMES WATER INFORMATIVES:
Surface Water Drainage - With regard to surface water drainage it is the responsibility of a developer to make proper provision for drainage to ground, water courses or a suitable sewer. In respect of surface water it is recommended that the applicant should ensure that storm flows are attenuated or regulated into the receiving public network through on or off site storage. When it is proposed to connect to a combined public sewer, the site drainage should be separate and combined at the final manhole nearest the boundary. Connections are not permitted for the removal of groundwater. Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required. They can be contacted on 0800 009 3921. Reason - to ensure that the surface water discharge from the site shall not be detrimental to the existing sewerage system.
There are public sewers crossing or close to your development. In order to protect public sewers and to ensure that Thames Water can gain access to those sewers for future repair and maintenance, approval should be sought from Thames Water where the erection of a building or an extension to a building or underpinning work would be over the line of, or would come within 3 metres of, a public sewer. Thames Water will usually refuse such approval in respect of the construction of new buildings, but approval may be granted for extensions to existing buildings. The applicant is advised to visit thameswater.co.uk/buildover
A Groundwater Risk Management Permit from Thames Water will be required for discharging groundwater into a public sewer. Any discharge made without a permit is deemed illegal and may result in prosecution under the provisions of the Water Industry Act 1991. We would expect the developer to demonstrate what measures he will undertake to minimise groundwater discharges into the public sewer. Permit enquiries should be directed to Thames Water’s Risk Management Team by telephoning 02035779483 or by emailing wwqriskmanagement@thameswater.co.uk. Application forms should be completed on line via www.thameswater.co.uk/wastewaterquality.”
Thames Water will aim to provide customers with a minimum pressure of 10m head (approx 1 bar) and a flow rate of 9 litres/minute at the point where it leaves Thames Waters pipes. The developer should take account of this minimum pressure in the design of the proposed development.
|
Supporting documents: