Agenda item

4/01420/16/FUL - 85 BUCKWOOD ROAD, MARKYATE, ST ALBANS, AL3 8JE

Minutes:

E Palmer introduced the report and said it had been brought to the committee due to the contrary views of Markyate Parish Council.

Andrew Whiteley spoke in support of this application.

Parish Councillor Pilkinton spoke in objection to the application.

Julie Brasier spoke in objection to the application.

It was proposed by Councillor Clark and seconded by Councillor Fisher that the application be granted in line with the officer’s recommendation.

Vote

For: 6               Against: 1                    Abstained: 6

Resolved:

That planning permission be GRANTED subject to the following conditions:

1

The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

2

The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in size, colour and texture those used on the existing building.

 

Reason:  To ensure a satisfactory appearance to the development and to comply with CS 11 and 12.

 

3

Prior to the first occupation of the development hereby permitted, the vehicular access shown on approved plan No. RULE/21607/PLANF shall be provided and thereafter retained. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.

 

Reason: To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway.

 

4

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the local planning authority:

 

Schedule 2 Part 1 Classes A, B, C, D, E, F

 

Reason:  To enable the local planning authority to retain control over the development in the interests of safeguarding the residential and visual amenity of the locality and to comply with CS11,12 and 24.

 

5

No development shall take place until details of the materials proposed to be used on the surfaces of the [roads/footpaths/driveways/courtyards etc, have been submitted to and approved in writing by the local planning authority.  The approved materials shall be used in the implementation of the development.

 

Reason:  To ensure a satisfactory development and to comply with CS 11 and 12.

 

 

6

No development shall take place until full details of both hard and soft landscape works shall have been submitted to and approved in writing by the local planning authority.  These details shall include:

 

·        hard surfacing materials;

·        means of enclosure;

·        soft landscape works which shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate;

·        trees to be retained and measures for their protection during construction works;

·        proposed finished levels or contours;

·        car parking layouts and other vehicle and pedestrian access and circulation areas;

·        minor artefacts and structures (e.g. furniture, play equipmelnt, refuse or other storage units, signs, lighting etc);

·        proposed and existing functional services above and below ground (e.g. drainage, power, communications cables, pipelines etc, indicating lines, manholes, supports etc);

·        retained historic landscape features and proposals for restoration, where relevant.

 

The approved landscape works shall be carried out prior to the first occupation of the development hereby permitted.

               

Reason:  To ensure a satisfactory appearance to the development and to safeguard the visual character of the immediate area and to comply with CS 11,12 and 24.

 

7

The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

 

RULE/21607/PLANF

EIA Assessment Form

CIL Document

Design and Access Statement

Sustainability Statement

 

Reason: For the avoidance of doubt and in the interests of proper planning and to comply with CS 11 and 12.

 

Article 35 Statement:

 

Planning permission has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant during the determination process which led to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraphs 186 and 187) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.  

 

Highways Informatives:

 

Section 278 Agreement:

Any work within the highway boundary (widening and amendment to vehicle access) will need to be secured and approved via an s278 Agreement with HCC.

Advisory Note 1: Construction standards for amended vehicle access: The Highway Authority requires the construction of all works in the highway to be undertaken to their satisfaction and specification, and by a contractor who is authorised to work in the public highway. If any of the works associated with the construction of the access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. statutory authority equipment etc.) the applicant will be required to bear the cost of such removal or alteration. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission and requirements. Further information is available via the website http://www.hertsdirect.org/services/transtreets/highways/ or by telephoning 0300 1234047.

Advisory Note 2: Storage of materials: The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence. Further information is available via the website http://www.hertsdirect.org/services/transtreets/highways/ or by telephoning 0300 1234047.

Thames Water

 

Waste Comments:

Surface Water Drainage - With regard to surface water drainage it is the responsibility of a developer to make proper provision for drainage to ground, water courses or a suitable sewer. In respect of surface water it is recommended that the applicant should ensure that storm flows are attenuated or regulated into the receiving public network through on or off site storage. When it is proposed to connect to a combined public sewer, the site drainage should be separate and combined at the final manhole nearest the boundary. Connections are not permitted for the removal of groundwater. Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required. They can be contacted on 0800 009 3921. Reason - to ensure that the surface water discharge from the site shall not be detrimental to the existing sewerage system.

 

Legal changes under The Water Industry (Scheme for the Adoption of private sewers) Regulations 2011 mean that the sections of pipes you share with your neighbours, or are situated outside of your property boundary which connect to a public sewer are likely to have transferred to Thames Water's ownership.  Should your proposed building work fall within 3 metres of these pipes we recommend you email us a scaled ground floor plan of your property showing the proposed work and the complete sewer layout to developer.services@thameswater.co.uk to determine if a building over / near to agreement is required.

 

Water Comments:

With regard to water supply, this comes within the area covered by the Affinity Water Company. For your information the address to write to is - Affinity Water Company The Hub, Tamblin Way, Hatfield, Herts, AL10 9EZ - Tel - 0845 782 3333.

 

 

Supporting documents: