Minutes:
M Stickley introduced the report on behalf of the relevant case officer. It has been referred to committee due to the contrary views of Bovingdon Parish Council.
Brian Fitzgerald spoke in support of the application.
It was proposed by Councillor C Wyatt-Lowe and seconded by Councillor Birnie to grant the application in line with the officer’s recommendation.
Vote
For: 8 Against: 2 Abstained: 1
Resolved
That planning permission be GRANTED subject to the following conditions:
1 |
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. |
2 |
No development shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted shall have been submitted to and approved in writing by the local planning authority. Development shall be carried out in accordance with the approved details.
Reason: To ensure a satisfactory appearance to the development in accordance with policy CS12 of the adopted Core Strategy.
|
3 |
No development shall take place until full details of both hard and soft landscape works shall have been submitted to and approved in writing by the local planning authority. These details shall include:
· hard surfacing materials; · means of enclosure; · soft landscape works which shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate;
The approved landscape works shall be carried out prior to the first occupation of the development hereby permitted.
Reason: To ensure a satisfactory appearance to the development and to safeguard the visual character of the immediate area in accordance with policy CS12 of the adopted Core Strategy. |
4 |
Prior to the first occupation of the development hereby permitted a pedestrian visibility splay measuring 2m x 2 metres shall be provided to each side of the accesses where it meets the highway and such splays shall thereafter be maintained at all times free from any obstruction between 600mm and 2m above the level of the adjacent highway carriageway.
Reason: In the interests of highway safety in accordance with policy CS8 of the Core Strategy. |
5 |
The development hereby permitted shall be carried out in accordance with the following approved plans/documents:
A_8002 Rev D A_8003 Rev B
Reason: For the avoidance of doubt and in the interests of proper planning.
Informatives
Highways
AN1) Where works are required within the public highway to facilitate the new vehicle access or modify an existing (no works planned at present but the applicant needs to be made aware), the Highway Authority require the construction of such works to be undertaken to their satisfaction and specification, and by a contractor who is authorised to work in the public highway. Before works commence the applicant will need to apply to Hertfordshire County Council Highways team to obtain their permission and requirements. Their address is County Hall, Pegs Lane, Hertford, Herts, SG13 8DN. Their telephone number is 0300 1234047. AN2) Storage of materials: The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence. Further information is available via the website http://www.hertsdirect.org/services/transtreets/highways/ or by telephoning 0300 1234047. AN3) Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website http://www.hertsdirect.org/services/transtreets/highways/ or by telephoning 0300 1234047.
|
Supporting documents: