23/02235/FUL - Demolition of existing stable buildings. Construction of 1 no. residential dwelling and alterations to vehicular access - The Stables, 11 Piccotts End Lane, Hemel Hempstead, Hertfordshire, HP2 6JH

Minutes:

 

5b.

23/02235/FUL

Demolition of existing stable buildings. Construction of 1 no. residential dwelling and alterations to vehicular access.

The Stables, 11 Piccotts End Lane, Hemel Hempstead, Hertfordshire, HP2 6JH

 

The Case Officer, Lois-May Chapman, introduced the report to Members and said that the application had been referred to the Committee due to a Neighbourhood petition.

It was proposed by Councillor Riddick and seconded by Councillor Guest to DELEGATE with a view to APPROVAL.

Vote:

 

For:                  Against:                       Abstained:

6                         3                                    3

 

Resolved: That planning permission be. DELEGATED with a view to APPROVAL.

RECOMMENDATION

That planning permission be DELEGATED with a view to APPROVAL subject to appropriate conditions and an appropriate assessment in accordance with article 6(3) of the Habitats Directive and securing a mitigation package to prevent harm to the Chiltern Beechwood Special Area of Conservation (SAC) through financial contributions secured by legal agreement.

 

Condition(s) and Reason(s):

 

1.    The development hereby permitted shall begin before the expiration of three years from the date of this permission.

           

            Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

2.    The development hereby permitted shall be carried out in accordance with the following approved plans/documents (unless otherwise required by any other condition associated with this Planning permission):

           

            PCTe GA 100/2 F

            PCTe GA 101 F

            PCTe EX 400 D

            PCTe GA 300 C

            PCTe GA 301 C

Arboricultural Impact Assessment and Method Statement - TCTC-18353- AIA Rev B

Bat Report produced by Greengage

Archaeological Report produced by HCUK Group

           

            Reason:  For the avoidance of doubt and in the interests of proper planning.

 

 

3.    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the Local Planning Authority:

 

Schedule 2, Part 1, Class A, B, C, E, F, G of Part 1 and Class B of Part 2

 

Reason:  The proposal has been concluded to have no greater impact on the Green belt than the existing buildings. To enable the Local Planning Authority to retain control over the development in the interests of safeguarding the future openness and visual amenity of the Green Belt, in accordance with Policy CS5, CS12 of the Dacorum Borough Core Strategy (2013) and  the National Planning Policy Framework (December 2023).

 

4.    No development shall take commence until an Archaeological Written Scheme of Investigation has been submitted to and approved by the local planning authority in writing. The scheme shall include an assessment of archaeological significance and research questions; and:

 

a. The programme and methodology of site investigation and recording

b. The programme for post investigation assessment

c. Provision to be made for analysis of the site investigation and recording

d. Provision to be made for publication and dissemination of the analysis and records of the site investigation

e. Provision to be made for archive deposition of the analysis and records of the site investigation

f. Nomination of a competent person or persons/organisation to undertake the works set out within the Archaeological Written Scheme of Investigation.

Reason:  To ensure that reasonable facilities are made available to record archaeological evidence in accordance with saved Policy 118 of the Dacorum Borough Local Plan (2004), Policy CS27 of the Dacorum Borough Core Strategy (2013) and Paragraph 200 of the National Planning Policy Framework (December 2023).

 

5.    i)  Development shall take place in accordance with the Written Scheme of Investigation approved under Condition 4.

ii)  The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the Written Scheme of Investigation approved under condition 3 and the provision made for analysis, publication and dissemination of results and archive deposition has been secured.

Reason:  To ensure that reasonable facilities are made available to record archaeological evidence in accordance with saved Policy 118 of the Dacorum Borough Local Plan (2004), Policy CS27 of the Dacorum Borough Core Strategy (2013) and Paragraph 200 of the National Planning Policy Framework (December 2023).

6.    All structures (including those structures not substantially completed), other than those shown for retention on the approved plans or permitted by this permission, shall be demolished and the materials arising from demolition removed from the site (or the arising materials re-used or retained in a position on site as agreed by the Local Planning Authority in writing and thereafter retained) prior to the implementation of the development hereby permitted.

Reason:  To accord with the approved plans and for the avoidance of doubt.

7.    Prior to first occupation full details of both hard and soft landscape works has been submitted to and approved in writing by the Local Planning Authority.  These details shall include:

           

·         Hedgerow planting and enhancements along western boundary along Piccotts End Road;

·         all external hard surfaces within the site;

·         other surfacing materials;

·         means of enclosure, including gates;

·         all other soft landscape works including a planting scheme with the number, size, species and position of trees, plants and shrubs;

           

The planting must be carried out within one planting season of completing the development.

           

            Any tree or shrub which forms part of the approved landscaping scheme which within a period of 5; years from planting fails to become established, becomes seriously damaged or diseased, dies or for any reason is removed shall be replaced in the next planting season by a tree or shrub of a similar species, size and maturity.

           

Reason:  To improve the appearance of the development, its contribution to biodiversity and the local environment and neutralise impact upon the Green Belt and the Piccotts End Conservation Area, as required by saved Policy 99 of the Dacorum Borough Local Plan (2004) and Policy CS1, CS6, CS12 (e) and CS27 of the Dacorum Borough Council Core Strategy (2013) and the NPPF

 

8.    (a) No development approved by this permission shall be commenced prior to the submission to, and agreement of the Local Planning Authority of a written Preliminary Environmental Risk Assessment Report containing a Conceptual Site Model that indicates sources, pathways and receptors. It should identify the current and past land uses of this site (and adjacent sites) with view to determining the presence of contamination likely to be harmful to human health and the built and natural environment.

          

(b) If the Local Planning Authority is of the opinion that the report which discharges condition (a), above, indicates a reasonable likelihood of harmful contamination then no development approved by this permission shall be commenced until an Intrusive Site Investigation Risk Assessment Report has been submitted to and approved by the Local Planning Authority which includes: 

 

(i)           A full identification of the location and concentration of all pollutants on this site and the presence of relevant receptors, and;        

(ii)          The results from the application of an appropriate risk assessment methodology.  

    

(c) No development approved by this permission (other than that necessary for the discharge of this condition) shall be commenced until a Remediation Method Statement report; if required as a result of (b), above; has been submitted to and approved by the Local Planning Authority.          

    

          

(d) This site shall not be occupied, or brought into use, until:         

 

(i)           All works which form part of the Remediation Method Statement report pursuant to the discharge of condition (c) above have been fully completed and if required a formal agreement is submitted that commits to ongoing monitoring and/or maintenance of the remediation scheme.           

(ii)          A Remediation Verification Report confirming that the site is suitable for use has been submitted to, and agreed by, the Local Planning Authority.    

    

Reason: To ensure that the issue of contamination is adequately addressed to protect human health and the surrounding environment and to ensure a satisfactory development, in accordance with Core Strategy (2013) Policy CS32.     

           

9.    Any contamination, other than that reported by virtue of Condition 8 encountered during the development of this site shall be brought to the attention of the Local Planning Authority as soon as practically possible; a scheme to render this contamination harmless shall be submitted to and agreed by, the Local Planning Authority and subsequently fully implemented prior to the occupation of this site. Works shall be temporarily suspended, unless otherwise agreed in writing during this process because the safe development and secure occupancy of the site lies with the developer.  

Should no ground contamination be encountered or suspected upon the completion of the groundworks, a statement to that effect shall be submitted in writing to the Local Planning Authority prior to the first occupation of the development hereby approved.      

Reason: To ensure that the issue of contamination is adequately addressed to protect human health and the surrounding environment and to ensure a satisfactory development, in accordance with Core Strategy (2013) Policy CS32.     

 

10.The development hereby permitted shall be carried out in accordance with the submitted and approved Sustainable Development Checklist, and notwithstanding any details submitted, no developement (excluding demolition and tree protection works) shall take place until details of the following shall have been submitted to and approved in writing by the local planning authority;

Sustainable drainage measures

Development shall be carried out in accordance with the approved details.

Reason:  To ensure the sustainable development of the site and a satisfactory appearance and setting to the designated heritage assets in accordance with the aims of Policies CS12, CS27, CS28, CS29 and CS31 of the Dacorum Borough Core Strategy (2013), the Sustainable Development Advice Note (2016), Section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990, and the National Planning Policy Framework (2023).

Informatives:

 

1.           Planning permission has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant during the determination process which led to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.

 

2.           The above conditions are considered to be in line with paragraphs 180 (e) & (f) and 189 and 190 of the NPPF 2023.    

 

Guidance on how to assess and manage the risks from land contamination can be found here https://www.gov.uk/government/publications/land-contamination-risk-management-lcrm and here https://www.dacorum.gov.uk/docs/default-source/environment-health/development-on-potentially-contaminated-land.pdf?sfvrsn=c00f109f_8

 

3.           "If European Protected Species (EPS), including bats and great crested newts, or evidence for them, are discovered during the course of works, work must stop immediately, and advice sought on how to proceed lawfully from an appropriately qualified and experienced Ecologist or Natural England to avoid an offence being committed.

                                  

To avoid the killing or injuring of wildlife during development, best practice should keep any areas of grass as short as possible and any longer, ruderal vegetation should be cleared by hand. To avoid creating refugia that may be utilised by wildlife, materials should be carefully stored on-site on raised pallets and away from the boundary habitats. Any trenches on site should be covered at night or have ramps to ensure that any animals that enter can safely escape, and this is particularly important if excavations fill with water. Any open pipework with an outside diameter greater than 120mm must be covered at the end of each working day to prevent animals entering / becoming trapped.  

                                  

In order to protect breeding birds, their nests, eggs and young, demolition or vegetation clearance should only be carried out during the period October to February inclusive. If this is not possible then a pre-development (i.e. no greater than 48 hours before clearance begins) search of the area should be made by a suitably experienced ecologist. If active nests are found, then works must be delayed until the birds have left the nest or professional ecological advice taken on how best to proceed."                       

                                  

4.           Working Hours Informative

Contractors and sub-contractors must have regard to BS 5228-2:2009 "Code of Practice for Noise Control on Construction and Open Sites" and the Control of Pollution Act 1974.

                                  

As a guideline, the following hours for noisy works and/or deliveries should be observed: Monday to Friday, 7.30am to 5:30pm, Saturday, 8am to 1pm, Sunday and bank holidays - no noisy work allowed.    

                                  

Where permission is sought for works to be carried out outside the hours stated, applications in writing must be made with at least seven days' notice to Environmental and Community Protection Team ecp@dacorum.gov.uk or The Forum, Marlowes, Hemel Hempstead, HP1 1DN.  Local residents that may be affected by the work shall also be notified in writing, after approval is received from the LPA or Environmental Health.       

                                  

Works audible at the site boundary outside these hours may result in the service of a Notice restricting the hours as above.  Breach of the notice may result in prosecution and an unlimited fine and/or six months imprisonment.          

5.           Construction Dust Informative      

                                  

Dust from operations on the site should be minimised by spraying with water or by carrying out of other such works that may be necessary to supress dust. Visual monitoring of dust is to be carried out continuously and Best Practical Means (BPM) should be used at all times. The applicant is advised to consider the control of dust and emissions from construction and demolition Best Practice Guidance, produced in partnership by the Greater London Authority and London Councils.

                                  

6.           Waste Management Informative  

Under no circumstances should waste produced from construction work be incinerated on site. This includes but is not limited to pallet stretch wrap, used bulk bags, building materials, product of demolition and so on. Suitable waste management should be in place to reduce, reuse, recover or recycle waste product on site, or dispose of appropriately.                                   

                                  

7.           Air Quality Informative.       

As an authority we are looking for all development to support sustainable travel and air quality improvements as required by the NPPF. We are looking to minimise the cumulative impact on local air quality that ongoing development has, rather than looking at significance. This is also being encouraged by DEFRA.         

                                  

As a result as part of the planning application I would recommend that the applicant be asked to propose what measures they can take as part of this new development, to support sustainable travel and air quality improvements. These measures may be conditioned through the planning consent if the proposals are acceptable.        

                                  

A key theme of the NPPF is that developments should enable future occupiers to make "green" vehicle choices and (paragraph 35) "incorporates facilities for charging plug-in and other ultra-low emission vehicles". Therefore an electric vehicle recharging provision rate of 1 vehicle charging point per 10 spaces (unallocated parking) is expected. To prepare for increased demand in future years, appropriate cable provision should be included in the scheme design and development, in agreement with the local authority.          

                                  

Please note that with regard to EV charging for residential units with dedicated parking, we are not talking about physical charging points in all units but the capacity to install one. The cost of installing appropriate trunking/ducting and a dedicated fuse at the point of build is miniscule, compared to the cost of retrofitting an EV charging unit after the fact, without the relevant base work in place.

                                  

In addition, mitigation in regards to NOx emissions should be addressed in that all gas fired boilers to meet a minimum standard of 40 mg NOx/Kwh or consideration of alternative heat sources.

                                  

8.           Invasive and Injurious Weeds - Informative       

Weeds such as Japanese Knotweed, Giant Hogsweed and Ragwort are having a detrimental impact on our environment and may injure livestock. Land owners must not plant or otherwise cause to grow in the wild any plant listed on schedule 9 of the Wildlife and Countryside Act 1981. Developers and land owners should therefore undertake an invasive weeds survey before development commences and take the steps necessary to avoid weed spread. Further advice can be obtained from the Environment Agency website at https://www.gov.uk/japanese-knotweed-giant-hogweed-and-other-invasive-plants   

 

AN 1) New or amended vehicle crossover access (section 184): Where works are required within the public highway to facilitate a new or amended vehicular access, the Highway Authority require the construction of such works to be undertaken to their satisfaction and specification, and by a contractor who is authorised to work in the public highway. If any of the works associated with the           construction of the access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) the applicant will be required to bear the cost of such removal or alteration.

           

            Before works commence the applicant will need to apply to the Highway Authority to obtain their permission, requirements and for the work to be carried out on the applicant's behalf. Further information is available via the County Council website at:     

            https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/changes-to-your-road/dropped-kerbs/dropped-kerbs.aspx or by telephoning 0300 1234047.

           

            AN 2) Storage of materials: The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence.    

            Further information is available via the County Council website at:

            https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.  

           

            AN 3) Obstruction of highway: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence.           

            Further information is available via the County Council website at:   

            https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-inf 

            ormation/business-licences/business-licences.aspx or by telephoning 0300 1234047.

           

            AN 4) Debris and deposits on the highway: It is an offence under section 148 of the Highways Act     1980 to deposit compost, dung or other material for dressing land, or any rubbish on a made up carriageway, or any or other debris on a highway to the interruption of any highway user. Section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development and use thereafter are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available by telephoning 0300 1234047.

           

            AN 5) The Public Right of Way(s) should remain unobstructed by vehicles, machinery, materials, tools and any other aspects of the construction during works. Safe passage past the site should be maintained at all times for the public using this route. The condition of the route should not deteriorate as a result of these works. Any adverse effects to the surface from traffic, machinery or materials (especially overspills of cement & concrete) should be made good by the applicant to the satisfaction of the Highway Authority. No materials shall be stored or left on the Highway including Highway verges. If the above conditions cannot reasonably be achieved, then a Temporary Traffic Regulation Order (TTRO) would be required to close the affected route and divert users for any periods necessary to allow works to proceed, for which a fee would be payable to Hertfordshire County Council. Further information is available via the County Council website at https://www.hertfordshire.gov.uk/services/recycling-waste-and-environment/countryside-access/rightsof-way/rights-of-way.aspx or by contacting Rights of Way, Hertfordshire County Council on 0300 123 4047. 

 

 

 

 