Agenda item

23/02934/FUL - Demolition of existing garage and rear/side extensions. Addition of new rear/side extension and conversion from one dwelling to two - Greymantle, Hempstead Road, Bovingdon, Hemel Hempstead, Hertfordshire, HP3 0HF

Minutes:

5a.

23/02934/FUL

Demolition of existing garage and rear/side extensions.  Addition of new rear/side extension and conversion from one dwelling to two.

 

Greymantle, Hempstead Road, Bovingdon, Hemel Hempstead, Hertfordshire, HP3 0HF

 

The Case Officer, Elspeth Palmer, introduced the report to Members and said that the application had been referred to the Committee due contrary views of the Parish Council and it was called in by Councillor Riddick.

It was proposed by Councillor Patterson and seconded by Councillor Bristow to DELEGATE with a view to APPROVAL.

Vote:

 

For:                  Against:                       Abstained:

 

8                      2                                              2

 

Resolved: That planning permission be DELEGATED with a view to APPROVAL.

RECOMMENDATION

That planning permission be DELEGATED with a view to APPROVAL subject to an appropriate assessment in accordance with article 6(3) of the Habitats Directive and securing a mitigation package to avoid any further significant effects on the Chilterns Beechwood Special Area of Conservation (SAC) through financial contributions secured by legal agreement.

 

Condition(s) and Reason(s):

 

 1.        The development hereby permitted shall begin before the expiration of three years from the date of this permission.

            Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 2.        The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

            Site Location Plan

            Proposed Elevations PE1

            Proposed Elevations PE2

            Proposed Site Plan PS1 received 17th January, 2024.

            Proposed Floor Plan PF1

            Reason:  For the avoidance of doubt and in the interests of proper planning.

 3.        The materials to be used in the construction of the external surfaces of the development hereby permitted shall match the existing building in terms of size, colour and texture.

            Reason:  To make sure that the appearance of the building is suitable and that it contributes to the character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013).

 4.        Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the Local Planning Authority:

            Schedule 2, Part 1, B

            Reason:  To enable the Local Planning Authority to retain control over the development in the interests of safeguarding the residential amenity of the adjacent neighbours and visual amenity of the locality in accordance with Policy CS12 of the Dacorum Borough Core Strategy (2013) and Paragraph 135 of the National Planning Policy Framework (December 2023).

 Informatives:

 1.        Planning permission has been granted for this proposal. Discussion with the applicant to seek an acceptable solution was not necessary in this instance. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.

 2.        If bats, or evidence for them, are discovered during the course of works, work must stop immediately and advice sought on how to proceed lawfully from an appropriately qualified and experienced Ecologist or Natural England to avoid an offence being committed.

 3.        Thames Water recognises this catchment is subject to high infiltration flows during certain groundwater conditions. The scale of the proposed development doesn't materially affect the sewer network and as such we have no objection, however care needs to be taken when designing new networks to ensure they don't surcharge and cause flooding. In the longer term Thames Water, along with other partners, are working on a strategy to reduce groundwater entering the sewer networks.

            Thames Water recognises this catchment is subject to high infiltration flows during certain groundwater conditions. The developer should liaise with the LLFA to agree an appropriate sustainable surface water strategy following the sequential approach before considering connection to the public sewer network. The scale of the proposed development doesn't materially affect the sewer network and as such we have no objection, however care needs to be taken when designing new networks to ensure they don't surcharge and cause flooding. In the longer term Thames Water, along with other partners, are working on a strategy to reduce groundwater entering the sewer network.

            With regard to SURFACE WATER drainage, Thames Water would advise that if the developer follows the sequential approach to the disposal of surface water we would have no objection. Management of surface water from new developments should follow guidance under sections 167, 168 & 169 in the National Planning Policy Framework.  Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required. Should you require further information please refer to our website. https://www.thameswater.co.uk/help/home-improvements/how-to-connect-to-a-sewer/sewer-connection-design

            Thames Water would advise that with regard to WASTE WATER NETWORK and SEWAGE TREATMENT WORKS infrastructure capacity, we would not have any objection to the above planning application, based on the information provided.

            WATER:

            With regard to water supply, this comes within the area covered by the Affinity Water Company. For your information the address to write to is - Affinity Water Company The Hub, Tamblin Way, Hatfield, Herts, AL10 9EZ - Tel - 0845 782 3333.

 4.        Should any ground contamination be suspected or encountered during the construction of the development hereby approved (including groundworks), works shall be temporarily suspended, unless otherwise agreed in writing by the Local Planning Authority, and a Contamination Remediation Scheme shall be submitted to (as soon as practically possible) and approved in writing by, the Local Planning Authority. The Contamination Remediation Scheme shall detail all measures required to render this contamination harmless and all approved measures shall subsequently be fully implemented prior to the first occupation of the development hereby approved.

            Should no ground contamination be encountered or suspected upon the completion of the groundworks, a statement to that effect, with supporting documentation e.g. photographic record of ground conditions and geotechnical logs (if applicable), shall be submitted in writing to the Local Planning Authority prior to the first occupation of the development hereby approved.

            Materials or conditions that may be encountered at the site and which could indicate the presence of contamination include, but are not limited to:

            Soils that are malodorous, for example a fuel odour or solvent-type odour, discoloured soils, soils containing man-made objects such as paint cans, oil/chemical drums, vehicle or machinery parts etc., or fragments of asbestos or potentially asbestos containing materials. If any other material is encountered that causes doubt, or which is significantly different from the expected ground conditions advice should be sought.

 5.        Contractors and sub-contractors must have regard to BS 5228-2:2009 "Code of Practice for Noise Control on Construction and Open Sites" and the Control of Pollution Act 1974.

            As a guideline, the following hours for noisy works and/or deliveries should be observed: Monday to Friday, 7.30am to 5:30pm, Saturday, 8am to 1pm, Sunday and bank holidays - no noisy work allowed.

            Where permission is sought for works to be carried out outside the hours stated, applications in writing must be made with at least seven days' notice to Environmental and Community Protection Team ecp@dacorum.gov.uk or The Forum, Marlowes, Hemel Hempstead, HP1 1DN.  Local residents that may be affected by the work shall also be notified in writing, after approval is received from the LPA or Environmental Health.

            Works audible at the site boundary outside these hours may result in the service of a Notice restricting the hours as above.  Breach of the notice may result in prosecution and an unlimited fine and/or six months imprisonment.

 

 6.        Dust from operations on the site should be minimised by spraying with water or by carrying out of other such works that may be necessary to supress dust. Visual monitoring of dust is to be carried out continuously and Best Practical Means (BPM) should be used at all times. The applicant is advised to consider the control of dust and emissions from construction and demolition Best Practice Guidance, produced in partnership by the Greater London Authority and London Councils.

 7.        Under no circumstances should waste produced from construction work be incinerated on site. This includes but is not limited to pallet stretch wrap, used bulk bags, building materials, product of demolition and so on. Suitable waste management should be in place to reduce, reuse, recover or recycle waste product on site, or dispose of appropriately.

 8.        As an authority we are looking for all development to support sustainable travel and air quality improvements as required by the NPPF. We are looking to minimise the cumulative impact on local air quality that ongoing development has, rather than looking at significance. This is also being encouraged by DEFRA.

            As a result as part of the planning application I would recommend that the applicant be asked to propose what measures they can take as part of this new development, to support sustainable travel and air quality improvements. These measures may be conditioned through the planning consent if the proposals are acceptable.

            A key theme of the NPPF is that developments should enable future occupiers to make "green" vehicle choices and (paragraph 35) "incorporates facilities for charging plug-in and other ultra-low emission vehicles". Therefore an electric vehicle recharging provision rate of 1 vehicle charging point per 10 spaces (unallocated parking) is expected. To prepare for increased demand in future years, appropriate cable provision should be included in the scheme design and development, in agreement with the local authority.

            Please note that with regard to EV charging for residential units with dedicated parking, we are not talking about physical charging points in all units but the capacity to install one. The cost of installing appropriate trunking/ducting and a dedicated fuse at the point of build is miniscule, compared to the cost of retrofitting an EV charging unit after the fact, without the relevant base work in place.

            In addition, mitigation in regards to NOx emissions should be addressed in that all gas fired boilers to meet a minimum standard of 40 mg NOx/Kwh or consideration of alternative heat sources.

 9.        Weeds such as Japanese Knotweed, Giant Hogsweed and Ragwort are having a detrimental impact on our environment and may injure livestock. Land owners must not plant or otherwise cause to grow in the wild any plant listed on schedule 9 of the Wildlife and Countryside Act 1981. Developers and land owners should therefore undertake an invasive weeds survey before development commences and take the steps necessary to avoid weed spread. Further advice can be obtained from the Environment Agency website at https://www.gov.uk/japanese-knotweed-giant-hogweed-and-other-invasive-plants

10.       AN1) Storage of materials: The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence. Further information is available via the County Council website at:

            https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

11.       AN2) Obstruction of highway: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the

            public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the County Council website at: https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

12.       AN3) Debris and deposits on the highway: It is an offence under section 148 of the Highways Act 1980 to deposit compost, dung or other material for dressing land, or any rubbish on a made up carriageway, or any or other debris on a highway to the interruption of any highway user. Section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development and use thereafter are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available by telephoning 0300 1234047.

 

Additional Condition.

Prior to occupation of the development hereby approved details for the provision of cycle storage shall be submitted to and approved in writing by the Local Planning Authority.  The approved details shall be implemented before the first occupation of the development and retained thereafter.

 

Reason:  To provide for alternative modes of transport, having regard to Policy CS8 of the Dacorum Borough Core Strategy (2013) and Paragraph 110 (d) of the National Planning Policy Framework (December 2023).

 

 

 