23/02861/FUL - Demolition of existing detached dwelling and garage and construction of a pair of semi-detached dwellings - 8 King Street Markyate St Albans Hertfordshire AL3 8JY

Minutes:

5c. 23/02861/FUL

Demolition of existing detached dwelling and garage and construction of a pair of semi-detached dwellings.

8 King Street, Markyate, St Albans, Hertfordshire, AL3 8JY

 

The Case Officer, James Gardner introduced the report to Members and said that the application had been referred to the Committee due to the contrary views of the Parish Council.

Collin Crampton spoke in objection to the application.

 

It was proposed by Councillor Bristow and seconded by Councillor Guest to DELEGATE with a view to APPROVAL.

Vote:

 

For:                  Against:                       Abstained:

7                        2                                      2

 

Resolved: That planning permission be DELEGATED with a view to APPROVAL.

RECOMMENDATION

 

That planning permission be DELEGATED with a view to APPROVAL subject to an appropriate assessment in accordance with article 6(3) of the Habitats Directive and securing a mitigation package to avoid any further significant effects on the Chilterns Beechwood Special Area of Conservation (SAC) through financial contributions secured by legal agreement.

Condition(s) and Reason(s):

 1.        The development hereby permitted shall begin before the expiration of three years from the date of this permission.

            Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 2.        Prior to the commencement of development hereby approved, an Arboricultural Method Statement and Tree Protection Plan prepared in accordance with BS5837:2012 (Trees in relation to design, demolition and construction) setting out how trees shown for retention shall be protected during the construction process, shall be submitted to and approved by the Local Planning Authority.  No equipment, machinery or materials for the development shall be taken onto the site until these details have been approved. The works must then be carried out according to the approved details and thereafter retained until competition of the development.

            Reason: In order to ensure that damage does not occur to trees and hedges during building operations in accordance with saved Policy 99 of the Dacorum Borough Local Plan (2004), Policy CS12 of the Dacorum Borough Core Strategy (2013) and Paragraph 180 of the National Planning Policy Framework (December 2023).

 

 3.        No development shall commence until a Construction Management Plan (or Construction Method Statement) has been submitted to and approved in writing by the Local Planning Authority. Thereafter the construction of the development shall only be carried out in accordance with the approved Plan: The Construction Management Plan / Statement shall include details of:                  

            a. Construction vehicle numbers and type

            b. Access arrangements to the site

            c. Traffic management requirements

            d. Construction and storage compounds (including areas designated for car parking, loading / unloading and turning areas)

            e. Siting and details of wheel washing facilities

            f. Cleaning of site entrances, site tracks and the adjacent public highway

            g. Timing of construction activities (including delivery times and removal of waste) and to avoid school pick up/drop off times

            h. Provision of sufficient on-site parking prior to commencement of construction activities.       

            Reason: In order to protect highway safety and the amenity of other users of the public highway and rights of way in accordance with Policies CS8 and CS12 of the Dacorum Borough Core Strategy (2013).

 4.        No development above slab level shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the Local Planning Authority.  Development shall be carried out in accordance with the approved details.  Please do not send materials to the Council offices.

            Reason:  To ensure satisfactory appearance to the development and to safeguard the visual character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013).

Informative: Materials should be kept on site and arrangements made with the Planning

Officer for inspection.

 

 5.        No development above slab level shall take place until full details of both hard and soft landscape works has been submitted to and approved in writing by the Local Planning Authority.  These details shall include:

           

·         all external hard surfaces within the site

·         other surfacing materials

·         means of enclosure

·         soft landscape works including a planting scheme with the number, size, species and position of trees, plants and shrubs.

 

            The planting must be carried out within one planting season of completing the development.

            Any tree or shrub which forms part of the approved landscaping scheme which within a period of 5 years from planting fails to become established, becomes seriously damaged or diseased, dies or for any reason is removed shall be replaced in the next planting season by a tree or shrub of a similar species, size and maturity.

            Reason: To improve the appearance of the development and its contribution to biodiversity and the local environment, as required by saved Policy 99 of the Dacorum Borough Local Plan (2004) and Policies CS12 (e) and CS26 of the Dacorum Borough Council Core Strategy (2013).

 6.        Should any ground contamination be suspected or encountered during the construction of the development hereby approved (including groundworks), works shall be temporarily suspended, unless otherwise agreed in writing by the Local Planning Authority, and a Contamination Remediation Scheme shall be submitted to (as soon as practically possible) and approved in writing by the Local Planning Authority. The Contamination Remediation Scheme shall detail all measures required to render this contamination harmless and all approved measures shall subsequently be fully implemented prior to the first occupation of the development hereby approved.     

            Should no ground contamination be encountered or suspected upon the completion of the groundworks, a statement to that effect, with supporting documentation e.g. photographic record of ground conditions and geotechnical logs (if applicable), shall be submitted in writing to the Local Planning Authority prior to the first occupation of the development hereby approved.      

            Reason: To ensure that the issue of contamination is adequately addressed to protect human health and the surrounding environment and to ensure a satisfactory development, in accordance with Core Strategy (2013) Policy CS32.

 7.        The first floor windows of the dwellings hereby approved, as shown on side elevation (1) and (2) on drawing no. 07_PL, shall be non-opening below a level of 1.7m above internal floor level and permanently fitted with obscured glass with a minimum privacy level of 3, and retained as such in perpetuity.

            Reason: In the interests of the residential amenities of the occupants of surrounding dwellings in accordance with Policy CS12 (c) of the Dacorum Borough Council Core Strategy (2013) and Paragraph 135 f) of the National Planning Policy Framework (December 2023).

 8.        The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

            06_PL Rev A

            07_PL

            08_PL Rev A

            Preliminary Roost Assessment by Clive Herbert dated 2023 (received on 15 December 2023)

            Reason:  For the avoidance of doubt and in the interests of proper planning.

Informatives:

 1.        Identifying Potentially Contaminated Material: Materials or conditions that may be encountered at the site and which could indicate the presence of contamination include, but are not limited to: Soils that are malodorous, for example a fuel odour or solvent-type odour, discoloured soils, soils containing man-made objects such as paint cans, oil/chemical drums, vehicle or machinery parts etc., or fragments of asbestos or potentially asbestos containing materials. If any other material is encountered that causes doubt, or which is significantly different from the expected ground conditions advice should be sought.         

 2.        Introduction of Soft Landscaped Garden or Amenity Areas: Any soils, whether imported or site-won, to be used in the provision of soft landscaped garden and amenity areas should be known to be chemically suitable (un-contaminated) for the intended end use and meet the requirements of BS3882:2015 and BS8601:2013.

            The above contaminated land condition and informatives are required because the existing buildings are to be demolished and the area of the existing gardens is being slightly altered.

 3.        Storage of materials: The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence. Further information is available via the County Council website at: https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

 4.        Obstruction of highway: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the County Council website at:

 https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

 5.        Debris and deposits on the highway: It is an offence under section 148 of the Highways Act 1980 to deposit compost, dung or other material for dressing land, or any rubbish on a made up carriageway, or any or other debris on a highway to the interruption of any highway user. Section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development and use thereafter are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available by telephoning 0300 1234047.

 6.        Working Hours: Contractors and sub-contractors must have regard to BS 5228-2:2009 "Code of Practice for Noise Control on Construction and Open Sites" and the Control of Pollution Act 1974.                  

            As a guideline, the following hours for noisy works and/or deliveries should be observed: Monday to Friday, 7.30am to 5:30pm, Saturday, 8am to 1pm, Sunday and bank holidays - no noisy work allowed.  

            Where permission is sought for works to be carried out outside the hours stated, applications in writing must be made with at least seven days' notice to Environmental and Community Protection Team ecp@dacorum.gov.uk or The Forum, Marlowes, Hemel Hempstead, HP1 1DN.  Local residents that may be affected by the work shall also be notified in writing, after approval is received from the LPA or Environmental Health.                     

            Works audible at the site boundary outside these hours may result in the service of a Notice restricting the hours as above.  Breach of the notice may result in prosecution and an unlimited fine and/or six months imprisonment.

 7.        Construction Dust: Dust from operations on the site should be minimised by spraying with water or by carrying out of other such works that may be necessary to supress dust. Visual monitoring of dust is to be carried out continuously and Best Practical Means (BPM) should be used at all times. The applicant is advised to consider the control of dust and emissions from construction and demolition Best Practice Guidance, produced in partnership by the Greater London Authority and London Councils.

 8.        Waste Management: Under no circumstances should waste produced from construction work be incinerated on site. This includes but is not limited to pallet stretch wrap, used bulk bags, building materials, product of demolition and so on. Suitable waste management should be in place to reduce, reuse, recover or recycle waste product on site, or dispose of appropriately.

 9.        Air Quality: As an authority we are looking for all development to support sustainable travel and air quality improvements as required by the NPPF. We are looking to minimise the cumulative impact on local air quality that ongoing development has, rather than looking at significance. This is also being encouraged by DEFRA.                    

            As a result as part of the planning application I would recommend that the applicant be asked to propose what measures they can take as part of this new development, to support sustainable travel and air quality improvements. These measures may be conditioned through the planning consent if the proposals are acceptable.                

            A key theme of the NPPF is that developments should enable future occupiers to make "green" vehicle choices and (paragraph 35) "incorporates facilities for charging plug-in and other ultra-low emission vehicles". Therefore an electric vehicle recharging provision rate of 1 vehicle charging point per 10 spaces (unallocated parking) is expected. To prepare for increased demand in future years, appropriate cable provision should be included in the scheme design and development, in agreement with the local authority.             

            Please note that with regard to EV charging for residential units with dedicated parking, we are not talking about physical charging points in all units but the capacity to install one. The cost of installing appropriate trunking/ducting and a dedicated fuse at the point of build is miniscule, compared to the cost of retrofitting an EV charging unit after the fact, without the relevant base work in place.             

            In addition, mitigation in regards to NOx emissions should be addressed in that all gas fired boilers to meet a minimum standard of 40 mg NOx/Kwh or consideration of alternative heat sources.

10.       Invasive and Injurious Weeds: Weeds such as Japanese Knotweed, Giant Hogsweed and Ragwort are having a detrimental impact on our environment and may injure livestock. Land owners must not plant or otherwise cause to grow in the wild any plant listed on schedule 9 of the Wildlife and Countryside Act 1981. Developers and land owners should therefore undertake an invasive weeds survey before development commences and take the steps necessary to avoid weed spread. Further advice can be obtained from the Environment Agency website at:

https://www.gov.uk/japanese-knotweed-giant-hogweed-and-other-invasive-plants.

11.       Planning permission has been granted for this proposal. Discussion with the applicant to seek an acceptable solution was not necessary in this instance. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.

 

 