Agenda item

23/00023/FUL - Demolition of existing outbuildings and construction of a new bungalow - Lower Farm End Luton Road Markyate St Albans Hertfordshire AL3 8PZ

Minutes:

Cllr Barradell declared an interest in item 5b as it is in his Ward, he confirmed that he had no interest in the item and had come to the meeting with an open mind.

 

The Case Officer, Sally Robbins introduced the report to Members and said that the application had been referred to the Committee due to the contrary views of Markyate Parish Council.

 

Ward Councillor Jane Timmis spoke in objection to the application.

 

It was proposed by Councillor Maddern and seconded by Councillor Hobson to DELEGATE with a view to APPROVAL.

 

Vote:

 

For:                  Against:                         Abstained:

 

7                                   0                                   4

 

Resolved: That planning permission be DELEGATED with a view to APPROVAL.

RECOMMENDATION

 

That planning permission be DELEGATED with a view to APPROVAL subject to an appropriate assessment in accordance with article 6(3) of the Habitats Directive and securing a mitigation package to avoid any further significant effects on the Chilterns Beechwood Special Area of Conservation (SAC) through financial contributions secured by legal agreement.

 

Conditions and Reasons:

 

 1.        The development hereby permitted shall begin before the expiration of three years from the date of this permission.

            Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

2.         The buildings / structures labelled as ‘machinery, hay and feed store’, stables’ and ‘container’ on drawing no. WRIG/22110/EXISTSITE shall be demolished and all the materials removed from site prior to the construction of the new dwelling hereby permitted.

            Reason: To safeguard the visual amenities of the Green Belt in accordance with Dacorum Borough Core Strategy (2013) Policy CS5.

 3.        No work (including site clearance) in relation to the development hereby approved shall be undertaken until full details setting out how retained trees shall be protected, in accordance with BS5837:2012 (Trees in relation to design, demolition and construction), have been submitted to and approved in writing by the Local Planning Authority. Details shall include:   

            o A scaled Tree Protection Plan showing the approved development layout and retained trees (surveyed in accordance with BS5837:2012), to include their accurate crown spreads and root protection areas (RPAs)

            o The sequential order of events required for tree protection

            o The position and specification of tree protection fencing in accordance with BS5837:2012 (as applicable)

            o The position and specification of ground protection in accordance with BS5837:2012 (as applicable)

            o Details of hard surfacing constructed using no-dig techniques where proposed over the RPA of retained trees (as applicable)

            o Details of proposed levels

            o The position of service routes and drainage, and means of installation if these encroach through the RPA of retained trees.

            There shall be no excavation, changes in levels, storage of materials or access within the RPA of retained trees unless previously specified and agreed. The works must be carried out according to the approved details.

            Reason: In order to ensure that damage does not occur to trees and hedges during building operations in accordance with saved Policy 99 of the Dacorum Borough Local Plan (2004), Policy CS12 of the Dacorum Borough Core Strategy (2013) and Paragraph 174 of the National Planning Policy Framework (2023).

 4.        a) No development approved by this permission shall be commenced prior to the submission to, and agreement of the Local Planning Authority of a written Preliminary Environmental Risk Assessment Report containing a Conceptual Site Model that indicates sources, pathways and receptors. It should identify the current and past land uses of this site (and adjacent sites) with view to determining the presence of contamination likely to be harmful to human health and the built and natural environment.

            (b) If the Local Planning Authority is of the opinion that the report which discharges condition (a), above, indicates a reasonable likelihood of harmful contamination then no development approved by this permission shall be commenced until an Intrusive Site Investigation Risk Assessment Report has been submitted to and approved by the Local Planning Authority which includes:           

            (i) A full identification of the location and concentration of all pollutants on this site and the presence of relevant receptors, and;       

            (ii) The results from the application of an appropriate risk assessment         

            methodology.  

            (c) No development approved by this permission (other than that necessary for the discharge of this condition) shall be commenced until a Remediation Method Statement report; if required as a result of (b), above; has been submitted to and approved by the Local Planning Authority.     

            (d) This site shall not be occupied, or brought into use, until:           

            (i) All works which form part of the Remediation Method Statement report pursuant to the discharge of condition (c) above have been fully completed and if required a formal agreement is submitted that commits to ongoing monitoring and/or maintenance of the remediation scheme.

           

            (ii) A Remediation Verification Report confirming that the site is suitable for use has been submitted to, and agreed by, the Local Planning Authority.

            Reason: To ensure that the issue of contamination is adequately addressed to protect human health and the surrounding environment and to ensure a satisfactory development, in accordance with Core Strategy (2013) Policy CS32.

 5.        Any contamination, other than that reported by virtue of Condition 4 encountered during the development of this site shall be brought to the attention of the Local Planning Authority as soon as practically possible; a scheme to render this contamination harmless shall be submitted to and agreed by, the Local Planning Authority and subsequently fully implemented prior to the occupation of this site. Works shall be temporarily suspended, unless otherwise agreed in writing during this process because the safe development and secure occupancy of the site lies with the developer.

            Should no ground contamination be encountered or suspected upon the completion of the groundworks, a statement to that effect shall be submitted in writing to the Local Planning Authority prior to the first occupation of the development hereby approved.

            Reason: To ensure that the issue of contamination is adequately addressed to protect human health and the surrounding environment and to ensure a satisfactory development, in accordance with Core Strategy (2013) Policy CS32.

 6.        The development hereby permitted shall not progress beyond damp proof course level until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the Local Planning Authority. Please do not send materials to the Council offices. Materials should be kept on site and arrangements made for inspection.

            Specific details of the following shall be submitted to the Local Planning Authority for approval:

            o          Sample panels of brickwork

            o          Roof material sample

            o          Cladding material sample

            o          Details of window and door frames

            o          Rainwater goods.

                       

            Development shall be carried out in accordance with the approved details.

            Reason: To ensure satisfactory appearance to the development and to safeguard the visual character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013).

 

 7.        Prior to the occupation of the development hereby approved, details of the timber entrance gates shall be submitted to and approved in writing by the Local Planning Authority.

            Development shall be carried out in accordance with the approved details, which shall be installed prior to occupation and retained as such in perpetuity.

            Reason: To ensure a satisfactory appearance to the development, to safeguard the visual character of the area and to preserve the setting of the designated heritage asset in accordance with the Planning (Listed Buildings and Conservation Areas) Act 1990 and Policies CS24 and CS27 of the Dacorum Borough Core Strategy (2013)

 8.        Prior to the occupation of the development hereby approved, full details of both hard and soft landscape works shall be submitted to and approved in writing by the Local Planning Authority.  These details shall include:

            o          all external hard surfaces within the site

            o          other surfacing materials

            o          refuse storage units

            o          soft landscape works including a planting scheme with the number, size, species and position of trees, plants and shrubs.

            The approved landscape works shall be carried out in accordance with the approved details prior to the occupation of the development hereby approved.

            Any tree or shrub which forms part of the approved landscaping scheme which within a period of 5 years from planting fails to become established, becomes seriously damaged or diseased, dies or for any reason is removed shall be replaced in the next planting season by a tree or shrub of a similar species, size and maturity.

            Reason:  To improve the appearance of the development and its contribution to biodiversity and the local environment, as required by saved Policy 99 of the Dacorum Borough Local Plan (2004) and Policies CS12 (e) and CS24 of the Dacorum Borough Council Core Strategy (2013).

 9.        The development shall be carried out in accordance with the ecological enhancement opportunities detailed in the Preliminary Ecological Appraisal by Samsara Ecology (report date December 2022). The scheme of enhancements shall be initiated prior to the commencement of the approved development and thereafter so retained.

            Reason: To identify and ensure the survival and protection of important species and those protected by legislation that could be adversely affected by the development, having regard to Policy CS26 of the Dacorum Borough Core Strategy and Section 15 of the National Planning Policy Framework (2023).

10.        Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the Local Planning Authority:

 

Schedule 2, Part 1, Classes A, AA, B, C and E

Reason: To enable the local planning authority to retain control over the development in the interests of safeguarding the residential and visual amenity of the locality in accordance with Policies CS5 and CS12 of the Dacorum Borough Core Strategy (2013).

 11.       The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

            WRIG/22301/SITE1A

            WRIG/22310/PLANE

            Preliminary Ecological Appraisal by Samsara Ecology (dated December 2022)

            Planning Statement by A P Whiteley Consultants Ltd (dated 3rd January 2023)

            Reason:  For the avoidance of doubt and in the interests of proper planning.

Informatives:

 1.        Storage of materials: The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence.

            Further information is available via the County Council website at:
https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

 2.        Obstruction of highway: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence.

            Further information is available via the County Council website at: https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047

 3.        Debris and deposits on the highway: It is an offence under section 148 of the Highways Act 1980 to deposit compost, dung or other material for dressing land, or any rubbish on a made up carriageway, or any or other debris on a highway to the interruption of any highway user. Section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of theparty responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development and use thereafter are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available by telephoning 0300 1234047.

 

 4.        Working Hours: Contractors and sub-contractors must have regard to BS 5228-2:2009 "Code of Practice for Noise Control on Construction and Open Sites" and the Control of Pollution Act 1974.        

            As a guideline, the following hours for noisy works and/or deliveries should be observed: Monday to Friday, 7.30am to 5:30pm, Saturday, 8am to 1pm, Sunday and bank holidays - no noisy work allowed.  

            Where permission is sought for works to be carried out outside the hours stated, applications in writing must be made with at least seven days' notice to Environmental and Community Protection Team ecp@dacorum.gov.uk or The Forum, Marlowes, Hemel Hempstead, HP1 1DN.  Local residents that may be affected by the work shall also be notified in writing, after approval is received from the LPA or Environmental Health. 

            Works audible at the site boundary outside these hours may result in the service of a Notice restricting the hours as above.  Breach of the notice may result in prosecution and an unlimited fine and/or six months imprisonment.

 5.        Construction Dust: Dust from operations on the site should be minimised by spraying with water or by carrying out of other such works that may be necessary to supress dust. Visual monitoring of dust is to be carried out continuously and Best Practical Means (BPM) should be used at all times. The applicant is advised to consider the control of dust and emissions from construction and demolition Best Practice Guidance, produced in partnership by the Greater London Authority and London Councils.

 6.        Waste Management: Under no circumstances should waste produced from construction work be incinerated on site. This includes but is not limited to pallet stretch wrap, used bulk bags, building materials, product of demolition and so on. Suitable waste management should be in place to reduce, reuse, recover or recycle waste product on site, or dispose of appropriately.

 7.        Air Quality: As an authority we are looking for all development to support sustainable travel and air quality improvements as required by the NPPF. We are looking to minimise the cumulative impact on local air quality that ongoing development has, rather than looking at significance. This is also being encouraged by DEFRA.      

            As a result as part of the planning application I would recommend that the applicant be asked to propose what measures they can take as part of this new development, to support sustainable travel and air quality improvements. These measures may be conditioned through the planning consent if the proposals are acceptable.           

            A key theme of the NPPF is that developments should enable future occupiers to make "green" vehicle choices and (paragraph 35) "incorporates facilities for charging plug-in and other ultra-low emission vehicles". Therefore an electric vehicle recharging provision rate of 1 vehicle charging point per 10 spaces (unallocated parking) is expected. To prepare for increased demand in future years, appropriate cable provision should be included in the scheme design and development, in agreement with the local authority.         

            Please note that with regard to EV charging for residential units with dedicated parking, we are not talking about physical charging points in all units but the capacity to install one. The cost of installing appropriate trunking/ducting and a dedicated fuse at the point of build is miniscule, compared to the cost of retrofitting an EV charging unit after the fact, without the relevant base work in place.      

                       

            In addition, mitigation in regards to NOx emissions should be addressed in that all gas fired boilers to meet a minimum standard of 40 mg NOx/Kwh or consideration of alternative heat sources.

 8.        Invasive and Injurious Weeds: Weeds such as Japanese Knotweed, Giant Hogsweed and Ragwort are having a detrimental impact on our environment and may injure livestock. Land owners must not plant or otherwise cause to grow in the wild any plant listed on schedule 9 of the Wildlife and Countryside Act 1981. Developers and land owners should therefore undertake an invasive weeds survey before development commences and take the steps necessary to avoid weed spread. Further advice can be obtained from the Environment Agency website at

            https://www.gov.uk/japanese-knotweed-giant-hogweed-and-other-invasive-plants.

 9.        The Contaminated Land conditions are considered to be in line with paragraphs 174 (e) & (f) and 183 and 184 of the NPPF 2021.            Guidance on how to assess and manage the risks from land contamination can be found here:

            https://www.gov.uk/government/publications/land-contamination-risk-management-lcrm

10.        Planning permission has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant during the determination process which led to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.

 

 

Supporting documents: