23/00672/FUL Construction of a new dwelling and detached double garage with crossover. 1 Fox Close Wigginton Tring Hertfordshire HP23 6ED

Minutes:

The order of applications was changed to allow for anyone wanting to speak on an application to be heard. The items were heard in the following order,

 

 

5c

5d

5a

5b.

 

 

 

 

5a.

23/00672/FUL Construction of a new dwelling and detached double garage with crossover.

1 Fox Close Wigginton Tring Hertfordshire HP23 6ED

 

The Case Officer, Heather Edey introduced the report to Members and said that the application had been referred to the Committee due to contrary views of the Parish Council.

 

It was proposed by Councillor Guest and seconded by Councillor Wyatt-Lowe to move the Officers recommendation and DELEGATED with a view to APPROVAL.

Vote:

 

For:       12       Against: 0                    Abstained: 1

 

Resolved: That planning permission be DELEGATED with a view to APPROVAL.

That planning permission be DELEGATED with a view to APPROVAL subject to an appropriate assessment in accordance with article 6(3) of the Habitats Directive and securing a mitigation package to avoid any further significant effects on the Chilterns Beechwood Special Area of Conservation (SAC) through financial contributions secured by legal agreement.

 

Condition(s) and Reason(s):

 

 1.        The development hereby permitted shall begin before the expiration of three years from the date of this permission.

            Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 2.        Prior to the first occupation of the development hereby permitted a visibility splay measuring 2.4 x 43metres shall be provided to each side of the access where it meets the highway and such splays shall thereafter be retained at all times free from any obstruction between 600mm and 2m above the level of the adjacent highway carriageway.

            Reason: To ensure that the level of visibility for pedestrians, cyclists and vehicles is satisfactory in the interests of highway safety in accordance with Policy 5 of Hertfordshire's Local Transport Plan (adopted 2018).

 

 3.        Prior to the first occupation of the development hereby permitted the vehicular access shall be completed and thereafter retained as shown on drawing number 3158 /3/3 in accordance with details/specifications to be submitted to and approved in writing by the highway authority. Prior to use appropriate arrangements shall be made for surface water to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.

            Reason: To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway in accordance with Policy 5 of Hertfordshire's Local Transport Plan (Adopted 2018).

 

 4.        The mature Oak tree adjacent to the new vehicular access hereby approved and shown for retention on the approved plan shall be retained and shall not be cut down, uprooted or destroyed, without the written approval of the Local Planning Authority. If this tree subsequently dies, a replacement tree of the same species shall be planted in the same location within the next planting season.

            The development shall be implemented in accordance with the tree protection measures set out in the approved Tree Protection Plan and thereafter retained until completion of the development.

            Reason:  In order to ensure that damage does not occur to trees and hedges during building operations in accordance with saved Policy 99 of the Dacorum Borough Local Plan (2004), Policy CS12 of the Dacorum Borough Core Strategy (2013) and Paragraph 174 of the National Planning Policy Framework (2021).

 

 5.        The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

            3158/3/2

            3158/3/4

            3158/1/4

            3158/3/3A

            3158/3/1

            3158/A4/20

            Tree Protection Plan

            Reason:  For the avoidance of doubt and in the interests of proper planning.

 

Informatives:

 

 1.        Planning permission has been granted for this proposal. Discussion with the applicant to seek an acceptable solution was not necessary in this instance. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.

 2.        HIGHWAY INFORMATIVES

            HCC as Highway Authority recommends inclusion of the following Advisory Note (AN) / highway informative to ensure that any works within the highway are carried out in accordance with the provisions of the Highway Act 1980:

            AN 1) Works within the highway (section 278): The applicant is advised that in order to comply with this permission it will be necessary for the developer of the site to enter into an agreement with Hertfordshire County Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. The construction of such works must be undertaken to the satisfaction and specification of the Highway Authority, and by a contractor who is authorised to work in the public highway. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission and requirements.

            Further information is available via the County Council website at:

            https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/development-management/highways-development-management.aspx or by telephoning 0300 1234047.

            AN 2) Storage of materials: The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence.

            Further information is available via the County Council website at:

            https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

            AN 3) Obstruction of highway: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence.

            Further information is available via the County Council website at:

            https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

            AN 4) Debris and deposits on the highway: It is an offence under section 148 of the Highways Act 1980 to deposit compost, dung or other material for dressing land, or any rubbish on a made up carriageway, or any or other debris on a highway to the interruption of any highway user. Section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development and use thereafter are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available by telephoning 0300 1234047.

 3.        CONTAMINATED LAND

            Contaminated Land Informative 1:

            In the event that contamination is found at any time when carrying out the approved development it must be reported in writing immediately to the Local Planning Authority with all works temporarily suspended until a remediation method statement has been agreed. This is because the safe development and secure occupancy of the site lies with the developer.

            Contaminated Land Informative 2:

            Materials or conditions that may be encountered at the site and which could indicate the presence of contamination include, but are not limited to: Soils that are malodorous, for example a fuel odour or solvent-type odour, discoloured soils, soils containing man-made objects such as paint cans, oil/chemical drums, vehicle or machinery parts etc., or fragments of asbestos or potentially asbestos containing materials. If any other material is encountered that causes doubt, or which is significantly different from the expected ground conditions advice should be sought.

 4.        ENVIRONMENTAL HEALTH INFORMATIVES

            Working Hours Informative

            Contractors and sub-contractors must have regard to BS 5228-2:2009 "Code of Practice for Noise Control on Construction and Open Sites" and the Control of Pollution Act 1974.

            As a guideline, the following hours for noisy works and/or deliveries should be observed: Monday to Friday, 7.30am to 5:30pm, Saturday, 8am to 1pm, Sunday and bank holidays - no noisy work allowed.

            Where permission is sought for works to be carried out outside the hours stated, applications in writing must be made with at least seven days' notice to Environmental and Community Protection Team ecp@dacorum.gov.uk or The Forum, Marlowes, Hemel Hempstead, HP1 1DN.  Local residents that may be affected by the work shall also be notified in writing, after approval is received from the LPA or Environmental Health.

            Works audible at the site boundary outside these hours may result in the service of a Notice restricting the hours as above.  Breach of the notice may result in prosecution and an unlimited fine and/or six months imprisonment.

           

            Construction Dust Informative

            Dust from operations on the site should be minimised by spraying with water or by carrying out of other such works that may be necessary to supress dust. Visual monitoring of dust is to be carried out continuously and Best Practical Means (BPM) should be used at all times. The applicant is advised to consider the control of dust and emissions from construction and demolition Best Practice Guidance, produced in partnership by the Greater London Authority and London Councils.

            Waste Management Informative

            Under no circumstances should waste produced from construction work be incinerated on site. This includes but is not limited to pallet stretch wrap, used bulk bags, building materials, product of demolition and so on. Suitable waste management should be in place to reduce, reuse, recover or recycle waste product on site, or dispose of appropriately.

            Air Quality Informative

            As an authority we are looking for all development to support sustainable travel and air quality improvements as required by the NPPF. We are looking to minimise the cumulative impact on local air quality that ongoing development has, rather than looking at significance. This is also being encouraged by DEFRA.

            As a result as part of the planning application I would recommend that the applicant be asked to propose what measures they can take as part of this new development, to support sustainable travel and air quality improvements. These measures may be conditioned through the planning consent if the proposals are acceptable.

            A key theme of the NPPF is that developments should enable future occupiers to make "green" vehicle choices and (paragraph 35) "incorporates facilities for charging plug-in and other ultra-low emission vehicles". Therefore an electric vehicle recharging provision rate of 1 vehicle charging point per 10 spaces (unallocated parking) is expected. To prepare for increased demand in future years, appropriate cable provision should be included in the scheme design and development, in agreement with the local authority.

            Please note that with regard to EV charging for residential units with dedicated parking, we are not talking about physical charging points in all units but the capacity to install one. The cost of installing appropriate trunking/ducting and a dedicated fuse at the point of build is miniscule, compared to the cost of retrofitting an EV charging unit after the fact, without the relevant base work in place.

            In addition, mitigation in regards to NOx emissions should be addressed in that all gas fired boilers to meet a minimum standard of 40 mg NOx/Kwh or consideration of alternative heat sources.

            Invasive and Injurious Weeds – Informative

            Weeds such as Japanese Knotweed, Giant Hogsweed and Ragwort are having a detrimental impact on our environment and may injure livestock. Land owners must not plant or otherwise cause to grow in the wild any plant listed on schedule 9 of the Wildlife and Countryside Act 1981. Developers and land owners should therefore undertake an invasive weeds survey before development commences and take the steps necessary to avoid weed spread. Further advice can be obtained from the Environment Agency website at https://www.gov.uk/japanese-knotweed-giant-hogweed-and-other-invasive-plants

 

 

 

 

 

 