Agenda item

22/02345/ROC - Variation of Condition 10 (approved plans) attached to planning permission 20/03821/FUL - Demolition of 34 residential garages and construction of 2 no dwelling houses and 6 no apartments - Garage Court, Sleddale, Hemel Hempstead, Hertfordshire

Minutes:

The Case Officer Sally Robins, introduced the report to Members and said that the application had been referred to the Committee Dacorum Borough Council is the applicant.

 

It was proposed by Councillor Maddern and seconded by Councillor Anderson to DELEGATED with a view to APPROVAL in line with officers recommendations.

 

Vote:

 

For:      7          Against: 0                    Abstained: 1

 

Resolved: That planning permission be DELEGATED with a view to APPROVAL.

 

That the application be DELEGATED with a view to APPROVAL subject to appropriate assessment in accordance with article 6(3) of the Habitats Directive and securing a mitigation package to avoid any further significant effects on the Chilterns Beechwood Special Area of Conservation (SAC) through financial contributions secured by legal agreement.

 

Condition(s) and Reason(s):

 

 1.        The development hereby permitted shall begin before the 6th April 2024.           

            Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 2.        No development shall take place until the final design of the drainage scheme is completed and sent to the LPA for approval. The surface water drainage system will be based on the submitted Flood Risk Assessment and Drainage Strategy reference M03001-04_DG04 dated December 2020 prepared by McCloy Consulting. The scheme shall also include:

            1. Limiting the surface water run-off rates to a maximum of 2l/s for all rainfall events up to and including the 1 in 100 year + climate change event with discharge into the Thames surface Water sewer.

            2. Provide attenuation to ensure no increase in surface water run-off volumes for all rainfall events up to and including the 1 in 100 year + climate change event.

            3. Implement drainage strategy to include permeable paving and attenuation tank.

            4. Detailed engineered drawings of the proposed SuDS features including their location, size, volume, depth and any inlet and outlet features including any connecting pipe runs and all corresponding calculations/modelling to ensure the scheme caters for all rainfall events up to and including the 1 in 100 year + 40% allowance for climate change event, with a supporting contributing area plan.

           

            5. Demonstrate appropriate SuDS management and treatment for the entire site including the access road. To include exploration of source control measures and to include above ground features such as permeable paving.

            6. Maintenance and management plan for the SuDS features

            Reason: To prevent flooding by ensuring the satisfactory storage of and disposal of surface water from the site in accordance with Policy CS31 of the Dacorum Borough Core Strategy (2013) and Paragraphs 167 and 169 of the National Planning Policy Framework (2021).

 3.        (a) The development hereby approved shall be carried out in accordance with the Site Investigation (Phase II environmental risk assessment) report approved under application ref. 22/00785/DRC.  

            (b) The development hereby approved shall be carried out in accordance with the Remediation Method Statement report approved under application ref. 22/03054/DRC.

            (c) This site shall not be occupied, or brought into use, until:

            (i) All works which form part of the Remediation Method Statement report pursuant to the discharge of condition (b) above have been fully completed and if required a formal agreement is submitted that commits to ongoing monitoring and/or maintenance of the remediation scheme.

            (ii) A Remediation Verification Report confirming that the site is suitable for use has been submitted to, and agreed by, the Local Planning Authority.

            Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other off-site receptors in accordance with Policy CS32 of the Dacorum Borough Core Strategy (2013) and Paragraphs 183 and 185 of the National Planning Policy Framework (2021).

 4.        All remediation or protection measures identified in the Remediation Statement referred to in Condition 3 above shall be fully implemented within the timescales and by the deadlines as set out in the Remediation Statement and a Site Completion Report shall be submitted to and approved in writing by the Local Planning Authority prior to the first occupation of any part of the development hereby permitted.  

            For the purposes of this condition: a Site Completion Report shall record all the investigation and remedial or protection actions carried out. It shall detail all conclusions and actions taken at each stage of the works including validation work.  It shall contain quality assurance and validation results providing evidence that the site has been remediated to a standard suitable for the approved use.       

            Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other off-site receptors in accordance with Policy CS32 of the Dacorum Borough Core Strategy (2013) and Paragraphs 183 and 185 of the National Planning Policy Framework (2021).

 

 5.        No development (excluding demolition/ground investigations) shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the Local Planning Authority.  Development shall be carried out in accordance with the approved details.  Please do not send materials to the Council offices.  Materials should be kept on site and arrangements made with the Planning Officer for inspection.    

            Reason: To ensure satisfactory appearance to the development and to safeguard the visual character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013)

 6.        No construction of the superstructure shall take place until full details of both hard and soft landscape works has been submitted to and approved in writing by the Local Planning Authority. These details shall include:                   

            o soft landscape works including a planting scheme with the number, size, species and position of trees, plants and shrubs;

            o external lighting; and

            o minor artefacts and structures (e.g. bike stores, signs, storage units, etc.).           

            The planting must be carried out within one planting season of completing the development.     

            Any tree or shrub which forms part of the approved landscaping scheme which within a period of three years from planting fails to become established, becomes seriously damaged or diseased, dies or for any reason is removed shall be replaced in the next planting season by a tree or shrub of a similar species, size and maturity. 

            Reason: To improve the appearance of the development and its contribution to biodiversity and the local environment, as required by saved Policy 99 of the Dacorum Borough Local Plan (2004) and Policy CS12 (e) of the Dacorum Borough Council Core Strategy (2013).

 7.        The development hereby approved shall be carried out in accordance with the Landscape Ecological Management Plan (LEMP) approved under application ref. 22/01815/DRC.

            Reason: To ensure that the development contributes to and enhances the natural environment in accordance with Policy CS26 of the Dacorum Borough Core Strategy (2013) and Paragraph 174 of the National Planning Policy Framework (2021).

 8.        Prior to the first use of the development hereby permitted a visibility splay measuring 2.4 x 43 metres shall be provided to each side of the access where it meets the highway and such splays shall thereafter be retained at all times free from any obstruction between 600mm and 2m above the level of the adjacent highway carriageway.

           

            Reason: To ensure that the level of visibility for pedestrians, cyclists and vehicles is satisfactory in the interests of highway safety in accordance with Policy 5 of Hertfordshire's Local Transport Plan (adopted 2018).

 9.        The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

            1246-MEPK-SL-00-DR-P0405 (Revision P01) - Site location plan

            1246-MEPK-SL-00-DR-A-P0401 (Revision P05) - Proposed site plan

            1246-MEPK-SLH01-ZZ-DR-A-P0402 (Revision P03) - Floor plans and elevations - Houses

            1246-MEPK-SL-ZZ-DR-A-P0403 (Revision P04) - Floor plans and elevations - Flats

            1246-MEPK-SL-ZZ-DR-A-P0404 (Revision P04) - Sitewide sectional elevations

            Design Statement to accompany S73 Application - revised 16-09-2022

            S236-J1-IA-1 - Arboricultural Report by John Cromar's Arboricultural Company Limited (dated 4th September 2020)

            S236-J1-P1 Rev 2 - Tree Value Assessment

            S236-J1-P2 Rev 3 - Tree Retention & Tree Protection Measures

            Reason:  For the avoidance of doubt and in the interests of proper planning.

10.       No construction of the superstructure shall take place until details of the provisions for the storage and recycling of refuse have been submitted to and approved in writing by the Local Planning Authority.  Such provisions shall be made/constructed prior to the first occupation of the building(s) and shall thereafter be made permanently available for the occupants of the building(s) unless further written approval for an alternative scheme is gained from the Local Planning Authority.          

            Reason:  To safeguard the residential and visual amenities of the locality, protect the environment and prevent obstruction to pedestrian movement in accordance with saved Policy 129 of the Dacorum Borough Local Plan (2004) and Policy CS29 of the Dacorum Borough Core Strategy (2013).

11.       The obscure glazed windows at first and second floors on the western (rear) elevation of the apartment block (illustrated as greyed out on drawing 1246-MEPK-SL-ZZ-DR-P0403 - Revision P04) hereby permitted shall be non-opening below 1.7 metres from floor level unless otherwise agreed in writing by the Local Planning Authority.

            Reason: In the interests of the residential amenities of the occupants of the adjacent dwellings in accordance with Policy CS12 (c) of the Dacorum Borough Council Core Strategy (2013) and Paragraph 130 (f) of the National Planning Policy Framework (2021).

Informatives:

 

 1.        Planning permission has been granted for this proposal. The Council acted pro-actively through early engagement with the applicant at the pre-application stage which lead to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.

 2.        Waste Comments

            Thames Water recognises this catchment is subject to high infiltration flows during certain groundwater conditions. The scale of the proposed development doesn't materially affect the sewer network and as such we have no objection. In the longer term Thames Water, along with other partners, are working on a strategy to reduce groundwater entering the sewer network

            Thames Water recognises this catchment is subject to high infiltration flows during certain groundwater conditions. The developer should liaise with the LLFA to agree an appropriate sustainable surface water strategy following the sequential approach before considering connection to the public sewer network. The scale of the proposed development doesn't materially affect the sewer network and as such we have no objection. In the longer term Thames Water, along with other partners, are working on a strategy to reduce groundwater entering the sewer network

            There are public sewers crossing or close to your development. If you're planning significant work near our sewers, it's important that you minimize the risk of damage. We'll need to check that your development doesn't limit repair or maintenance activities, or inhibit the services we provide in any other way. The applicant is advised to read our guide working near or diverting our pipes.

            https://developers.thameswater.co.uk/Developing-a-large-site/Planning-your-development/Working-near-or-diverting-our-pipes.

            With regard to SURFACE WATER drainage, Thames Water would advise that if the developer follows the sequential approach to the disposal of surface water we would have no objection.  Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required.  Should you require further information please refer to our website.

            https://developers.thameswater.co.uk/Developing-a-large-site/Apply-and-pay-for-services/Wastewater-services

            Thames Water would advise that with regard to WASTE WATER NETWORK and SEWAGE TREATMENT WORKS infrastructure capacity, we would not have any objection to the above planning application, based on the information provided.

 3.        In accordance with the Councils adopted criteria, all noisy works associated with site demolition, site preparation and construction works shall be limited to the following hours - 07:30 to 17:30 on Monday to Friday, 08:00 to 13:00 on Saturday and no works are permitted at any time on Sundays or bank holidays.

 4.        Dust from operations on the site should be minimised by spraying with water or carrying out of other such works that may be necessary to suppress dust. Visual monitoring of dust is to be carried out continuously and Best Practical Means (BPM) should be used at all times. The Applicant is advised to consider the control of dust and emissions from construction and demolition Best Practice Guidance, produced in partnership by the Greater London Authority and London Councils.

 5.        The attention of the Applicant is drawn to the Control of Pollution Act 1974 relating to the control of noise on construction and demolition sites.

 6.        All wild birds, nests and eggs are protected under the Wildlife & Countryside Act 1981 (as amended). The grant of planning permission does not override the above Act. All applicants and sub-contractors are reminded that site clearance, vegetation removal, demolition works, etc. between March and August (inclusive) may risk committing an offence under the above Act and may be liable to prosecution if birds are known or suspected to be nesting. The Council will pass complaints received about such work to the appropriate authorities for investigation. The Local Authority advises that such work should be scheduled for the period 1 September - 28 February wherever possible. If this is not practicable, a search of the area should be made no more than 2 days in advance of vegetation clearance by a competent Ecologist and if active nests are found, works should stop until the birds have left the nest.

 7.        If bats, or evidence for them, are discovered during the course of roof works, work must stop immediately and advice sought on how to proceed lawfully from an appropriately qualified and experienced Ecologist or Natural England to avoid an offence being committed.

 8.        Contamination

            The Environmental Health Team has a web-page that aims to provide advice to potential developers, which includes a copy of a Planning Advice Note on "Development on Potentially Contaminated Land and/or for a Sensitive Land Use" in use across Hertfordshire and Bedfordshire. This can be found on www.dacorum.gov.uk by searching for contaminated land.

 9.        Stopping up of highway: Highway rights will need to be extinguished across the area of land affected in accordance with a Stopping Up order to be made by the Secretary of State for the Department of Transport under Section 247 of the Town and Country Planning Act 1990 before development can commence. Further information is available on the Planning Portal at:

https://www.planningportal.co.uk/info/200187/your_responsibilities/40/other_permissions_you_may_require/14 and on the government website:

https://www.gov.uk/government/publications/stopping-up-and-diversion-of-highways

10.       Works within the highway (section 278): The applicant is advised that in order to comply with this permission it will be necessary for the developer of the site to enter into an agreement with Hertfordshire County Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. The construction of such works must be undertaken to the satisfaction and specification of the Highway Authority, and by a contractor who is authorised to work in the public highway. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission and requirements. Further information is available via the County Council website at:

           

            https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/development-management/highways-development-management.aspx or by telephoning 0300 1234047.

11.       Storage of materials: The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence.

            Further information is available via the County Council website at:

            https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

12.       Obstruction of highway: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence.

            Further information is available via the County Council website at:

            https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

13.       Debris and deposits on the highway: It is an offence under section 148 of the Highways Act 1980 to deposit compost, dung or other material for dressing land, or any rubbish on a made up carriageway, or any or other debris on a highway to the interruption of any highway user. Section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development and use thereafter are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available by telephoning 0300 1234047.

14.       As per Agenda Item 14 (Page 3 of 6) of Cabinet dated 16th September 2014 (Update on Garage Disposal Strategy), all of those residents who currently rent a garage in a block earmarked for disposal will be offered an alternative garage. The Garage Management Team will wherever possible, offer a garage to rent in another garage site owned by Dacorum Borough Council in the vicinity of the development site.

 

 

Supporting documents: