Minutes:
Cllr Douris declared a personal interest and came with an open mind
The report was introduced by the case officer Phil Stanley on behalf of Colin Lecart
It was proposed by Councillor Stevens and seconded by Councillor Wyatt- Lowe that the application be Granted
Vote:
For: 6 against: 0 Abstained: 2
Resolved: Granted
Condition(s) and Reason(s):
1. The development hereby permitted shall be carried out in accordance with the following approved plans/documents:
Greenhouse side elevation
Greenhouse plan
Greenhouse dimensions (north/south end)
Barn: exterior drawings
Interior layout: barn
Interior side end elevation drawings
Proposed site plan (Flamstead Plan 1:500)
Proposed planting plan
Proposed hard surface, pipes and cable plan
K-TT376/01/R0
Reason: For the avoidance of doubt and in the interests of proper planning.
2. Within six months of the date of this permission, a Refuse Management Plan , shall be submitted to and approved writing by the Local Planning Authority. The Refuse Management Plan shall include the area in which refuse shall be stored and details of the refuse storage facilities. Thereafter, refuse storage facilities shall only be placed within the approved refuse storage area.
Reason: To protect the openess of the Green Belt in accordance with Policy CS5 of the Core Strategy (2013).
3. Within six months of the date of this permission, a Footpath Protection Plan shall be submitted to and approved by the Local Planning Authority. Following approval, the works shall be carried out in accordance with the plans, and shall thereafter be maintained.
Reason: To ensure that the public footpath network is adequately protected during and after construction in accordance with Saved Policy 79 of the Dacorum Borough Local Plan.
4. No operations shall be carried out at the site outside the hours of 09:00 and 17:00 Monday to Friday.
Reason: To ensure that the operation is consistent with the application details and planning assessment and in the interests of the amenity of adjoining residents in accordance with Policy CS12 of the Core Strategy.
5. A visibility splay shall be provided in full accordance with the details indicated on the approved plan no K-TT376/01/R0. The splay shall thereafter be maintained at all times free from any obstruction between 600mm and 2m above the level of the adjacent highway carriageway.
Reason: In the interests of highway safety in accordance with Saved Policy 51 of the Dacorum Borough Local Plan and Policies CS8 and CS12 of the Core Strategy.
6. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (As Amended) (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the local planning authority:
Schedule 2, Part 2, Class A
Schedule 2, Part 6, Class B
Reason: To enable the local planning authority to retain control over the development in the interests of safeguarding the residential and visual amenity of the locality and the objectives of the Green Belt in accordance with Policies CS12 and CS5 of the Core Strategy and the National Planning Policy Framework.
7. Within six months of the date of this permission, the existing storage containers, shown outlined in red on the Proposed Site Plan (Flamstead Plan 1:500), together with any connecting / roofing materials, shall be removed permanently from the site.
Reason: To ensure a satisfactory appearance to the development and to safeguard the visual character of the immediate area in accordance with Policy CS12 of the Core Strategy.
8. Details of any external lighting shall be submitted to and approved in writing by the Local Planning Authority prior to installation.
Reason: To safeguard the visual character and residential amenity of the immediate area in accordance with Policy CS12 Core Strategy
Informatives:
1. Planning permission has been granted for this proposal. Discussion with the applicant to seek an acceptable solution was not necessary in this instance. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.