Agenda item

21/02260/FUL - Construction of two detached dwellings - Annapurna Hogpits Bottom Flaunden Hemel Hempstead Hertfordshire HP3 0PX

Minutes:

The report was introduced by the case officer Daniel Terry

 

It was proposed by Councillor Wyatt-Lowe and seconded by Councillor Hobson that the application be Granted     

 

Vote:

 

For:  10             against:  0             Abstained: 1

 

Resolved:  Granted

Condition(s) and Reason(s):

 

 1.        The development hereby permitted shall begin before the expiration of three years from the date of this permission.

           

            Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

 2.        The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

 

 

110 REV C

200 REV A

201 REV B

202 REV B

210 REV B

211 REV B

 

 

Reason:  For the avoidance of doubt and in the interests of proper planning

 

 3.        Prior to the commencement of development hereby approved, an Arboricultural Method Statement and Tree Protection Plan prepared in accordance with BS5837:2012 (Trees in relation to design, demolition and construction) setting out how trees shown for retention shall be protected during the construction process, shall be submitted to and approved by the Local Planning Authority.  No equipment, machinery or materials for the development shall be taken onto the site until these details have been approved.  The works must then be carried out according to the approved details and thereafter retained until competition of the development.

           

            Reason:  In order to ensure that damage does not occur to trees and hedges during building operations in accordance with saved Policy 99 of the Dacorum Borough Local Plan (2004), Policy CS12 of the Dacorum Borough Core Strategy (2013) and Paragraph 174 of the National Planning Policy Framework (2021).

 

 4.        Prior to the commencement of the development hereby permitted details of the foul water drainage system shall be submitted to and approved in writing by the Local Planning Authority.  The development shall be carried out in accordance with the approved details prior to occupation and shall be thereafter retained.

           

            Reason:  To ensure that the site is subject to an acceptable drainage system serving the development and to prevent flooding by ensuring the satisfactory storage of and disposal of surface water from the site in accordance with Policy CS31 of the Dacorum Borough Core Strategy (2013) and Paragraph 169 of the National Planning Policy Framework (2021).

 

 5.        No development (excluding demolition/ground investigations) shall take place above slab level until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the Local Planning Authority.  Development shall be carried out in accordance with the approved details.

           

            Reason:  To ensure satisfactory appearance to the development and to safeguard the visual character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013).

 

 6.        No development shall take place above slab level until details of proposed sustainability measures within the development shall be submitted to and agreed in writing by the Local Planning Authority.  The development shall be carried out in accordance with the approved details unless otherwise agreed in writing with the Local Planning Authority.

           

            Reason:  To ensure the sustainable development of the site in accordance with the aims of Policies CS28 and CS29 of the Dacorum Borough Core Strategy (2013), the Sustainable Development Advice Note (2016) and Paragraphs 154 and 157 of the National Planning Policy Framework (2021).

 

 7.        No development shall take place above slab level until full details of both hard and soft landscape works has been submitted to and approved in writing by the Local Planning Authority. These details shall include:

           

·         all external hard surfaces within the site;

·         other surfacing materials;

·         means of enclosure;

·         soft landscape works including a planting scheme with the number, size, species and position of trees, plants and shrubs;

·         minor artefacts and structures (e.g. furniture, play equipment, signs, refuse or other storage units, etc.); and

·         Retained historic landscape features and proposals for restoration, where relevant.

           

            The planting must be carried out within one planting season of completing the development.

           

            Any tree or shrub which forms part of the approved landscaping scheme which within a period of 5 years from planting fails to become established, becomes seriously damaged or diseased, dies or for any reason is removed shall be replaced in the next planting season by a tree or shrub of a similar species, size and maturity.

           

            Reason:  To improve the appearance of the development and its contribution to biodiversity and the local environment, as required by saved Policy 99 of the Dacorum Borough Local Plan (2004) and Policy CS12 (e) of the Dacorum Borough Council Core Strategy (2013).

 

 8.        Prior to occupation of the development hereby approved, full details of the layout and siting of Electric Vehicle Charging Points and any associated infrastructure shall be submitted to and approved in writing by the local planning authority. The development shall not be occupied until these measures have been provided and these measures shall thereafter be retained fully in accordance with the approved details.

           

            Reason: To ensure that adequate provision is made for the charging of electric vehicles in accordance with Policies CS8, CS12 and CS29 of the Dacorum Borough Core Strategy (2013) and the Car Parking Standards Supplementary Planning Document (2020).

 

 9.        The parking spaces shown on the approved Site Plan hereby permitted shall be kept available at all times for the parking of motor vehicles by the occupants of the dwelling[s] and their visitors and for no other purpose.

           

            Reason:  In accordance with Policy CS12 of the Dacorum Borough Core Strategy (2013) and Section 9 of the National Planning Policy Framework (2021).

 

10.       Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the Local Planning Authority:

 

Classes A and E of Part 1, Schedule 2.

 

Reason:  To enable the Local Planning Authority to retain control over the development in the interests of safeguarding the residential and visual amenity of the locality in accordance with Policies CS5, CS11 and CS12 of the Dacorum Borough Core Strategy (2013) and Paragraphs 130, 137 and 138 of the National Planning Policy Framework (2021)

 

Informatives:

 

 1.        Planning permission has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant at the pre-application stage and during the determination process which lead to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.

 

 2.        Construction Hours of Working - (Plant & Machinery) Informative

           

            In accordance with the councils adopted criteria, all noisy works associated with site demolition, site preparation and construction works shall be limited to the following hours: Monday - Friday 07.30am - 17:30pm, Saturdays 08:00am - 13:00pm, Sundays and Bank Holidays - no noisy works allowed.

 

 3.        Construction Dust Informative

           

            Dust from operations on the site should be minimised by spraying with water or by carrying out of other such works that may be necessary to supress dust. Visual monitoring of dust is to be carried out continuously and Best Practical Means (BPM) should be used at all times. The applicant is advised to consider the control of dust and emissions from construction and demolition Best Practice Guidance, produced in partnership by the Greater London Authority and London Councils.

 

 4.        Noise on Construction/Demolition Sites Informative

           

            The attention of the applicant is drawn to the Control of Pollution Act 1974 relating to the control of noise on construction and demolition sites.

 

 5.        Contaminated Land Informative 1:

            In the event that contamination is found at any time when carrying out the approved development it must be reported in writing immediately to the Local Planning Authority with all works temporarily suspended until a remediation method statement has been agreed. This is because the safe development and secure occupancy of the site lies with the developer.

 

 6.        Contaminated Land Informative 2:

            Materials or conditions that may be encountered at the site and which could indicate the presence of contamination include, but are not limited to:

           

            Soils that are malodorous, for example a fuel odour or solvent-type odour, discoloured soils, soils containing man-made objects such as paint cans, oil/chemical drums, vehicle or machinery parts etc., or fragments of asbestos or potentially asbestos containing materials. If any other material is encountered that causes doubt, or which is significantly different from the expected ground conditions advice should be sought.

 

 7.        Thames Water Informative:

            As you are redeveloping a site, there may be public sewers crossing or close to your development. If you discover a sewer, it's important that you minimize the risk of damage. We'll need to check that your development doesn't limit repair or maintenance activities, or inhibit the services we provide in any other way. The applicant is advised to read our guide working near or diverting our pipes. https://developers.thameswater.co.uk/Developing-a-large-site/Planning-your-development/Working-near-or-diverting-our-pipes.

 

 8.        Thames Water informative:

            With regard to SURFACE WATER drainage, Thames Water would advise that if the developer follows the sequential approach to the disposal of surface water we would have no objection.  Management of surface water from new developments should follow Policy SI 13 Sustainable drainage of the London Plan 2021.  Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required.  Should you require further information please refer to our website. https://developers.thameswater.co.uk/Developing-a-large-site/Apply-and-pay-for-services/Wastewater-services

 

 9.        Thames Water informative:

            The applicant is advised that their development boundary falls within a Source Protection Zone for groundwater abstraction. These zones may be at particular risk from polluting activities on or below the land surface. To prevent pollution, the Environment Agency and Thames Water (or other local water undertaker) will use a tiered, risk-based approach to regulate activities that may impact groundwater resources. The applicant is encouraged to read the Environment Agency's approach to groundwater protection (available at https://www.gov.uk/government/publications/groundwater-protection-position-statements) and may wish to discuss the implication for their development with a suitably qualified environmental consultant.

 

10.       Storage of materials: The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

 

11.       Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the freepassage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

 

12.       Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/highways-roads-and-pavements.aspx or by telephoning 0300 1234047

 

 

Supporting documents: