Agenda item

20/02125/RES - Submission of reserved matters on appearance, Landscaping, Layout and scale attached to planning permission 4/00783/17/OUT - Construction of two chalet bungalows with associated access , parking and amenity Space- Land For Development, Love Lane, Kings Langley, Hertfordshire

Minutes:

The report was introduced by the case officer Briony Curtain

It was proposed by Councillor Beauchamp and seconded by Councillor Stevens that the application be Granted

Vote:

For:   6           against:  0                 Abstained: 1

 

Resolved:  Granted

1.         The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

           

            1091-SP-01 Rev B

            1091-EL-01 Rev B

            1091-GA-01 Rev B

           

            Reason:  For the avoidance of doubt and in the interests of proper planning.

 

 

 

Informatives:

 

 

 2.        INFORMATIVES

            1. Storage of materials: The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence.

 

            Further information is available via the website

            https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

           

            2. Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the

            Highway Authority to obtain their permission and requirements before construction works commence.

 

            Further information is available via the website

            https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

           

            3. Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway.

 

Further information is available via the website

            https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/highways-roads-and-pavements.aspx or by telephoning 0300 1234047.

 

            4. The Highway Authority requires the alterations to or the construction of the vehicle crossover to be undertaken such that the works are carried out to their specification and by a contractor who is authorised to work in the public highway. If any of the works associated with the construction of the access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.), the applicant will be required to bear the cost of such removal or alteration. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission and requirements. The applicant may need to apply to Highways (Telephone 0300 1234047) to arrange this, or use link:-

            https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/changes-to-your-road/dropped-kerbs/dropped-kerbs.aspx or by telephoning 0300 1234047.

 

 1.        Planning permission has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant during the determination process which led to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.

 

Supporting documents: