Minutes:
Cllr Douris declared personal interest and took part in meeting
The report was introduced by the case officer Briony Curtain
It was proposed by Councillor Williams and seconded by Councillor Durrant that the application be Granted
Vote:
For: 5 against: 3 Abstained: 2
Resolved: Granted
Condition(s) and Reason(s)
1. The development hereby permitted shall begin before the expiration of three years from the date of this permission.
Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.
2. The development hereby permitted shall be carried out in accordance with the following approved plans/documents:
BURG/22105/BUNGIF rev X
Location plan
Reason: For the avoidance of doubt and in the interests of proper planning.
3. (a) No development approved by this permission shall be commenced prior to the submission to, and agreement of the Local Planning Authority of a written preliminary environmental risk assessment (Phase I) report containing a Conceptual Site Model that indicates sources, pathways and receptors. It should identify the current and past land uses of this site (and adjacent sites) with view to determining the presence of contamination likely to be harmful to human health and the built and natural environment.
(b) If the Local Planning Authority is of the opinion that the report which discharges condition (a), above, indicates a reasonable likelihood of harmful contamination then no development approved by this permission shall be commenced until a Site Investigation (Phase II environmental risk assessment) report has been submitted to and approved by the Local Planning Authority which includes:
(i) A full identification of the location and concentration of all pollutants on this site and the presence of relevant receptors, and;
(ii) The results from the application of an appropriate risk assessment
methodology.
(c) No development approved by this permission (other than that necessary for the discharge of this condition) shall be commenced until a Remediation Method Statement report; if required as a result of (b), above; has been submitted to and approved by the Local Planning Authority.
(d) This site shall not be occupied, or brought into use, until:
(i) All works which form part of the Remediation Method Statement report pursuant to the discharge of condition (c) above have been fully completed and if required a formal agreement is submitted that commits to ongoing monitoring and/or maintenance of the remediation scheme.
(ii) A Remediation Verification Report confirming that the site is suitable for use has been submitted to, and agreed by, the Local Planning Authority.
Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development, in accordance with Core Strategy (2013) Policy CS32.
4. All remediation or protection measures identified in the Remediation Statement referred to in Condition 3; above shall be fully implemented within the timescales and by the deadlines as set out in the Remediation Statement and a Site Completion Report shall be submitted to and approved in writing by the Local Planning Authority prior to the first occupation of any part of the development hereby permitted.
For the purposes of this condition: a Site Completion Report shall record all the investigation and remedial or protection actions carried out. It shall detail all conclusions and actions taken at each stage of the works including validation work. It shall contain quality assurance and validation results providing evidence that the site has been remediated to a standard suitable for the approved use.
Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other off-site receptors in accordance with Policy CS32 of the Dacorum Borough Core Strategy (2013) and Paragraphs 178 and 180 of the National Planning Policy Framework (2019).
5. No demolition/development shall take place/commence until a Written Scheme of Investigation has been submitted to and approved by the local planning authority in writing. The scheme shall include assessment of significance and research questions; and:
1. The programme and methodology of site investigation and recording
2. The programme for post investigation assessment
3. Provision to be made for analysis of the site investigation and recording
4. Provision to be made for publication and dissemination of the analysis and records of the site investigation
5. Provision to be made for archive deposition of the analysis and records of the site investigation
6. Nomination of a competent person or persons/organisation to undertake the works set out within the Written Scheme of Investigation.
Reason: To ensure that reasonable facilities are made available to record archaeological evidence in accordance with saved Policy 118 of the Dacorum Borough Local Plan (2004), Policy CS27 of the Dacorum Borough Core Strategy (2013) and Paragraph 189 of the National Planning Policy Framework (2019).
6. i) demolition/development shall take place fully in accordance with the Written Scheme of Investigation approved under Condition 5.
ii) The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the Written Scheme of Investigation approved under condition (5) and the provision made for analysis, publication and dissemination of results and archive deposition has been secured.
Reason: To ensure that reasonable facilities are made available to record archaeological evidence in accordance with saved Policy 118 of the Dacorum Borough Local Plan (2004), Policy CS27 of the Dacorum Borough Core Strategy (2013) and Paragraph 189 of the National Planning Policy Framework (2019).
7. The development hereby permitted shall be carried out fully in accordance with the submitted Flood Risk Assessment reference RMA - C1995c dated 25th Feb 2021 and prepared by RMA Environmental and the following mitigation measures it details:
o Finished floor levels shall be set no lower than 123.72 metres above Ordnance Datum (AOD).
These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.
Reason: To reduce the risk of flooding to the proposed development and future occupants in accordance with Policy CS31 of the Core Strategy 2013 and Section 14 of the NPPF.
8. The development hereby approved shall be constructed fully in accordance with the submitted Tree Survey and Protection Plan prepared by C.A.T Landscape Consultancy (dated 9.2.21) and Tree Protection Plan NO. TPP 93 HSH 01.
Reason: In order to ensure that damage does not occur to trees and hedges during building operations in accordance with saved Policy 99 of the Dacorum Borough Local Plan (2004), Policy CS12 of the Dacorum Borough Core Strategy (2013) and Paragraph 170 of the National Planning Policy Framework (2019
9. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the Local Planning Authority:
Schedule 2, Part 1, Class A, B, C, and E
Reason: To enable the Local Planning Authority to retain control over the development in the interests of safeguarding the residential and visual amenity of the locality in accordance with Policy CS12 of the Dacorum Borough Core Strategy (2013) and Paragraph 127 of the National Planning Policy Framework (2019).
10. The development hereby approved shall be constructed fully in accordance with the recommendations and mitigation measures set out in the submitted Preliminary Ecological Appraisal by Samsara Ecology (report date January 2021).
Reason: In order to ensure that ecological matters are satisfactorily addressed in accordance with Policy CS26 of the Dacorum Core Strategy (2013).
11. Prior to occupation of the development hereby approved, full details of the layout and siting of Electric Vehicle Charging Points and any associated infrastructure shall be submitted to and approved in writing by the local planning authority. The development shall not be occupied until these measures have been provided and these measures shall thereafter be retained fully in accordance with the approved details.
Reason: To ensure that adequate provision is made for the charging of electric vehicles in accordance with Policies CS8, CS12 and CS29 of the Dacorum Borough Core Strategy (2013) and the Car Parking Standards Supplementary Planning Document (2020).
12. No construction of the superstructure shall take place until full details of both hard and soft landscape works has been submitted to and approved in writing by the Local Planning Authority. These details shall include:
o all external hard surfaces within the site;
o any other surfacing materials;
o means of enclosure;
o soft landscape works including a planting scheme with the number, size, species and position of trees, plants and shrubs;
The planting must be carried out within one planting season of completing the development.
Any tree or shrub which forms part of the approved landscaping scheme which within a period of 5 years from planting fails to become established, becomes seriously damaged or diseased, dies or for any reason is removed shall be replaced in the next planting season by a tree or shrub of a similar species, size and maturity.
Reason: To improve the appearance of the development and its contribution to biodiversity and the local environment, as required by saved Policy 99 of the Dacorum Borough Local Plan (2004) and Policy CS12 (e) of the Dacorum Borough Council Core Strategy (2013).
13. No development shall commence until a Construction Management Plan has been submitted to and approved in writing by the Local Planning Authority. Thereafter the construction of the development shall only be carried out in accordance with the approved
Plan. The Construction Management Plan shall include details of:
a. Construction vehicle numbers, type, routing;
b. Access arrangements to the site;
c. Traffic management requirements
d. Construction and storage compounds (including areas designated for car parking, loading /unloading and turning areas);
e. Siting and details of wheel washing facilities;
f. Cleaning of site entrances, site tracks and the adjacent public highway;
g. Timing of construction activities (including delivery times and removal of waste);
h. Provision of sufficient on-site parking prior to commencement of construction activities;
i. Post construction restoration/reinstatement of the working areas and temporary access to the public highway;
Reason: In order to protect highway safety and the amenity of other users of the public highway and rights of way in accordance with Policies 5, 12, 17 and 22 of Hertfordshire's Local Transport Plan (adopted 2018).
14. No development (excluding demolition/ground investigations) shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Please do not send materials to the Council offices. Materials should be kept on site and arrangements made with the Planning Officer for inspection.
Reason: To ensure satisfactory appearance to the development, to safeguard the visual character of the area and the adjacent listed buildings in accordance with Policies CS11, CS12 and CS27 of the Dacorum Borough Core Strategy (2013).
Informatives:
1. Planning permission has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant at the pre-application stage and during the determination process which lead to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.
2. Mud on highway
AN1) Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/highways-roads-and-pavements.aspx or by telephoning 0300 1234047.
3. If bats, or evidence for them, are discovered during the course of roof works, work must stop immediately and advice sought on how to proceed lawfully from an appropriately qualified and experienced Ecologist or Natural England to avoid an offence being committed.