Agenda item

20/02168/FUL Change of use of amenity land to residential curtilage to allow for vehicular access. Formation of vehicle crossover and block paved parking area.-13 Sawyers Way, Hemel Hempstead, Hertfordshire, HP2 4ED

Minutes:

Item 5c - 20/02168/FUL - Change of use of amenity land to residential curtilage to allow for vehicular access. Formation of vehicle crossover and block paved parking area. 13 Sawyers Way, Hemel Hempstead, Hertfordshire, HP2 4ED

 

 

The report was introduced by Philip Stanley on behalf of the case officer Elspeth Palmer

 

 

It was proposed by Councillor Beauchamp and seconded by Councillor Wyatt-Lowe that the application be refused

 

Vote:

 

For:  9             against: 0                    Abstained: 2   

 

Resolved: GRANTED

 

Condition(s) and Reason(s):

 

 1.        The development hereby permitted shall begin before the expiration of three years from the date of this permission.

           

            Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

 2.        Prior to the first use of the development hereby permitted the vehicular access shall be provided and thereafter retained at the position shown on the approved plans drawing number 01 and Location Plan in accordance with the current highway specification. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.

           

            Reason: To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway in accordance with Policy 5 of Hertfordshire's Local Transport Plan (adopted 2018) and to comply with Core Strategy Policy 12.

 

 3.        Prior to the first use of the development hereby permitted a visibility splay measuring 2.4 x 43m metres shall be provided to each side of the access where it meets the highway and such splays shall thereafter be maintained at all times free from any obstruction between 600mm and 2m above the level of the adjacent highway carriageway.

           

            Reason: To ensure construction of a satisfactory development and in the interests of highway safety in accordance with Policy 5 of Hertfordshire's Local Transport Plan (adopted 2018) and Core Strategy Policy 12.

 

 4.        Prior to the first use of the development hereby permitted 0.65 metre x 0.65 metre pedestrian visibility splays shall be provided and permanently maintained each side of the access. They shall be measured from the point where the edges of the access way cross the footpath boundary, 0.65 metres into the site and 0.65 metres along the footpath boundary therefore forming a triangular visibility splay. Within which, there shall be no obstruction to visibility between 0.6 metres and 2.0 metres above the carriageway.

           

            Reason: To ensure construction of a satisfactory development and in the interests of highway pedestrian safety in accordance with Policies 5 and 7 of Hertfordshire's Local Transport Plan (adopted 2018) and to comply with Core Strategy Policy 12.

 

 5.        The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

           

            Site Location Plan

            Driveway Dimension Plan

           

            Reason:  For the avoidance of doubt and in the interests of proper planning.

 

 

Informatives:

 

 1.        Planning permission has been granted for this proposal. Discussion with the applicant to seek an acceptable solution was not necessary in this instance. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.

 

 2.        It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence.

 

 3.        It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway.

 

 4.        Where works are required within the public highway to facilitate the new or amended vehicular access, the Highway Authority require the construction of such works to be undertaken to their satisfaction and specification, and by a contractor who is authorised to work in the public highway. If any of the works associated with the construction of the access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) the applicant will be required to bear the cost of such removal or alteration. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission, requirements and for the work to be carried out on the applicant's behalf. Further information is available via the website: https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/changes-to-your-road/dropped-kerbs/dropped-kerbs.aspx or by telephoning 0300 1234047.

Supporting documents: