Minutes:
F Williamson introduced the
report to members. Over the last two years, reporting against empty
homes performance figures has been divided into three categories:
general needs, supported housing and adapted properties. This
performance against the targets has not been where it needs to. A
number of reviews have been undertaken both internal and external
and Sopra Steria have been commissioned to carry out a review to
find out what the issues are with existing processes and understand
the demand for certain types of property. The demand for general
needs and supported housing is quite different.
Appendix A shows the performance of key to key times since April
2014. There is a period of improved performance through to 2016/17
where the key to key time was as low as 19 days. In 2016, the
methodology for collecting data and the way major works were
included. Most properties are returned in a reasonable condition so
can be re-let quickly but in some instances, especially in
properties where perhaps an elderly resident has passed away, the
condition can be poor and need extensive work to bring up to the
required standard. Other housing providers would take these out of
their figures and class them as major works so this has an impact
on our figures. Appendix B shows the volumes in the different
categories.
Appendix C details the findings of the Sopra Steria. They started
the review in December 2019 using a workshop with internal and
external stakeholders to map out the voids process which is complex
due to the number of different contractors involved. Various
stakeholders attended workshops to look at the existing process to
understand if there were any opportunities to streamline the
process or run elements of the process concurrently. A number of
key issues were identified and Sopra Steria were due to present
their findings but covid-19 and the lockdown has delayed
this.
The Strategic Housing team have
undertaken some analysis on the level of demand and found that
despite having over 5,000 people considered to have a housing need,
around only 1,200 of those have been active on bidding for
properties in the last 12 months.
Supported housing schemes have proven more difficult to let and a
supplementary piece of work is being undertaken to review the
condition, layout and facilities of category 2 schemes. It is
evident that dispersed schemes are more popular and it is proposed
that a report will be brought to committee in the autumn with the
full findings and any recommendations for intervention.
Councillor England referred to the number of people actively bidding on properties and wondered if this was due to people not understanding the process or not believing they have enough points to be successful.
F Williamson said one of the roles of the Independent Reviewing Officer is to understand why some properties have a higher number of bids than others. Some people wait for the new build properties to come online and some people on the housing register are already in a council property and are wanting to transfer.
Councillor Bassadone asked how many supported housing properties are vacant and if there is any reason why people do not want to move in. She also asked if there had been any cases of covid-19 in the supported housing schemes.
F Williamson said the number of vacant units is currently higher because due to lockdown, any properties that were vacant, we haven’t been working on due to balancing the risk between infection controls and turning the properties around. The current focus has been on ensuring there is sufficient move on accommodation for those who must move due to medical grounds and domestic abuse. There have been restrictions on working practices within properties due to social distancing and as it takes longer to re-let supported housing properties, have suspended activity on these to focus on properties with a greater demand. During lockdown, staff have contacted every tenant over the age of 69 to check they have a support network and address any welfare concerns but were also spoken to about supported housing and if they had an interest in moving. Sadly, there have been deaths from covid-19, however they have not been in the schemes, mainly where residents have contracted it in hospital. A decision was taken early on to close all communal areas and increase cleaning to twice a day and over the weekend.
Councillor Bassadone thanked the housing team for their hard work.
Councillor Imarni echoed those thanks and was impressed with how well the team has stepped up and adapted.
Councillor Adeleke also added his thanks to the team. He noted the increase in key to key days and asked what the target was in other organisations. He also noted that despite the increase in savings threshold for people to be eligible for supported housing there had been no increase in demand.
F Williamson said making direct comparisons with other organisations was difficult as we keep the major works category in the key to key reporting whereas a majority of organisations take it out. Some organisations also work on a private sector approach whereby a tenant will move out one day and the next tenant moved in the day after. This means they only undertake a safe, sanitary and secure check of the property and all works are undertaken in situ which is more expensive and obviously causes disruption to the tenant. Research has been carried out with tenants and they have indicated a preference for moving into a property with all works complete. We are striving to get the targets as low as possible and aiming for an average of 30 days for general needs properties and acknowledging that there is less demand for supported housing, aiming for an average of 43 days. In relation to the demand in supported housing, interventions have already taken place to address it and some properties are not ideal for the age demographic so have been redesignated. 72 supported housing properties were redesignated to general needs and 39 general needs to supported housing.
Councillor Mahmood commented on whether supported housing needed to be rebranded and if there were any additional restrictions on these properties that were stopping people from moving in.
F Williamson said she was conscious of the perception of supported housing and needs to be reinforced that it is independent living and category 2 schemes have the benefit of communal areas for social opportunities. A marketing campaign will be built on the research that has been conducted by the team built on feedback from those currently in general needs properties. There are very few restrictions in supported housing than differ to general needs and they have similar tenancy agreements. One main problem is that most of the properties are one bedroom, there is a two bed scheme in Adeyfield, so restricts the possibility of visitors. Thereare visitor suites in the schemes and have been considering revamping the visitor accommodation to make it more contemporary and family friendly.
Councillor Mahmood referred to the key to key times and noted that there seems to be a decline after April 2018.
F Williamson said she aware that performance declined around April 2018 and it has been looked at in detail. There was a staffing resource issue in the lettings team where they were at 50% capacity but full capacity was reached later that year but performance didn’t increase. Further work is ongoing in terms of what else could be done to reduce to key to key times. One thing that was noted by Sopra Steria was that there needs to be more responsibility and taking ownership with a one team approach.
Councillor Pringle also echoed her thanks to the team. She asked if it was necessary to have an external contractor look into how the team could improve target times and whether this could have been identified by management. She also asked if supported housing could be extend for those with hidden disabilities and are younger than the current threshold or those suffering from domestic abuse or trauma and might benefit from a community atmosphere. She also asked how many homeless people were housed at the start of lockdown.
F Williamson said the external contractor was appointed due to the complexity of the process and part of their remit was to look at the IT.
L Roberts said it is difficult to critique yourself and should not underestimate the impact of a third party, as they have the skill in being able to go through a business process review. Sopra Steria were able to hold a workshop to engage staff and allow everyone to contribute which also buys people into the process. On the technology side, they know the art of the possible and can use other approaches to enhance what we currently have in place.
F Williamson said if the supported housing property is not let
after two advertising cycles, it is opened up to those over 50 with
a medical need. In the past, we have found that mixing age groups
and different needs has created problems when trying to manage
schemes. There is a piece of work ongoing to understand the needs
of residents and what level of support they require, whether a
weekly visit is too much for some people or if others would benefit
from a more frequent visit. She added that six street homeless
people had been housed, two of which have no recourse to public
funds.
Councillor Adeleke asked if it was possible to send out invitations to those on the register to bid on properties if they haven’t been active in the past.
F Williamson said the council operates a choice based lettings scheme and the process is explained to applicants when they first apply. It would be an onerous task to write to all applicants and some people can be successful in gaining a property within local villages if they meet the local connection criteria. The team does proactively engage with other council’s and attend benchmarking clubs and the Herts Head of Housing meeting to exchange best practice on empty homes.
Councillor England referred to Appendix A and said it would be sensible to produce data in such a way so all data is recorded in working days to understand the trends. He hoped that if the cause was found for poor performance, it could be rectified and return to consistent performance.
F Williamson said she would get the data produced and circulate to members. The team endeavour to maintain a high level of performance and Sopra Steria had identified some key events that happened at various stages in personnel and the void process management.
Action: F Williamson
L Roberts emphasised that the key to success what to run as many processes as possible in parallel instead of in a linear process.
Councillor Imarni said that some residents have mentioned to her that they do not understand how to bid on houses.
F Williamson said the team do look into why people are not bidding on properties and what additional support we can provide to them. Strategic Housing have appointed new Housing Needs advisors who are able to contact residents struggling to bid and provide support. Some of the older demographic find it particularly challenging to bid so half of one post is dedicated to providing support to these people. At the moment, due to covid-19 we are unsure on the impact this post has had.
L Roberts said they are considering how to make processes more mobile. More people now use their smartphones regularly instead of using laptops and need to make use of that to help.
Councillor Griffiths said a lot of work has gone into this project. She highlighted that those eligible for supported housing are often very specific about what area they would like to move it and will not bid until that area comes up. In addition to L Robert’s comments, she noted that many people do not have a telephone in their homes and just rely on their mobile phones.