Minutes:
The Case Officer, Elspeth Palmer, introduced the report to Members and said that the application had been referred to the Committee due to the contrary view of the Flaunden Parish Council.
It was proposed by Councillor Maddern and seconded by Councillor Tindall to GRANT the application in line with the officer recommendation.
Vote:
For: 10 Against: 1 Abstained: 1
Resolved: That planning permission be GRANTED subject to the following conditions:
Conditions and Reasons:
1. The development hereby permitted shall begin before the expiration of three years from the date of this permission.
Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.
2. No development (excluding demolition/ground investigations) shall take place until details of the materials to be used in the construction of the external surfaces between the windows of the development hereby permitted have been submitted and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Please do not send materials to the Council offices. Materials should be kept on site and arrangements made with the Planning Officer for inspection.
Reason: To ensure satisfactory appearance to the development and to safeguard the visual character of the area in accordance with Policies CS12 and CS27 of the Dacorum Borough Core Strategy (2013).
3. The development hereby permitted shall be constructed in accordance with the materials specified on the application form with the exception of those which describe boundary treatment and the materials between the windows - these are to be addressed via other conditions which require details of boundary treatment and materials.
Reason: To make sure that the appearance of the building is suitable and that it contributes to the character of the area in accordance with Policies CS12 and CS27 of the Dacorum Borough Core Strategy (2013).
4. Prior to the commencement of development hereby approved, a Tree Protection Plan must be prepared in accordance with BS5837:2012 (Trees in relation to design, demolition and construction) setting out how the trees along the western side of Barn A shall be protected during the construction of the approved development and the footpath along the western side of the Barn and how the type of footpath will ensure protection of the trees and their root system in the future, shall be submitted to and approved by the Local Planning Authority. No equipment, machinery or materials for the development shall be taken onto the site until these details have been approved. The works must then be carried out according to the approved details and thereafter retained until competition of the development.
Reason: In order to ensure that damage does not occur to trees and hedges during building operations in accordance with saved Policy 99 of the Dacorum Borough Local Plan (2004), Policy CS12 of the Dacorum Borough Core Strategy (2013) and Paragraph 170 of the National Planning Policy Framework (2019).
5. As shown on the approved plans the full size windows at ground floor on the eastern elevation must be non - opening.
Reason: To avoid any encroachment into the Green Belt by the construction of a footpath along this side boundary and therefore to comply with the NPPF and CS 5 Green Belt.
6. All remediation or protection measures identified in the Remediation Statement referred to in Condition (4) of planning application 4/01658/16/FUL shall be fully implemented within the timescales and by the deadlines as set out in the Remediation Statement and a Site Completion Report shall be submitted to and approved in writing by the local planning authority prior to the first occupation of any part of the development hereby permitted.
For the purposes of this condition a Site Completion Report shall record all the investigation and remedial or protection actions carried out. It shall detail all conclusions and actions taken at each stage of the works including validation work. It shall contain quality assurance and validation results providing evidence that the site has been remediated to a standard suitable for the approved use.
Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development.
7. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the Local Planning Authority:
Schedule 2 Part 1 Classes [A, B, C, D, E, F and G]
Part 2 Classes [A, B and C].
Reason: To enable the Local Planning Authority to retain control over the development in the interests of safeguarding the residential and visual amenity of the locality in accordance with Policy CS12 of the Dacorum Borough Core Strategy (2013) and Paragraph 127 of the National Planning Policy Framework (2019).
Reason: In the interests of safeguarding the openness of the Green Belt; the rural character of the building and the site; and the visual amenity of the surrounding countryside. The proposed development comprises of the conversion of an agricultural building in a rural area and it is important for the local planning authority to retain control over certain future development which would normally represent permitted development, in order to safeguard the rural character of the surrounding countryside.
8. No construction of the superstructure shall take place until full details of both hard and soft landscape works has been submitted to and approved in writing by the Local Planning Authority. These details shall include:
o hard surfacing materials;
o means of enclosure: no fencing will be permitted along the western side of the Barn.
o soft landscape works which shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate;
The approved landscape works shall be carried out prior to the first occupation of the development hereby permitted.
The planting must be carried out within one planting season of completing the development.
Any tree or shrub which forms part of the approved landscaping scheme which within a period of 5 years from planting fails to become established, becomes seriously damaged or diseased, dies or for any reason is removed shall be replaced in the next planting season by a tree or shrub of a species, size and maturity.
Reason: To improve the appearance of the development and its contribution to biodiversity and the local environment, as required by saved Policy 99 of the Dacorum Borough Local Plan (2004) and Policy CS12 (e) of the Dacorum Borough Council Core Strategy (2013).
9. Notwithstanding the details shown on the approved plans, prior to construction/installation of the garage doors details shall be provided showing the design and materials of the garage doors to blend in with the rural character of the barn conversion. The approved works shall be carried out prior to the first occupation of the development hereby permitted.
Reason: In the interests of protection of the rural character of the countryside and the Flaunden Conservation Area. To comply with CS5 and CS27.
10. The development hereby permitted shall be carried out in accordance with the following approved plans/documents:
A. 47499. 04H Proposed Plans and Elevations
Supplementary Planning Statement
Proposed Site Plan
Reason: For the avoidance of doubt and in the interests of proper planning.
Informatives:
1. Planning permission has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant during the determination process which led to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.
2. It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047.
3. The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-and-developer-information.aspx.
4. It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website: http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047.
5. Paragraph 121 of the NPPF states that all site investigation information must be prepared by a competent person. This is defined in the framework as 'A person with a recognised relevant qualification, sufficient experience in dealing with the type(s) of pollution or land instability, and membership of a relevant professional organisation.'
Contaminated Land Planning Guidance can be obtained from Regulatory Services or via the Council's website www.dacorum.gov.uk
6. Bats and their roosts remain protected at all times under National and European law. If bats or evidence for them is discovered during the course of works, work must stop immediately and advice sought on how to proceed lawfully from Natural England (Tel: 0300 060 3900) or a licensed bat consultant.
7. Site clearance should be undertaken outside the bird nesting season, typically March to September (inclusive), to protect breeding birds, their nests, eggs and young. If this is not possible then a search of the building/surrounding vegetation should be made by a suitably experienced ecologist and if active nests are found, then works must be delayed until the nesting period has finished."