Agenda item

4/01866/18/FUL - DEMOLITION OF EXISTING BUILDINGS AND CONSTRUCTION OF FIVE 4 BEDROOM DETACHED DWELLINGS WITH ASSOCIATED LANDSCAPING AND ACCESS - 57 SOUTH PARK GARDENS, BERKHAMSTED, HP4 1HZ

Minutes:

The Case Officer, Jason Seed, introduced the report to Members and said that the application had been referred to the Committee due to objection from Berkhamsted Town Council on the grounds of overdevelopment, impact on the character of the surrounding area, inadequate access, impact on surrounding amenity and impacts of noise on occupiers of the new dwellings.

 

Martin Allen spoke in objection to the application.

 

Krzys Lipinski and Richard Harris spoke in support of the application.

 

It was proposed by Councillor G Sutton and seconded by Councillor Wyatt-Lowe to GRANT the application in line with the officer recommendation.

 

Vote:

 

For: 7                          Against: 3                    Abstained: 2       

 

Resolved: That planning permission be GRANTED subject to the following conditions:

 

Conditions

No

Condition

1

The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

2

The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

 

P/001 Site Survey

P/01 rev H Proposed Site Layout

P/02 rev F Plot 1 house type

P/03 rev G Plots 3 & 5 house types

P/04 rev F Site Perspectives

P/05 rev F Site Perspectives

P/06 Garages

P/07 rev G Plots 2 & 4 house types

Environmental Survey 183121/JDT

Noise Survey DLW/7167

Noise Letter for Committee DLW/KH/7167/L2

Site plan extract with additional site dimensions

 

Reason: For the avoidance of doubt and in the interests of proper planning.

 

3

No construction of the superstructures hereby approved shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the local planning authority.  Development shall be carried out in accordance with the approved details.  Please do not send materials to the council offices.  Materials should be kept on site and arrangements made with the planning officer for inspection.

 

Reason:  To ensure a satisfactory appearance to the development in accordance with Policy CS12 of the Core Strategy.

 

4

Prior to first use, the new parking areas hereby approved shall be surfaced in porous paving or material or similar durable bound material and arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge in to highway.

 

Reason: To avoid the carriage of extraneous material surface water from the site into the highway so as to safeguard the interest of highway safety in accordance with Policy CS8 of the Core Strategy.

 

5

No development (excluding demolition and groundworks) shall take place until a Phase I Report to assess the actual or potential contamination at the site has been submitted to and approved in writing by the local planning authority. If actual or potential contamination and/or ground gas risks are identified, further investigation shall be carried out and a Phase II report shall be submitted to and approved in writing by the local planning authority prior to the commencement of the development. If the Phase II report establishes that remediation or protection measures are necessary, a Remediation Statement shall be submitted to and approved in writing by the Local Planning Authority.

 

For the purposes of this condition:

 

A Phase I Report consists of a desk study, site walkover, conceptual model and a preliminary risk assessment. The desk study comprises a search of available information and historical maps which can be used to identify the likelihood of contamination. A simple walkover survey of the site is conducted to identify pollution linkages not obvious from desk studies. Using the information gathered, a 'conceptual model' of the site is constructed and a preliminary risk assessment is carried out.

A Phase II Report consists of an intrusive site investigation and risk assessment. The report should make recommendations for further investigation and assessment where required.

A Remediation Statement details actions to be carried out and timescales so that contamination no longer presents a risk to site users, property, the environment or ecological systems.

 

Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development in accordance with Policy CS32 of the Core Strategy.

 

6

All remediation or protection measures identified in the Remediation Statement referred to in Condition 5 above shall be fully implemented within the timescales and by the deadlines as set out in the Remediation Statement and a Site Completion Report shall be submitted to and approved in writing by the local planning authority prior to the first occupation of any part of the development hereby permitted.

For the purposes of this condition: a Site Completion Report shall record all the investigation and remedial or protection actions carried out. It shall detail all conclusions and actions taken at each stage of the works including validation work. It shall contain quality assurance and validation results providing evidence that the site has been remediated to a standard suitable for the approved use.

 

Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development, in accordance with Policy CS32 of the Core Strategy.

 

7

No development (excluding demolition and groundworks) shall take place until full details of both hard and soft landscape works shall have been submitted to and approved in writing by the local planning authority.  These details shall include:

 

hard surfacing materials;

means of enclosure;

soft landscape works which shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate;

trees to be retained and measures for their protection during construction works;

proposed finished levels or contours;

car parking layouts and other vehicle and pedestrian access and circulation areas;

minor artefacts and structures (e.g. furniture, play equipment, refuse or other storage units, signs, lighting etc);

proposed and existing functional services above and below ground (e.g. drainage, power, communications cables, pipelines etc, indicating lines, manholes, supports etc);

retained historic landscape features and proposals for restoration, where relevant.

 

The approved landscape works shall be carried out prior to the first occupation of the development hereby permitted.

                       

Reason:  To ensure a satisfactory appearance to the development and to safeguard the visual character of the immediate area in accordance with Policy CS12 of the Core Strategy.

 

8

Details of the acoustic fence will be submitted to and approved by the local planning authority prior to first occupation of the any dwelling hereby approved. The approved fence will be fully erected prior to first occupation of any dwelling hereby approved and will be retained and maintained for the lifetime of the development.

 

Reason: To ensure that the amenity of future occupiers is protected in accordance with Paragraph 170 of the National Planning Policy Framework.

 

9

The windows at first floor level in the easternmost elevation of Plot 1 hereby permitted and the flank elevations of Plots 2, 3, 4 and 5 shall be non-opening below 1.7m from floor level and shall be permanently fitted with obscured glass for the lifetime of the development.

 

Reason:  In the interests of the amenity of adjoining residents in accordance with Policy CS12 of the Core Strategy.

 

10

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (As Amended) (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out on the property identified as Plot 1 without the prior written approval of the local planning authority:

 

Schedule 2, Part 1, Class B

 

Reason:  To enable the local planning authority to retain control over the development in the interests of safeguarding the residential amenity in accordance with Policy CS12 of the Core Strategy.

 

11

Prior to first occupation of the development hereby approved, confirmation that the proposed noise mitigation measures have achieved noise levels of 55 dB LAeq,16H or less within the screened amenity areas and 66 dB LAeq,16H or less within the remaining amenity areas will be submitted to and approved in writing by the Local Planning Authority.

 

ARTICLE 35 STATEMENT

 

Planning permission has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant during the determination process which led to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015. 

 

INFORMATIVES

 

Highway Authority

 

Construction standards for new/amended vehicle access: Where works are required within the public highway to facilitate the new or amended vehicular access, the Highway Authority require the construction of such works to be undertaken to their satisfaction and specification, and by a contractor who is authorised to work in the public highway. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission, requirements and for the work to be carried out on the applicant's behalf. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/changes-to-your-road/dropped-kerbs/dropped-kerbs.aspx or by telephoning 0300 1234047.

Storage of materials

 

Storage of materials: The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspxor by telephoning 0300 1234047.

Obstruction of the highway

 

Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

Mud on highway

 

Road Deposits: It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/highways-roads-and-pavements.aspx or by telephoning 0300 1234047.

 

Land Contamination

 

Paragraph 121 of the NPPF states that all site investigation information must be prepared by a competent person. This is defined in the framework as 'A person with a recognised relevant qualification, sufficient experience in dealing with the type(s) of pollution or land instability, and membership of a relevant professional organisation.' Contaminated Land Planning Guidance can be obtained from Regulatory Services or via the Council's website www.dacorum.gov.uk

 

Thames Water

 

With regard to surface water drainage, Thames Water would advise that if the developer follows the sequential approach to the disposal of surface water we would have no objection. Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required. Should you require further information please refer to our website.  https://developers.thameswater.co.uk/Developing-a-large-site/Apply-and-pay-for-services/Wastewater-services

 

There are public sewers crossing or close to your development. If you're planning significant work near our sewers, it's important that you minimize the risk of damage. We'll need to check that your development doesn't reduce capacity, limit repair or maintenance activities, or inhibit the services we provide in any other way. The applicant is advised to read our guide working near or diverting our pipes. https://developers.thameswater.co.uk/Developing-a-large-site/Planning-your-development/Working-near-or-diverting-our-pipes. 

 

Affinity Water

 

You should be aware that the proposed development site is located within an Environment Agency defined groundwater Source Protection Zone (GPZ) corresponding to Berkhamsted Pumping Station. This is a public water supply, comprising a number of Chalk abstraction boreholes, operated by Affinity Water Ltd.

 

The construction works and operation of the proposed development site should be done in accordance with the relevant British Standards and Best Management Practices, thereby significantly reducing the groundwater pollution risk. It should be noted that the construction works may exacerbate any existing pollution. If any pollution is found at the site then the appropriate monitoring and remediation methods will need to be undertaken.

 

For further information we refer you to CIRIA Publication C532 "Control of water pollution from construction - guidance for consultants and contractors".

 

Construction Times

 

The applicant is advised that the Council's Environmental Health Team only permit construction activities during the following times:

 

Monday to Saturday - 7:30am to 6:30pm

Sundays and Bank Holidays - no noisy activities allowed.

 

 