Minutes:
The Case Officer, Sally Robbins, introduced the report to Members and said that the application had been referred to the Committee as a Ward Councillor had called it in and it was contrary to the view of the Parish Council.
Parish Councillor Bryant spoke in objection to the application.
Robert Harman spoke in support of the application.
RECOMMENDATION
That planning permission be GRANTED subject to the suggested conditions.
It was proposed by Councillor Beauchamp and seconded by Councillor Maddern to grant the application.
Vote:
For: 8 Against: 2 Abstained: 2
Resolved: That planning permission be GRANTED subject to the following conditions:
1. The development hereby permitted shall begin before the expiration of three years from the date of this permission.
Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.
2. (a) No development approved by this permission shall be commenced prior to the submission to, and agreement of the Local Planning Authority of a written preliminary environmental risk assessment (Phase I) report containing a Conceptual Site Model that indicates sources, pathways and receptors. It should identify the current and past land uses of this site (and adjacent sites) with view to determining the presence of contamination likely to be harmful to human health and the built and natural environment.
(b) If the Local Planning Authority is of the opinion that the report which discharges condition (a), above, indicates a reasonable likelihood of harmful contamination then no development approved by this permission shall be commenced until a Site Investigation (Phase II environmental risk assessment) report has been submitted to and approved by the Local Planning Authority which includes:
(i) A full identification of the location and concentration of all pollutants on this site and the presence of relevant receptors, and;
(ii) The results from the application of an appropriate risk assessment
methodology.
(c) No development approved by this permission (other than that necessary for the discharge of this condition) shall be commenced until a Remediation Method Statement report; if required as a result of (b), above; has been submitted to and approved by the Local Planning Authority.
(d) This site shall not be occupied, or brought into use, until:
(i) All works which form part of the Remediation Method Statement report pursuant to the discharge of condition (c) above have been fully completed and if required a formal agreement is submitted that commits to ongoing monitoring and/or maintenance of the remediation scheme.
(ii) A Remediation Verification Report confirming that the site is suitable for use has been submitted to, and agreed by, the Local Planning Authority.
Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development, in accordance with Core Strategy (2013) Policy CS32.
3. Any contamination, other than that reported by virtue of Condition 2, encountered during the development of this site shall be brought to the attention of the Local Planning Authority as soon as practically possible; a scheme to render this contamination harmless shall be submitted to and agreed by, the Local Planning Authority and subsequently fully implemented prior to the occupation of this site. Works shall be temporarily suspended, unless otherwise agreed in writing during this process because the safe development and secure occupancy of the site lies with the developer.
Reason: To ensure that the issue of contamination is adequately addressed and to ensure a satisfactory development, in accordance with Core Strategy (2013) Policy CS32.
4. No development shall commence until full details (in the form of scaled plans and/or written specifications) have been submitted and approved in writing by the Local Planning Authority to illustrate the following:
o Surface water drainage. Arrangement shall be made for surface water to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.
o Proposed front boundary wall of a height of no greater than 0.6m to ensure that visibility levels for vehicles and pedestrians are maximised. This would need to be permanently maintained.
Reason: To ensure suitable, safe and satisfactory planning and development of the site in accordance with Policy 5 of Hertfordshire's Local Transport Plan (adopted 2018).
5. Prior to the first use of the development hereby permitted the vehicular accesses and associated highway works shall be provided and thereafter retained at the position shown on the approved plan drawing number 1105 02. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.
Reason: To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway in accordance with Policy 5 of Hertfordshire's Local Transport Plan (adopted 2018).
6. No development (excluding demolition/ground works) shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.
Reason: To ensure satisfactory appearance to the development and to safeguard the visual character of the area in accordance with Policies CS11, CS12 and CS27 of the Dacorum Borough Core Strategy (2013).
7. No construction of the superstructure shall take place until full details of both hard and soft landscape works has been submitted to and approved in writing by the Local Planning Authority. These details shall include:
o all external hard surfaces within the site
o other surfacing materials
o means of enclosure (including heights of fences / walls etc.)
o soft landscape works including a planting scheme with the number, size, species and position of trees, plants and shrubs
o minor artefacts and structures (e.g. refuse or other storage units).
The planting must be carried out within one planting season of completing the development.
Any tree or shrub, which forms part of the approved landscaping scheme, which within a period of 5 years from planting fails to become established, becomes seriously damaged or diseased, dies or for any reason is removed shall be replaced in the next planting season by a tree or shrub of a similar species, size and maturity.
Reason: To improve the appearance of the development and its contribution to biodiversity and the local environment, as required by saved Policy 99 of the Dacorum Borough Local Plan (2004) and Policy CS12 (e) of the Dacorum Borough Council Core Strategy (2013).
8. The development hereby permitted shall be carried out in accordance with the following approved plans/documents:
1105 01 A (PROPOSED PLANS AND ELEVATIONS)
1105 02 (PROPOSED SITE PLAN)
Reason: For the avoidance of doubt and in the interests of proper planning.
Informatives:
1. Planning permission has been granted for this proposal. The Council acted pro-actively through early engagement with the applicant at the pre-application stage and through the course of the application, which lead to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.
2. In accordance with the councils adopted criteria, all noisy works associated with site demolition, site preparation and construction works shall be limited to the following hours: 0730hrs to 1730hrs on Monday to Friday, 08:00 - 13:00 Saturday and no works are permitted at any time on Sundays or bank holidays.
3. Dust from operations on the site should be minimised by spraying with water or by carrying out of other such works that may be necessary to suppress dust. Visual monitoring of dust is to be carried out continuously and Best Practical Means (BPM) should be used at all times. The applicant is advised to consider the control of dust and emissions from construction and demolition Best Practice Guidance, produced in partnership by the Greater London Authority and London Councils.
4. The attention of the applicant is drawn to the Control of Pollution Act 1974 relating to the control of noise on construction and demolition sites.
5. The Environmental Health Team has a web-page that aims to provide advice to potential developers, which includes a copy of a Planning Advice Note on "Development on Potentially Contaminated Land and/or for a Sensitive Land Use" in use across Hertfordshire and Bedfordshire. This can be found on www.dacorum.gov.uk by searching for contaminated land.
6. Where works are required within the public highway to facilitate the new or amended vehicular access, the Highway Authority require the construction of such works to be undertaken to their satisfaction and specification, and by a contractor who is authorised to work in the public highway. If any of the works associated with the construction of the access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) the applicant will be required to bear the cost of such removal or alteration. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission, requirements and for the work to be carried out on the applicant's behalf. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/changes-to-your-road/dropped-kerbs/dropped-kerbs.aspx or by telephoning 0300 1234047.
7. The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land, which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspxor by telephoning 0300 1234047.
8. It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website
https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/highways-roads-and-pavements.aspx or by telephoning 0300 1234047.
Councillor Oguchi left the meeting at 9.15pm
Supporting documents: