Minutes:
Councillor Durrant arrived at 7:13pm and, therefore, did not participate or vote on this item.
Robert Freeman introduced the report to Members on behalf of the Case Officer.
Michael Caldwell spoke in objection to the application.
Theo Naylor spoke in support of the application.
It was proposed by Councillor Wyatt-Lowe and seconded by Councillor Maddern to GRANT the application in line with the officer’s recommendation.
Vote:
For: 7 Against: 0 Abstained: 3
Resolved: That planning permission be GRANTED subject to the following conditions:
1. The development hereby permitted shall begin before the expiration of three years from the date of this permission.
Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.
2. No above ground development shall take place until details of the materials to be used in the construction of the external surfaces of the semi-detached pair of dwellings hereby permitted have been submitted and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Please do not send materials to the Council offices. Materials should be kept on site and arrangements made with the Planning Officer for inspection.
Reason: To ensure satisfactory appearance to the development and to safeguard the visual character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013).
3. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the Local Planning Authority: Schedule 2 Part 1 Classes A, B, C, D, E, F.
Reason: To enable the Local Planning Authority to retain control over the development in the interests of safeguarding the residential and visual amenity of the locality in accordance with Policy CS12 of the Dacorum Borough Core Strategy (2013) and Paragraph 127 of the National Planning Policy Framework (2019).
4. No above ground development shall take place until full details of both hard and soft landscape works has been submitted to and approved in writing by the Local Planning Authority. These details shall include:
Hard surfacing materials;
Means of enclosure;
Bin storage facilities
Soft landscape works which shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate;
trees to be retained and measures for their protection during construction works;
Proposed finished levels or contours;
Minor artefacts and structures (e.g. furniture, play equipment, refuse or other storage units, signs, lighting etc);
The planting must be carried out within one planting season of completing the development.
Any tree or shrub which forms part of the approved landscaping scheme which within a period of 5years from planting fails to become established, becomes seriously damaged or diseased, dies or for any reason is removed shall be replaced in the next planting season by a tree or shrub of a species, size and maturity.
Reason: To improve the appearance of the development and its contribution to biodiversity and the local environment, as required by saved Policy 99 of the Dacorum Borough Local Plan (2004) and Policy CS12 (e) of the Dacorum Borough Council Core Strategy (2013).
5. No development, other than the conversion works to the existing building shall take place until a Phase I Report to assess the actual or potential contamination at the site has been submitted to and approved in writing by the Local Planning Authority. If actual or potential contamination and/or ground gas risks are identified, further investigation shall be carried out and a Phase II report shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development. If the Phase II report establishes that remediation or protection measures are necessary, a Remediation Statement shall be submitted to and approved in writing by the Local Planning Authority.
For the purposes of this condition:
(i) A Phase I Report consists of a desk study, site walkover, conceptual model and a preliminary risk assessment. The desk study comprises a search of available information and historical maps which can be used to identify the likelihood of contamination. A simple walkover survey of the site is conducted to identify pollution linkages not obvious from desk studies. Using the information gathered, a 'conceptual model' of the site is constructed and a preliminary risk assessment is carried out.
(ii) A Phase II Report consists of an intrusive site investigation and risk assessment. The report should make recommendations for further investigation and assessment where required.
(iii) A Remediation Statement details actions to be carried out and timescales so that contamination no longer presents a risk to site users, property, the environment or ecological systems.
Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other off-site receptors in accordance with Policy CS32 of the Dacorum Borough Core Strategy (2013) and Paragraphs 178 and 180 of the National Planning Policy Framework (2019).
6. All remediation or protection measures identified in the Remediation Statement referred to in Condition 5 above shall be fully implemented within the timescales and by the deadlines as set out in the Remediation Statement and a Site Completion Report shall be submitted to and approved in writing by the Local Planning Authority prior to the first occupation of any part of the development hereby permitted.
For the purposes of this condition: a Site Completion Report shall record all the investigation and remedial or protection actions carried out. It shall detail all conclusions and actions taken at each stage of the works including validation work. It shall contain quality assurance and validation results providing evidence that the site has been remediated to a standard suitable for the approved use.
Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other off-site receptors in accordance with Policy CS32 of the Dacorum Borough Core Strategy (2013) and Paragraphs 178 and 180 of the National Planning Policy Framework (2019).
7. Prior to the occupation of the development hereby approved full details of fire hydrants and other measures to protect the development from fire will be submitted to and approved in writing by the local planning authority. Such details shall include provision of the mains water services for the development whether by means of existing water services, new mains, or extension to or diversion of existing services where the provision of fire hydrants is considered necessary. As there is insufficient access and turning facilities, a rising main or suppressing system must be installed for Plots 3 & 4. The proposed development shall not be occupied until such measures have been implemented in accordance with the approved details and thereafter maintained as such.
Reason: To enable appropriate development to occur, ensure a safe, sustainable form of development which provides for its own infrastructure for fire emergencies in accordance with core strategy policies CS1, CS4, CS12 & CS29.
8. The development hereby permitted shall be carried out in accordance with the following approved plans/documents:
NT/ADY/002
NT/ADY/003
NT/ADY/004
NT/ADY/005
NT/ADY/006
NT/ADY/007
NT/ADY/008
Reason: For the avoidance of doubt and in the interests of proper planning.
Informatives:
1. Planning permission/advertisement consent/listed building consent has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant during the determination process which led to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.
Supporting documents: