Issue - meetings

21/02925/FUL - Change of use from Sui Generis to C3 residential. Construction of two pairs of semi detached dwellings comprising two four bedroom properties and two three bedroom properties - Land To R/O Wigginton Garage, Chesham Road, Wigginton, Her

Meeting: 10/02/2022 - Development Management (Item 5)

5 21/02925/FUL - Change of use from Sui Generis to C3 residential. Construction of two pairs of semi detached dwellings comprising two four bedroom properties and two three bedroom properties - Land To R/O Wigginton Garage, Chesham Road, Wigginton, Hertfordshire, HP23 6EJ pdf icon PDF 318 KB

Minutes:

Cllr Hollinghurst declared that he was approached by residents regarding this application however he came to the item with an open mind and was able to take part in the discussion and vote

 

The report was introduced by the case officer Colin Lecart

 

It was proposed by Councillor Williams  and seconded by Councillor Douris that the application be Granted     

 

Vote:

 

For:  10               against:  1                Abstained: 1

 

Resolved:  Granted

Condition(s) and Reason(s):

 

 1.        The development hereby permitted shall begin before the expiration of three years from the date of this permission.

           

            Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

 2.        The development hereby permitted shall be carried out in accordance with the following approved plans/documents:

           

            TGCR/21/PL01C

            TGCR/21/PL02A

            TGCR/21/PL03

            TGCR/21/PL04A

            TGCR/21/PL05

            LP/WGTBWH/020B

            Landscaping Statement (Davide Clarke Chartered Landscape Architet and Consultant Arboriculturist) (Submitted 04.02.2022)

            CS29 Checklist (July 2021)

           

            Reason:  For the avoidance of doubt and in the interests of proper planning.

 

 3.        The development hereby permitted shall be constructed in accordance with the materials specified on the application form.

           

            Reason:  To make sure that the appearance of the building is suitable and that it contributes to the character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013).

 

 4.        Tree protection measures before and during the construction phases of the development shall be implemented and carried out in accordance with Tree Protection Plan TPP/WGTBWH/010A and the submitted Arboricultural Method Statement (David Clarke Chartered Landscape Architect and Consultant Arboriculturist - 04.02.2022).

           

            Reason:  In order to ensure that damage does not occur to trees and hedges during building operations in accordance with saved Policy 99 of the Dacorum Borough Local Plan (2004), Policy CS12 of the Dacorum Borough Core Strategy (2013) and Paragraph 174 of the National Planning Policy Framework (2021).

 

 5.        The landscaping works shown on drawing LPWGTBWH/020B and detailed within the submitted Landscape Statement (David Clarke Chartered Landscape Architect and Consultant Arboriculturist - submitted January 2022) must be carried out within one planting season of completing the development.

           

            Any tree or shrub which forms part of the approved landscaping scheme which within a period of 5 years from planting fails to become established, becomes seriously damaged or diseased, dies or for any reason is removed shall be replaced in the next planting season by a tree or shrub of a species, size and maturity.

           

            Reason:  To improve the appearance of the development and its contribution to biodiversity and the local environment, as required by saved Policy 99 of the Dacorum Borough Local Plan (2004) and Policy CS12 (e) of the Dacorum Borough Council Core Strategy (2013).

 

 6.        No development shall commence until a Construction Management Plan (or Construction Method Statement)* has been submitted to and approved in writing by the Local Planning Authority, including elements of the CLOCS standards as set out in the  ...  view the full minutes text for item 5