21/03989/FUL - Demolition of 31 residential garages and construction of 4 no. dwelling houses - Garage Court, Dione Road, Hemel Hempstead, Hertfordshire

Meeting: 13/01/2022 - Development Management (Item 5)

5 21/03989/FUL - Demolition of 31 residential garages and construction of 4 no. dwelling houses - Garage Court, Dione Road, Hemel Hempstead, Hertfordshire pdf icon PDF 301 KB

Minutes:

The report was introduced by the case officer Martin Stickley

 

Martin highlighted an amendment to paragraphs 9.16 and 9.32 to update on the number of new trees proposed and CIL Zone charges:

 

9.16 Two new trees are proposed, and not the four stated in the report.

 

9.32 Policy CS35 requires all developments to make appropriate contributions towards infrastructure required to support the development. The Charging Schedule clarifies that the site is in Zone 3 within which a current charge of £131.10 per square metre is applicable to this development. This will decrease to £130.71 as of 1 January 2022.

 

It was proposed by Councillor Williams and seconded by Councillor Douris that it be Granted

 

 

Vote:

 

For:  9              against:  0                   Abstained: 1

 

Resolved; Granted

 

Condition(s) and Reason(s):

 

 1.        The development hereby permitted shall begin before the expiration of three years from the date of this permission.

           

            Reason:  To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004.

 

 2.        No development shall take place until the final design of the drainage scheme is completed and sent to the LPA for approval. The surface water drainage system will be based on the submitted the Flood Risk Assessment and Drainage Strategy reference M03001-04_FR05 dated December 2020 prepared by McCloy Consulting. The scheme shall also include:

           

            1. Limiting the surface water run-off rates to a maximum of 2l/s for all rainfall events up to and including the 1 in 100 year + climate change event with discharge into the Thames surface Water sewer.

            2. Provide attenuation to ensure no increase in surface water run-off volumes for all rainfall events up to and including the 1 in 100 year + climate change event.

            3. Implement drainage strategy to include permeable paving and attenuation tank.

            4. Detailed engineered drawings of the proposed SuDS features including their location, size, volume, depth and any inlet and outlet features including any connecting pipe runs and all corresponding calculations/modelling to ensure the scheme caters for all rainfall events up to and including the 1 in 100 year + 40% allowance for climate change event, with a supporting contributing area plan.

            5. Demonstrate appropriate SuDS management and treatment for the entire site including the access road. To include exploration of source control measures and to include above ground features such as permeable paving.

            6. Exceedance routes and details of any informal flooding areas for all events over the 1 in 30 year rainfall event.

            7. Maintenance and management plan for the SuDS features.

           

            Reason: To prevent flooding by ensuring the satisfactory storage of and disposal of surface water from the site in accordance with Policy CS31 of the Dacorum Borough Core Strategy (2013) and  Paragraph 169 of the National Planning Policy Framework (2021).

 

 3.        (a)        The Local Planning Authority is of the opinion that the Preliminary Investigation Report submitted at the planning application stage (Document Reference: RSK Preliminary  ...  view the full minutes text for item 5