Decision Maker: Assistant Director - Legal and Democratic Services
Decision status: Recommendations Approved
Is Key decision?: No
Is subject to call in?: No
A hole appeared in mid-October in an area of
public open space adjacent to No. 30 Highbarns and arrangements
made for geotechnical engineers to visit the site.
The collapse has revealed a brick shaft approximately 1.2m in
diameter that appears to be a former well.
Land close to this area has had stabilisation works carried out to
it over the past decade.
Intrusive ground investigation work was carried out around the
collapse feature to ascertain the extent of the sub-surface and
loosened ground to enable the design of remedial works.
Initial results of the dynamic probing has identified a void
running from the edge of the collapsed feature towards No. 30 East
Green, and the rough scope of this void has been identified as
being approximately 13.5 m x 4 m.
Cabinet have agreed to the use of the Dacorum Development Reserve
to fund the remediation works.
Cabinet have delegated authority to award a contract for the
remediation work to the Assistant Director Corporate.
To award a contract to BAM Ritchies to carry
out the remediation work.
The remediation contract costs are £295,000, and are based
upon the estimated volume of material to fill the void. The volume
of material will be remeasured and costed once the compaction grout
is mechanically pumped in to the void.
Consultation on the award of this contract has taken place between
the Leader of the Council and the Corporate Director of
Finance
There does not appear to be any other options
other than remediation.
Fencing off the site has been a temporary solution to ensure no one
falls in the void but this does not prevent the wider issue of a
further collapse if the void is not filled.
Publication date: 07/07/2021
Date of decision: 23/06/2021